Virgil C. Summer Unit 1 Submittal of Corrected Revision 21 to Updated Final Safety Analysis Report.
Accession Number: ML21209A581
Date Released: Wednesday, December 1, 2021
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML21209A135 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Frontmatter (103 page(s), 4/30/2021)
- ML21209A187 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant (177 page(s), 4/30/2021)
- ML21209A143 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics (1215 page(s), 4/30/2021)
- ML21209A153 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems (811 page(s), 4/30/2021)
- ML21209A115 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 4, Reactor (283 page(s), 4/30/2021)
- ML21209A207 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System (303 page(s), 4/30/2021)
- ML21209A194 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (566 page(s), 4/30/2021)
- ML21209A160 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation And Controls (288 page(s), 4/30/2021)
- ML21209A141 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Electric Power (251 page(s), 4/30/2021)
- ML21209A145 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems (342 page(s), 4/30/2021)
- ML21209A178 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System (141 page(s), 4/30/2021)
- ML21209A112 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management (181 page(s), 4/30/2021)
- ML21209A126 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection (163 page(s), 4/30/2021)
- ML21209A189 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 13, Conduct Of Operations (52 page(s), 4/30/2021)
- ML21209A158 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests And Operation (155 page(s), 4/30/2021)
- ML21209A122 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses (443 page(s), 4/30/2021)
- ML21209A165 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications (2 page(s), 4/30/2021)
- ML21209A146 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance (52 page(s), 4/30/2021)
- ML21209A172 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 18, Aging Management Programs And Activities (31 page(s), 4/30/2021)
- ML21209A431 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.2.7 - Redacted (1 page(s), 4/30/2021)
- ML21209A407 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.2-1 - Redacted (1 page(s), 4/30/2021)
- ML21209A199 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.2-10 - Redacted (1 page(s), 4/30/2021)
- ML21209A150 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.2-11 - Redacted (1 page(s), 4/30/2021)
- ML21209A164 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 1, 1.2-12, 12.1-15 - Redacted (1 page(s), 4/30/2021)
- ML21209A202 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.2-13 - Redacted (1 page(s), 4/30/2021)
- ML21209A196 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.2-14 - Redacted (1 page(s), 4/30/2021)
- ML21209A205 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.2-15, 12.1-19, 12a.4-7 - Redacted (1 page(s), 4/30/2021)
- ML21209A197 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.2-16, 12.1-19a - Redacted (1 page(s), 4/30/2021)
- ML21209A177 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 1, Figures 1.2-17, And 12.1-20: Redacted (1 page(s), 4/30/2021)
- ML21209A181 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.2-18 - Redacted (1 page(s), 4/30/2021)
- ML21209A151 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.2-19 - Redacted (1 page(s), 4/30/2021)
- ML21209A429 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.2-2 - Redacted (1 page(s), 4/30/2021)
- ML21209A156 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.2-20 - Redacted (1 page(s), 4/30/2021)
- ML21209A200 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.2-21 - Redacted (1 page(s), 4/30/2021)
- ML21209A169 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.2-22 - Redacted (1 page(s), 4/30/2021)
- ML21209A123 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.2-23 And 1.2-24 - Redacted (1 page(s), 4/30/2021)
- ML21209A175 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.2-23 - Redacted (1 page(s), 4/30/2021)
- ML21209A152 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.2-25, 12.1-5 - Redacted (1 page(s), 4/30/2021)
- ML21209A133 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.2-26 - Redacted (1 page(s), 4/30/2021)
- ML21209A167 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.2-27 - Redacted (1 page(s), 4/30/2021)
- ML21209A137 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.2-28 - Redacted (1 page(s), 4/30/2021)
- ML21209A139 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.2-28a: Redacted (1 page(s), 4/30/2021)
- ML21209A162 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.2-29_Redacted (1 page(s), 4/30/2021)
- ML21209A455 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.2-3, 12.1-2, And 12.1-11: Redacted (1 page(s), 4/30/2021)
- ML21209A357 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.2-4 - Redacted (1 page(s), 4/30/2021)
- ML21209A335 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.2-5, 12.1-14, Redacted (1 page(s), 4/30/2021)
- ML21209A373 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Figures 1.2-6, 12.1-16, 12A.4-6, Redacted (1 page(s), 4/30/2021)
- ML21209A190 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.2-8 - Redacted (1 page(s), 4/30/2021)
- ML21209A159 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.2-9 And 12.1-18: Redacted (1 page(s), 4/30/2021)
- ML21209A417 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 10, Figure 10.2-2, Control Diagram Turbine Stop Valve (1 page(s), 4/30/2021)
- ML21209A315 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 10, Figure 10.2-3A, Control Diagram Turbine Control Valve (1 page(s), 4/30/2021)
- ML21209A393 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 10, Figure 10.3-1, Piping System Flow Diagram Main Steam (Nuclear) (1 page(s), 4/30/2021)
- ML21209A283 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 10, Figure 10.3-2, Piping System Flow Diagram Main Steam (Non-Nuclear) (1 page(s), 4/30/2021)
- ML21209A432 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 10, Figure 10.3-3, Piping System Flow Diagram Main & Reheat Steam (Non-Nuclear) (1 page(s), 4/30/2021)
- ML21209A409 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 10, Figure 10.4-3, Man Steam System Steam Dump/Turbine Bypass (MS) (1 page(s), 4/30/2021)
- ML21209A221 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 10, Figure 10.2-4, Control Diagram Turbine Trip. (1 page(s), 4/30/2021)
- ML21209A299 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 10, Figure 10.3-4, Piping System Flow Diagram Main Steam Dump System. (1 page(s), 4/30/2021)
- ML21209A422 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 10, Figure 10.4-5, Piping System Flow Diagram Circulating Water Cooling (1 page(s), 4/30/2021)
- ML21209A267 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 10, Figure 10.4-6, Piping System Flow Diagram Circulating Water Cooling. (1 page(s), 4/30/2021)
- ML21209A443 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 10, Figure 10.4-10, Piping System Flow Diagram Feedwater (Non-Nuclear) (1 page(s), 4/30/2021)
- ML21209A228 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 10, Figure 10.4-11, Piping System Flow Diagram Feedwater (Non-Nuclear) (1 page(s), 4/30/2021)
- ML21209A435 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 10, Figure 10.4-12, Piping System Flow Diagram Feedwater (Nuclear) (1 page(s), 4/30/2021)
- ML21209A233 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 10, Figure 10.4-13, Piping System Flow Diagram Steam Generator Blowdown. (1 page(s), 4/30/2021)
- ML21209A447 - Virgil C. Summer, Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 10, Figure 10.4-14, Nuclear Blowdown Processing System Holdup Tank and Demineralizer Design Engineering. (4/30/2021)
- ML21209A216 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 10, Figure 10.4-15, Piping System Flow Diagram Nuclear Blowdown Processing System Spent Resin Storage Tank. (1 page(s), 4/30/2021)
- ML21209A441 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 10, Figure 10.4-17, Piping System Flow Diagram Liquid Effluents from Nuclear Plant to Fairfield Penstock. (1 page(s), 4/30/2021)
- ML21209A301 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 10, Figure 10.4-4 Sheet 1, Design Engineering. (1 page(s), 4/30/2021)
- ML21209A284 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 10, Figure 10.4-4, Revision 3, Sheet 2, Main Steam System Steam Dump/Turbine Bypass (MB) (1 page(s), 4/30/2021)
- ML21209A371 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 11, Figure 10.4-7A, Revision 31, Piping System Flow Diagram Condensate Polishing (1 page(s), 4/30/2021)
- ML21209A285 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 11, Figure 11.3-4, Revision 19, Sheet 1 of 3, Piping System Flow Diagram Waste Processing (1 page(s), 4/30/2021)
- ML21209A398 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 11, Figure 11.3-4, Revision 11, Sheet 2, Piping System Flow Diagram Waste Processing (1 page(s), 4/30/2021)
- ML21209A376 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 11, Figure 11.3-4, Revision 17, Sheet 3, Piping System Flow Diagram Waste Processing (1 page(s), 4/30/2021)
- ML21209A473 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 12, Figure 12.1-1 - Redacted (1 page(s), 4/30/2021)
- ML21209A369 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 12, Figure 12.1-10 - Redacted (1 page(s), 4/30/2021)
- ML21209A476 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 12, Figure 12.1-11 - Redacted (1 page(s), 4/30/2021)
- ML21209A382 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 12, Figure 12.1-11a - Redacted (1 page(s), 4/30/2021)
- ML21209A306 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 12, Figure 12.1-12 - Redacted (1 page(s), 4/30/2021)
- ML21209A236 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 12, Figure 12.1-13 - Redacted (1 page(s), 4/30/2021)
- ML21209A330 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 12, Figure 12.1-14 - Redacted (1 page(s), 4/30/2021)
- ML21209A226 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 12, Figure 12.1-22 - Redacted (1 page(s), 4/30/2021)
- ML21209A329 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 12, Figure 12.1-16 - Redacted (1 page(s), 4/30/2021)
- ML21209A387 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 12, Figure 12.1-17 - Redacted (1 page(s), 4/30/2021)
- ML21209A479 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 12, Figure 12.1-18 - Redacted (1 page(s), 4/30/2021)
- ML21209A296 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 12, Figure 12.1-19 - Redacted (1 page(s), 4/30/2021)
- ML21209A328 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 12, Figure 12.1-19a - Redacted (1 page(s), 4/30/2021)
- ML21209A290 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 12, Figure 12.1-2 - Redacted (1 page(s), 4/30/2021)
- ML21209A378 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 12, Figure 12.1-22, Reactor Building - Miscellaneous Steel Fuel Transfer Canal Shielding. (1 page(s), 4/30/2021)
- ML21209A260 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 12, Figure 12.1-2a - Redacted (1 page(s), 4/30/2021)
- ML21209A331 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 12, Figure 12.1-3 - Redacted (1 page(s), 4/30/2021)
- ML21209A253 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 12, Figure 12.1-4 - Redacted (1 page(s), 4/30/2021)
- ML21209A211 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 12, Figure 12.1-5, Sheet 1 - Redacted (1 page(s), 4/30/2021)
- ML21209A349 - Virgil C. Summer, Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 12, Figure 12.1-5 Sht. 2_Redacted (4/30/2021)
- ML21209A252 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 12, Figure 12.1-6 - Redacted (1 page(s), 4/30/2021)
- ML21209A474 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 12, Figure 12.1-7 - Redacted (1 page(s), 4/30/2021)
- ML21209A295 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 12, Figure 12.1-8, Revision 22, Reactor and Fuel Handling Buildings, Section A-A Looking West (1 page(s), 4/30/2021)
- ML21209A367 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 12, Figure 12.1-9 - Redacted (1 page(s), 4/30/2021)
- ML21209A161 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.4-1, Plot Plan - Service Water Pond: North, South & East Dams: Circulating Water Discharge Canal And Jetty. (1 page(s), 4/30/2021)
- ML21209A203 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.4-6, Drawing E-744-052 Ref (1 page(s), 4/30/2021)
- ML21209A148 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.5-108, Drawing E-726-413 (1 page(s), 4/30/2021)
- ML21209A117 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.5-109, Drawing E-726-416. (1 page(s), 4/30/2021)
- ML21209A184 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-73, Revision 9, Plant Layout Final Auxiliary & Control Building Section H-H, Looking West (1 page(s), 4/30/2021)
- ML21209A125 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 5.0, Figure 5.1-1, Revision 8, Sheet 3B, Piping System Flow Diagram Reactor Coolant Design Engineering (1 page(s), 4/30/2021)
- ML21209A201 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.1-1-3C/Drawing E-302-605, Rev. 7, Piping System Flow Diagram Reactor Coolant. (1 page(s), 4/30/2021)
- ML21209A136 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.1-1, Sheet 2, Piping System Flow Diagram Reactor Coolant System. (1 page(s), 4/30/2021)
- ML21209A138 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.1-1 Sheet 3A, Piping System Flow Diagram Reactor Coolant. (1 page(s), 4/30/2021)
- ML21209A120 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.1-1, Sheet 1, Piping System Flow Diagram Reactor Coolant. (1 page(s), 4/30/2021)
- ML21209A171 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 6, Figure 6.2-70, Revision 10, Piping System Main Steam (Nuclear)-Reactor Building Plan & Sections Above Elev. 436'-0" Design Engineering (1 page(s), 4/30/2021)
- ML21209A157 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2-4, Reactor Vessel Support Shoe (1 page(s), 4/30/2021)
- ML21209A134 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2-8, Revision 21, Piping System Flow Diagram ECCS Check Valve Testing Design Engineering (1 page(s), 4/30/2021)
- ML21209A129 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2-8A, Piping System Flow Diagram NSSS Carbon Dioxide and Nitrogen Supply (1 page(s), 4/30/2021)
- ML21209A195 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 6, Figure 6.2-82, Revision 17.Piping System Reactor Building Spray System - Auxiliary Building Plan Below El. 412'-0" S of R.B. Centerline Design Engineering (1 page(s), 4/30/2021)
- ML21209A142 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 6, Figure 6.2-83, Reactor Building Spray System - Auxiliary Building Plan Below El. 397'-0" (1 page(s), 4/30/2021)
- ML21209A192 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 6, Figure 6.2-84, Piping System Reactor Building Spray System - Auxiliary Building Sections & Details. (1 page(s), 4/30/2021)
- ML21209A166 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.5-4, Piping System Flow Diagram Residual Heat Removal. (1 page(s), 4/30/2021)
- ML21209A348 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 10, Figure 10.2-5, Piping System Flow Diagram Generator Gas & Vents (1 page(s), 4/30/2021)
- ML21209A155 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2-9, Piping System Reactor Building Cooling Unit Drain. (1 page(s), 4/30/2021)
- ML21209A183 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 6, Figure 6.2-46, Revision 35, Reactor Building Spray System (1 page(s), 4/30/2021)
- ML21209A144 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 6, Figure 6.2-47, Piping System Reactor Building Spray System Reactor Building Above Elevation 524'-0" (1 page(s), 4/30/2021)
- ML21209A176 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 6, Figure 6.2-49, Building Service System Flow Diagram, R.B. Cooling System (1 page(s), 4/30/2021)
- ML21209A170 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 6, Figure 6.2-50, Sheet 1, Drawing E-922-101 (1 page(s), 4/30/2021)
- ML21209A114 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 6, Figure 6.2-50, Sheet 2, Drawing E-922-102 (1 page(s), 4/30/2021)
- ML21209A193 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 6, Figure 6.2-50, Sheet 3, Drawing E-922-103 (1 page(s), 4/30/2021)
- ML21209A130 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 6, Figure 6.2-50, Sheet 4, Drawing E-922-104 (1 page(s), 4/30/2021)
- ML21209A131 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 6, Figure 6.2-60A, Revision 3, I & C Detail Penetration #309 Details (1 page(s), 4/30/2021)
- ML21209A180 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 6, Figure 6.2-83, Drawing E-304-662 (1 page(s), 4/30/2021)
- ML21209A113 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 6, Figure 6.3.1 Sheet 1, Piping System Flow Diagram Safety Injection. (1 page(s), 4/30/2021)
- ML21209A191 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 6, Figure 6.3-1, Sheet 2, Revision 14, Safety Injection (1 page(s), 4/30/2021)
- ML21209A173 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 6, Figure 6.3-1 Sheet 3, Piping System Flow Diagram Safety Injecion. (1 page(s), 4/30/2021)
- ML21209A128 - Virgil C. Summer, Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Functional Diagrams Index and Symbols. (4/30/2021)
- ML21209A204 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Sheet 14, Functional Diagrams Auxiliary Feedwater Pumps Startup. (1 page(s), 4/30/2021)
- ML21209A149 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1 Sheet 15, Functional Diagrams Turbine Tip Runback And Other Signals. (1 page(s), 4/30/2021)
- ML21209A182 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Sheet 5, Functional Diagrams Primary Coolant System Trip Signals (1 page(s), 4/30/2021)
- ML21209A198 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1 Sheet 8, Functional Diagrams Safeguard Actuation Signals. (1 page(s), 4/30/2021)
- ML21209A163 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-1, ESF Loading Sequence System (1 page(s), 4/30/2021)
- ML21209A124 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.4-1, Revision L, Front View Arrangement Control Room Evacuation Panel XPN-7200-CE (1 page(s), 4/30/2021)
- ML21209A206 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.5-1, Containment Isolation A And Safety Injection ESF Monitor Lights. (1 page(s), 4/30/2021)
- ML21209A185 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.5-2, Containment Isolation Phase B and Control Room Ventilation Isolation ESF Monitor Lights (1 page(s), 4/30/2021)
- ML21209A465 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.5-3, Revision 15, I & C Monitor Lights Safety Injection (BOP) ESF Monitor Lights (1 page(s), 4/30/2021)
- ML21209A437 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.5-4, Reactor Building Spray ESF Monitor Lights (1 page(s), 4/30/2021)
- ML21209A366 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.6-3A, Piping System Auxiliary Steam & Condensate Inter. Y Aux Buildings Plans & Isometric Below EL 485'-0" (1 page(s), 4/30/2021)
- ML21209A442 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.6-4, Revision 13, Auxiliary Steam Auxiliary Building Plan and Section Below El 436'-0" (1 page(s), 4/30/2021)
- ML21209A313 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.6-5, Piping System Auxiliary Steam Intermediate & Aux. Buildings Plans Below EL. 463'-0" (1 page(s), 4/30/2021)
- ML21209A244 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.6-6, Piping System Chemical Volume Control System Auxiliary Building Plan Below EL. 436'-0= North of R.B Center Line. (1 page(s), 4/30/2021)
- ML21209A241 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.6-7, Revision 8, Piping System Chemical Volume Control Sys.-Aux. Bldg. Plan & Sections Below El. 436'-0" South of R.B. Center Line (1 page(s), 4/30/2021)
- ML21209A279 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.6-8, Piping System Chemical Volume Control System-Pen Access Areas Plan & Sections Below EL. 436'-0" (1 page(s), 4/30/2021)
- ML21209A281 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-2b, Electrical Duct Funs for Diesel Generator Circuits Main Plant Area - East End. (1 page(s), 4/30/2021)
- ML21209A456 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-2c, Electrical Duct Runs for Diesel Generator Circuits Outdoor Area - East End. (1 page(s), 4/30/2021)
- ML21209A247 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-2d, Electrical Duct Runs for Diesel Generator Circuits To Service Water Intake Structure. (1 page(s), 4/30/2021)
- ML21209A370 - Virgil C Summer, Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.2-1, Design Engineering. (4/30/2021)
- ML21209A451 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.2-2, Electrical One Line Diagram 230KV Substation Layout. (1 page(s), 4/30/2021)
- ML21209A475 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.2-2A, Electrical General Arrangement 230 KV Substation Arrangement. (1 page(s), 4/30/2021)
- ML21209A360 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.2-2b, Electrical 230KV Substation Arrangements Plan - Bus Sections 2 & 3. (1 page(s), 4/30/2021)
- ML21209A309 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.2-2c, Electrical 230KV Substation Arrangement Plan - Bus Sections 1 & 3. (1 page(s), 4/30/2021)
- ML21209A337 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.2-2d, Electrical Overhead Line Arrangement 230KV And 115KV Outdoor Transformer Area. (1 page(s), 4/30/2021)
- ML21209A334 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.2-3, Electrical One Line and Relay Diagram Balance of Plant Power System Design Engineering (1 page(s), 4/30/2021)
- ML21209A446 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.2-4, Electrical One Line And Relay Diagram Engineered Safety Features Power System. (1 page(s), 4/30/2021)
- ML21209A314 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-0b.1, Outdoor Cable Bus Layout & Sections Safeguard Transformer Area (1 page(s), 4/30/2021)
- ML21209A438 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-0, Outdoor Cable BUs Layout & Sections Emergency Auxiliary Transformer Area. (1 page(s), 4/30/2021)
- ML21209A249 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-0A, Revision 3, Outdoor Cable Bus Layout & Sections Unit Auxiliary Transformer Area (1 page(s), 4/30/2021)
- ML21209A311 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-0B, Revision 4, Outdoor Cable Bus Layout & Sections Safeguard Transformer Area (1 page(s), 4/30/2021)
- ML21209A354 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-0c, Revision 4, Indoor Cable Bus Layout & Sections Plan View. Elevation 436-0" (1 page(s), 4/30/2021)
- ML21209A229 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-0D, Revision 5, Indoor Cable Bus Layout & Sections Plan View, Elevation 436'-0" (1 page(s), 4/30/2021)
- ML21209A372 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-0E, Revision 4, Indoor Bus and Cable Layout & Sections Plan View, Election 412'-0" (1 page(s), 4/30/2021)
- ML21209A303 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-0f, Revision 4, Indoor Cable Bus Layout & Sections Plan View, Elevation 412'-0', Col.8 to 11.1 & Col. A to C (1 page(s), 4/30/2021)
- ML21209A383 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8. Figure 8.3-0G, Revision 4, Indoor Bus Layout & Sections Plan View, Election 412'-0" (1 page(s), 4/30/2021)
- ML21209A320 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-0H, Revision 3, Electrical Diesel Generator Starting Control Logic Diagram (1 page(s), 4/30/2021)
- ML21209A448 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-01, Electrical Diesel Generator Shutdown Control Logic Diagram (1 page(s), 4/30/2021)
- ML21209A242 - Virgil C. Summer, Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-0J, Revision 5, Electrical Diesel Generator Breaker Logic Diagram (1 page(s), 4/30/2021)
- ML21209A385 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-0K, Electrical 7.2 KV Bus IDA - Normal Incoming Breaker (1 page(s), 4/30/2021)
- ML21209A379 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-01, Revision 4, Electrical 7.2 KV 1DA - Emergency Incoming Breaker Logic Diagram (1 page(s), 4/30/2021)
- ML21209A298 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-0o, Electrical, 7.2 KV Bus 1DA-1DB Undervoltage Relaying Logic Diagram (1 page(s), 4/30/2021)
- ML21209A425 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-1, Revision 41, Sheet 1, Elec. One Line and Relay Diagram Engineered Safety Features Vital AC Sys. (1 page(s), 4/30/2021)
- ML21209A478 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-2, Electrical One Line and Relay Program Engineered and Safety Features Vital AC System (1 page(s), 4/30/2021)
- ML21209A273 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-2a, Revision 14, Electrical Duct Runs For Diesel Generator Circuits. (1 page(s), 4/30/2021)
- ML21209A240 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-2aa, Revision 21, Elec. One Line and Relay Diagram Vital DC System (1 page(s), 4/30/2021)
- ML21209A365 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-2ab, Electrical One Line And Relay Diagram Engineered Safety Features Vital DC System. (1 page(s), 4/30/2021)
- ML21209A459 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-2b, Revision 11, Electrical Duct Runs For Diesel Generator Circuits Main Plant Area - East End. (1 page(s), 4/30/2021)
- ML21209A231 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-2c, Revision 7, Electrical Duct Runs For Diesel Generator Circuits Outdoor Area - East End (1 page(s), 4/30/2021)
- ML21209A292 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-2d, Revision 7, Electrical Duct Runs For Diesel Generator Circuits To Service Water Intake Structure. (1 page(s), 4/30/2021)
- ML21209A439 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-2e, Revision 4, Miscellaneous Outdoor Structures Yard Duct Run - Turbine Building to Service Water Intake Structure (1 page(s), 4/30/2021)
- ML21209A471 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-2f, Revision 4, Miscellaneous Outdoor Structures Yard Duct Run Electrical Manhole (1 page(s), 4/30/2021)
- ML21209A220 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-2g, Revision 7, Electrical Duct Banks Control Complex & Intermediate Building & Turbine Building (1 page(s), 4/30/2021)
- ML21209A277 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-4, Electrical One Line and Relay Diagrams Balance of Plants - Vital AC - DC System (1 page(s), 4/30/2021)
- ML21209A346 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-4a, Electrical One Lline and relay Diagrams. (1 page(s), 4/30/2021)
- ML21209A268 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-4b, Revision 4, Electrical One Line and Relay Diagrams Balance of Plant - Vital AC-DC System (1 page(s), 4/30/2021)
- ML21209A324 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-5, Revision 17, Electrical 230 KV Substation D.C. Station Service Diagram (1 page(s), 4/30/2021)
- ML21209A300 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-5a, Revision 6, Electrical 230KV Substation Unit 1 Relay House DC One Line (1 page(s), 4/30/2021)
- ML21209A210 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-6, Revision 3, 125 VDC Main Dist. PNL (1 page(s), 4/30/2021)
- ML21209A293 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-7, Revision 6, 125V DC Main Distr. (1 page(s), 4/30/2021)
- ML21209A338 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-8, Revision 10, Electrical Reactor, Turbine and Generator Trip Diagram (1 page(s), 4/30/2021)
- ML21209A347 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-Oc, Revision 5, Indoor Cable Bus Layout & Sections Plan View, Elevation 436-0" (1 page(s), 4/30/2021)
- ML21209A317 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.G-2, Electrical Containment Penetration Conductor Overcurrent Protection Devices (1 page(s), 4/30/2021)
- ML21209A282 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.G-6, Revision 5, Electrical Containment Penetration Conductor Overcurrent Protection Devices (1 page(s), 4/30/2021)
- ML21209A391 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.G-8, Revision 6, Electrical Containment Penetration Conductor Overcurrent Protection Devices (1 page(s), 4/30/2021)
- ML21209A239 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.G-9, Revision 4, Sheet 9, Electrical Containment Penetration Conductor Overcurrent Protection Devices (1 page(s), 4/30/2021)
- ML21209A280 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.G-1, Revision 8, Sheet 1, Electrical Containment Penetration Conductor Overcurrent Protection Devices (1 page(s), 4/30/2021)
- ML21209A403 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8G-10, Revision 2, Electrical Containment Penetration Conductor Overcurrent Protection Devices (1 page(s), 4/30/2021)
- ML21209A237 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8G-2, Revision 3, Electrical Containment Penetration Conductor Overcurrent Protection Devices (1 page(s), 4/30/2021)
- ML21209A420 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.G-2, Revision 4, Sheet 2, Electrical Containment Penetration Conductor Overcurrent Protection Devices (1 page(s), 4/30/2021)
- ML21209A245 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8G-3, Revision 7, Electrical Containment Penetration Conductor Overcurrent Protection Devices (1 page(s), 4/30/2021)
- ML21209A361 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8G-4, Revision 9, Electrical Containment Penetration Conductor Overcurrent Protection Devices (1 page(s), 4/30/2021)
- ML21209A375 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8G-5, Electrical Containment Penetration Conductor Overcurrent Protection Devices (1 page(s), 4/30/2021)
- ML21209A275 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.G-6, Revision 5, Sheet 6, Electrical Containment Penetration Conductor Overcurrent Protection Devices (1 page(s), 4/30/2021)
- ML21209A269 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8G-7, Revision 5, Electrical Containment Penetration Conductor Overcurrent Protection Devices (1 page(s), 4/30/2021)
- ML21209A352 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.G-8, Revision 6, Sheet 8, Electrical Containment Penetration Conductor Overcurrent Protection Devices (1 page(s), 4/30/2021)
- ML21209A434 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 8, Figure 8G-9 (1 page(s), 4/30/2021)
- ML21209A322 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.1-3, Revision 51, Piping System Flow Diagram Spent Fuel Cooling (1 page(s), 4/30/2021)
- ML21209A454 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-1, D-302-221, Revision 32, Sheet 1, Piping System Flow Diagram Service Water Cooling (1 page(s), 4/30/2021)
- ML21209A258 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-1, Revision 27, Piping System Flow Diagram Service Water Cooling (1 page(s), 4/30/2021)
- ML21209A463 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-2, Revision 7, Sheet 1, Piping System Flow Diagram Service Water Cooling. (1 page(s), 4/30/2021)
- ML21209A214 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-2, Revision 1, Sheet 3, Piping System Flow Diagram Service Water Cooling B - Train Outside RB (1 page(s), 4/30/2021)
- ML21209A212 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-2, Sheet 1, Revision 0, Piping System Flow Diagram Service Water Cooling A-Train Outside RB (1 page(s), 4/30/2021)
- ML21209A412 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-2, Revision 0, Sheet 2, Piping System Flow Diagram System Service Water Cooling A-Train Cooling to RBCU, Loop (1 page(s), 4/30/2021)
- ML21209A436 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-2, Sheet 3, Revision 0, Piping System Flow Diagram Service Water Cooling B-Train Outside RB (1 page(s), 4/30/2021)
- ML21209A327 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-2, Revision 0, Sheet 4, Piping System Flow Diagram Service Water Cooling B-Train Cooling to RBCU Loop (1 page(s), 4/30/2021)
- ML21209A215 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-2, Revision 11, Sheet 1, Piping System Flow Diagram Service Water Cooling. (1 page(s), 4/30/2021)
- ML21209A248 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-2, D-302-222, Revision 4, Sheet 2, Piping System Flow Diagram Service Water Cooling A- Train Cooling to RBCU Loop (1 page(s), 4/30/2021)
- ML21209A390 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-2, D-302-222, Revision 5, Sheet 3, Piping System Flow Diagram Service Water Cooling B-Train Outside RB (1 page(s), 4/30/2021)
- ML21209A263 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-2, D-302-222-0001, Revision 10, Sheet 1, Piping System Flow Diagram Service Water Cooling A - Train Outside R8 (1 page(s), 4/30/2021)
- ML21209A266 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-2, D-302-222, Revision 4, Sheet 4, Piping System Flow Diagram Service Water Cooling 8 - Train Cooling to R8CU Loop (1 page(s), 4/30/2021)
- ML21209A377 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-2, Revision 58, Piping System Flow Diagram Service Water Cooling (1 page(s), 4/30/2021)
- ML21209A344 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-24, Revision 26, Piping System Flow Diagram Reactor Make-Up Water System (1 page(s), 4/30/2021)
- ML21209A466 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-24, 302-791, Revision 27, Piping System Flow Diagram Reactor Make-Up Water (1 page(s), 4/30/2021)
- ML21209A222 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-4, D-302-611, Revision 40, Piping System Flow Diagram Component Cooling. (1 page(s), 4/30/2021)
- ML21209A305 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-4, Revision 39, Piping System Flow Diagram Component Cooling (1 page(s), 4/30/2021)
- ML21209A272 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-5, Piping System Flow Diagram Component Cooling System Inside Reactor Building (1 page(s), 4/30/2021)
- ML21209A262 - Virgil C. Summer Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-5, Revision 27, Piping System Flow Diagram Component Cooling System Inside Reactor Building (1 page(s), 4/30/2021)
- ML21209A265 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-5 / Drawing D-302-612, Revision 28, Piping System Flow Diagram Component Cooling System Inside Reactor Building. (1 page(s), 4/30/2021)
- ML21209A325 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-6 / Drawing D-302-613, Revision 21, Piping System Flow Diagram Component Cooling System Mon. ESS. Equipment Cooling. (1 page(s), 4/30/2021)
- ML21209A307 - Virgil C. Summer, Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-7, D-302-614, Revision 16, Piping System Flow Diagram Component Cooling System to NSSS Pumps. (4/30/2021)
- ML21209A356 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-8, D-302-161, Revision 28, Piping System Flow Diagram Water Treatment System. (1 page(s), 4/30/2021)
- ML21209A336 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-9, Revision 23, Piping System Flow Diagram Demineralized Water (1 page(s), 4/30/2021)
- ML21209A388 - Viril C. Summer, Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-9A, D-302-162, Revision 15, Piping System Flow Diagram Filtered Water Design Engineering. (4/30/2021)
- ML21209A318 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-9b, Revision 20, Piping System Flow Diagram (1 page(s), 4/30/2021)
- ML21209A224 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-9B / Drawing D-302-164, Rev. 24, Piping System Flow Diagram Demineralized Water (1 page(s), 4/30/2021)
- ML21209A223 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-9b / Drawing D-302-164, Rev. 20, Piping, System Flow Diagram and Demineralized Water - Design Engineering (4/30/2021)
- ML21209A384 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-9b, Revision 19, Piping System Flow Diagram Demineralized Water (1 page(s), 4/30/2021)
- ML21209A374 - Virgil C. Summer, Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-9b_R21, Piping System Flow Diagram Demineralized Water Design Engineering. (4/30/2021)
- ML21209A389 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-9b, Revision 22, Piping System Flow Diagram Demineralized Water (1 page(s), 4/30/2021)
- ML21209A468 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-9c, Revision 5, Piping System Flow Diagram Domestic Water System (1 page(s), 4/30/2021)
- ML21209A342 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-1 / Drawing D-302-241, Rev. 39, Design Engineering (1 page(s), 4/30/2021)
- ML21209A261 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-10, Revision 9, Building Service Floor & Equipment Drawing Station Drainage Flow Diagram Intermediate Building, (1 page(s), 4/30/2021)
- ML21209A458 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-11, Revision 10, Building Service Plumbing Station Drainage Flow Diagram Fuel Handling Building (1 page(s), 4/30/2021)
- ML21209A254 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-12, Piping System Flow Diagram Reactor & Auxiliary Building Sump Pumps (1 page(s), 4/30/2021)
- ML21209A457 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-13, Revision 21, Piping System Flow Diagram Nuclear Drains to Waste Holdup Tank (1 page(s), 4/30/2021)
- ML21209A259 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-13A, Revision 7, Piping System Flow Diagram Nuclear Valve Leak-Off Drains to Recycle Holdup Tank (1 page(s), 4/30/2021)
- ML21209A461 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-14, Revision 32, Piping System Flow Diagram Non-Nuclear Plant Drains (1 page(s), 4/30/2021)
- ML21209A308 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-15, Revision 15, Plant Industrial and Sanitary Waste (1 page(s), 4/30/2021)
- ML21209A449 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-16, Sheet 1A, Piping System Flow Diagram Chemical and Volume Control (1 page(s), 4/30/2021)
- ML21209A470 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-16, Revision 14, Sheet 18, Piping System Flow System Chemical and Volume Control (1 page(s), 4/30/2021)
- ML21209A310 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-16, Sheet 1C, Piping System Flow Diagram Chemical and Volume Control (1 page(s), 4/30/2021)
- ML21209A289 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-16, Revision 14, Sheet 2, Piping System Flow Diagram Chemical and Volume Control (1 page(s), 4/30/2021)
- ML21209A218 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-16, Revision 14, Sheet 4, Piping System Flow Diagram Chemical and Volume Control (1 page(s), 4/30/2021)
- ML21209A227 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-16 Sheet 3 / Drawing D-302-675, Rev. 37, Piping System Flow Diagram, Chemical and Volume Control (1 page(s), 4/30/2021)
- ML21209A225 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-16, Revision 15, Sheet 5, Piping System Flow Diagram Chemical and Volume Control (1 page(s), 4/30/2021)
- ML21209A414 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-16, Sheet 1C / Drawing E-302-673, Rev. 20, Piping, System Flow Diagram, Chemical & Volume Control - Design Engineering (1 page(s), 4/30/2021)
- ML21209A400 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-16, S3 / Drawing E-302-675, Rev. 37, Piping System Flow Diagram and Chemical & Volume Control. (1 page(s), 4/30/2021)
- ML21209A452 - Virgil C. Summer, Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-16 / Drawing E-302-676, R15, System Flow Diagram Chemical and Volume Control. Sheet 4 (4/30/2021)
- ML21209A359 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-16 / Drawing 302-671, Rev. 11, Piping, System Flow Diagram, Chemical & Volume Control - Design Engineering (1 page(s), 4/30/2021)
- ML21209A323 - Virgil C. Summer, Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-1, D-912-140, Revision 30, Building Service System Flow Diagram Control Room Normal and Emergency Air Handling System. (4/30/2021)
- ML21209A453 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-2, Revision 46, Piping System Flow Diagram Instrument Air (1 page(s), 4/30/2021)
- ML21209A386 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-2, Revision 22, Building Service System Flow Diagram Relay and Computer Room Cooling System (1 page(s), 4/30/2021)
- ML21209A368 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-3, Piping System Flow Diagram actor Building Instrument Air Services (1 page(s), 4/30/2021)
- ML21209A445 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-4, Piping System Flow Diagram Nuclear Sampling (1 page(s), 4/30/2021)
- ML21209A232 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-6, Building Service Floor & Equipment Drains Station Drainage Flow Diagram - Aux. Building (1 page(s), 4/30/2021)
- ML21209A480 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-8, Building Service Floor & Equipment Drains Station Drainage Flow Diagram Turbine Building (1 page(s), 4/30/2021)
- ML21209A316 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-11, Building Services System Flow Diagram Fuel Handling Building Charcoal Exhaust & Air Supply Distribution (1 page(s), 4/30/2021)
- ML21209A345 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-12, Revision 8, Building Service System Flow Diagram Turbine Building Ventilation System (1 page(s), 4/30/2021)
- ML21209A358 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-15, Building Service System Flow Diagram, Intermediate Building ESF SWGR Rooms and Speed Switch Rooms Cooling System Design Engineering, Revision 12 (1 page(s), 4/30/2021)
- ML21209A297 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-17, Revision 17, Intermediate Building General Ventilation and Pump Area Cooling System (1 page(s), 4/30/2021)
- ML21209A433 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-18, Rev 20, Piping System Flow Diagram Boron Recycle (1 page(s), 4/30/2021)
- ML21209A291 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-19, Revision 17, Building Service System Flow Diagram Service Water Intake Screen and Pump House Building Ventilation System (1 page(s), 4/30/2021)
- ML21209A287 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-20, Revision 22, Piping System Flow Diagram Normal and Post-Accident Sampling (1 page(s), 4/30/2021)
- ML21209A332 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-3A, Revision 13, Piping System Flow Diagram Instrument Air Backup (1 page(s), 4/30/2021)
- ML21209A343 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-5, Building Service Flow & Equipment Drains, Station Drainage Flow Diagram, Reactor Building, Design Engineering, Revision 8 (1 page(s), 4/30/2021)
- ML21209A326 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-7, Revision 13, Building Service Floor and Equipment Drains Station Drainage Flow Diagram - Auxiliary Building (1 page(s), 4/30/2021)
- ML21209A351 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.3-9, Revision 10, Building Service Floor and Equipment Station Drainage Flow Diagram Control Building (1 page(s), 4/30/2021)
- ML21209A256 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-10, Revision 21, Building System System Flow Diagram Auxiliary Building Pump Room Cooling System (1 page(s), 4/30/2021)
- ML21209A235 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-12, Revision 8, Building Service System Flow Diagram Turbine Building Ventilation System. (1 page(s), 4/30/2021)
- ML21209A255 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-14, Revision 12, Building Service System Flow Diagram CRDM Switch Gear Room Cooling System And Water Chiller Area Ventilation System. (1 page(s), 4/30/2021)
- ML21209A380 - Virgil C. Summer, Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-16, D-912-138, Revision15, Building Service System Flow Diagram Battery Rm. & Charging Rm., BOP Charger Area Ventilation System Design Engineering. (4/30/2021)
- ML21209A270 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-18, Building Service System Flow Diagram Diesel Generator Areas Vent System. (1 page(s), 4/30/2021)
- ML21209A427 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-20, Revision 19, Building Service System Flow Diagram Service Building First Floor And Second Floor (1 page(s), 4/30/2021)
- ML21209A302 - Virgil C. Summer, Unit 1, Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-21, Revision 11, Building Service System Flow Diagram Service Building Second Floor Design Engineering. (4/30/2021)
- ML21209A288 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-22, D-302-841, Revision 36, Piping System Flow Diagram Chilled Water Pump & Chiller Area. (1 page(s), 4/30/2021)
- ML21209A444 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-22, Revision 31, Piping System Flow Diagram Chilled Wafer Pump & Chiller Area. (1 page(s), 4/30/2021)
- ML21209A274 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-23, Revision 19, Piping System Flow Diagram Chilled Water - To Cooling Coils (1 page(s), 4/30/2021)
- ML21209A477 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-24, Piping System Flow Diagram Chilled Water - to Cooling Coils (1 page(s), 4/30/2021)
- ML21209A440 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-25, Sheet 1, Revision 39, Piping System Flow Diagram Industrial Cooling Water. (1 page(s), 4/30/2021)
- ML21209A278 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9 Figure 9.4-25, Revision 4, Sheet 2, Piping System Flow Diagram Industrial Cooling Water. (1 page(s), 4/30/2021)
- ML21209A217 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-25, Revision 35, Piping System Flow Diagram Industrial Cooling Water (1 page(s), 4/30/2021)
- ML21209A312 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-26, Building Service HVAC, Substation Relay House Floor El. 436'-0" Revision 6 (1 page(s), 4/30/2021)
- ML21209A264 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-26C, Building Service System Flow Diagram, Water Treating Building Heating and Air Cooling System Design Engineering, Revision 7 (1 page(s), 4/30/2021)
- ML21209A219 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-26d, Revision 0, Building Service System Flow Diagram Unit 1 Relay House. (1 page(s), 4/30/2021)
- ML21209A257 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-29, Building Service System Flow Diagram R.B Charcoal Clean-Up, Secondary Comp. Cooling & Reactor Compt. Cooling. (1 page(s), 4/30/2021)
- ML21209A467 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-3, Revision 21, Building Serice System Flow Diagram controlled Access Supply Cooling System. (1 page(s), 4/30/2021)
- ML21209A464 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-31, Revision 15 - 2018-02 - NRC 18, Building Service System Flow Diagram R.B C.R.D.M. SHROUD Vent System. (1 page(s), 4/30/2021)
- ML21209A362 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-32, D-302-852, Revision 24, Piping System Flow Diagram CRDM Cooling Water. (1 page(s), 4/30/2021)
- ML21209A469 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-32, Revision 22 - NRC16, Piping System Flow Diagram CRDM Cooling Water. (1 page(s), 4/30/2021)
- ML21209A355 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-33, Building Service System Flow Diagram Technical Support Center and Main Control Board Ventilation System. (1 page(s), 4/30/2021)
- ML21209A321 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-35, Sheet 2, Building Service System Flow Diagram EB HVAC DGI Room. (1 page(s), 4/30/2021)
- ML21209A294 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-35, Sheet 1, Building Service System Flow Diagram EB HVAC - Electrical And Battery Room. (1 page(s), 4/30/2021)
- ML21209A405 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-4, Building Service System Flow Diagram Control Building Control Access Exhaust. (1 page(s), 4/30/2021)
- ML21209A238 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-5, Building Service System Flow Diagram Computer Rooms & SAS Room Cooling (1 page(s), 4/30/2021)
- ML21209A276 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-6, Building Service - System Flow Diagram Aux. Building Main Supply Sys. Flow Diagram. (1 page(s), 4/30/2021)
- ML21209A271 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-7, Building Service System Flow Diagram Aux BLDG HEPA EXH System Flow Diagram. (1 page(s), 4/30/2021)
- ML21209A333 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-8, Building Service System Flow Diagram Auxiliary Building Charcoal Exhaust System Flow Diagram. (1 page(s), 4/30/2021)
- ML21209A340 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-9, Building Service - System Flow Diagram Aux BLDG - Main Exhaust System. (1 page(s), 4/30/2021)
- ML21209A364 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-36, Building Service System Flow Diagram AEB DG2 Room HVAC (1 page(s), 4/30/2021)
- ML21209A396 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.5-1, Sheet 2 - Redacted (1 page(s), 4/30/2021)
- ML21209A246 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.5-1, Sheet 3, Revision 11 - RN 12-014 - KN-NRC - Redacted (1 page(s), 4/30/2021)
- ML21209A381 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.5-1, Sheet 1, D-302-231, R40 - Redacted (1 page(s), 4/30/2021)
- ML21209A304 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.5-1, Sheet 5, Revision 9-2018-04-NRC 18: Redacted (1 page(s), 4/30/2021)
- ML21209A450 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.5-11-R16 - Redacted (1 page(s), 4/30/2021)
- ML21209A430 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.5-1A - Redacted. (1 page(s), 4/30/2021)
- ML21209A472 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.5-1B - Redacted (1 page(s), 4/30/2021)
- ML21209A363 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.5-1C - Redacted (1 page(s), 4/30/2021)
- ML21209A353 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.5-1D - Redacted (1 page(s), 4/30/2021)
- ML21209A230 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.5-1E - Redacted (1 page(s), 4/30/2021)
- ML21209A209 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.5-1f-R55-2015-04 - Redacted (1 page(s), 4/30/2021)
- ML21209A251 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.5-2 - Redacted (1 page(s), 4/30/2021)
- ML21209A341 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.5-7 - 2018-08 - Redacted (1 page(s), 4/30/2021)
- ML21209A234 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 12, Figure 12A.4-1 through 12A.4-8 - Redacted (8 page(s), 4/30/2021)
- ML21209A250 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 9, Figures 9.5-1 through 9.5.11 - Redacted (24 page(s), 4/30/2021)
- ML21209A460 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Drawing E-726-232, Revision 2, Condenser Circ. Water Intake Structure Retaining Walls Bottom Slab Reinforcement Plans Retaining Walls 1 and 2 (1) (1 page(s), 4/30/2021)
- ML21209A286 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Drawing No. E-726-232, Revision 2, Condenser Circ. Water Intake STR. Retaining Walls Bottom Slab Reinforcement Plans-Retaining Walls. (1 page(s), 4/30/2021)
- ML21209A132 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.5-109, Service Water Pond Embankments. Canal & Jetty Plan - West Embankment. (1 page(s), 4/30/2021)
- ML21209A186 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.5-108, Service Water Pond Embarkments, Canal & Safety Plan - East Dam. (1 page(s), 4/30/2021)
- ML21209A127 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.7-51, I & C Detail SIM Gen XSG-2C-RC Upper Lateral Support Earthquake Instrument YM-1785 (1 page(s), 4/30/2021)
- ML21209A119 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.7-52, I & C Detail Intermediate Building Earthquake Instr. YM-1789. (1 page(s), 4/30/2021)
- ML21209A147 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.7-53, I & C Detail Auxiliary Building Earthquake Instr. YM-1787 (1 page(s), 4/30/2021)
- ML21209A179 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 6, Figure 6.2-51, Building Service HVAC Reactor Building Cooling System Sections. (1 page(s), 4/30/2021)
- ML21209A116 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 6, Figure 6.2-58, Piping System Flow Diagram Post Accident Hydrogen Removal And Alternate Purge System. (1 page(s), 4/30/2021)
- ML21209A174 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 6, Figure 6.2-59, Reactor Building Leak Rate Testing System. (1 page(s), 4/30/2021)
- ML21209A111 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 6, Figure 6.2-60, Instrument Location Layout Integrated Leak Rate Test Sensor Locations. (1 page(s), 4/30/2021)
- ML21209A188 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 6, Figure 6.2-65, Reactor Building Pipe Sleeves & Liner Plate Sectional Plans. (1 page(s), 4/30/2021)
- ML21209A140 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 6, Figure 6.2-66, Reactor Building Pipe Sleeves Sections and Details. (1 page(s), 4/30/2021)
- ML21209A118 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 6, Figure 6.2-67, Reactor Building Pipe Sleeves Sections and Details. (1 page(s), 4/30/2021)
- ML21209A121 - Virgil C. Summer Unit 1 - Revision 21 to Updated Final Safety Analysis Report, Chapter 6, Figure 6.2-69, Reactor Coolant Main Loop. (1 page(s), 4/30/2021)