Site Map: Nuclear Reactors
This page shows how the U.S. Nuclear Regulatory Commission (NRC) has organized the reactor-related information available through our public Web site. These links will take you directly to the indicated pages on our site.
- Power Reactors
- Operator Licensing
- Non-Power Facilities
- Event at the National Institute of Standards and Technology (NIST) Center for Neutron Research
- New Facility Licensing
- Program Management
- Final Safety Analysis Report Update Tracking for Non-Power Production and Utilization Facility Order
- Inspection Reports for Research and Test Reactors
- Operating Reactors
- Map of Power Reactor Sites
- Map of Research and Test Reactor Sites
- Regulations, Guidance, and Communications
- Operating Reactor Licensing
- Technical Specifications
- License Transfers & Mergers
- Power Uprates
- Background on Power Uprates
- Types of Power Uprates
- Regulatory Process for Submitting/Reviewing Requests
- Regulations and Guidance
- Status of Power Uprate Applications
- Past Requests for Additional Information Concerning Power Uprates
- Measurement Uncertainty Recapture Uprates for Boiling Water Reactors
- Measurement Uncertainty Recapture Uprates for Pressurized Water Reactors
- Beaver Valley Power Station, Unit No. 1 and No. 2
- Calvert Cliffs Power Plant, Unit No. 1 and No. 2
- Comanche Peak 1 and 2
- Crystal River Unit 3
- Davis-Besse Nuclear Power Station
- Donald C. Cook Nuclear Plant Unit 1
- Donald C. Cook Nuclear Plant Unit 2
- H. B. Robinson Steam Electric Plant, Unit No. 2
- Indian Point Nuclear Generating Unit No. 2
- Indian Point Nuclear Generating Unit No. 3
- Kewaunee Nuclear Power Plant
- North Anna 1 and 2
- Palisades Nuclear Plant
- Point Beach Nuclear Plant, Units 1 And 2
- Prairie Island 1 and 2
- Salem Generating Station, Unit Nos. 1 and 2
- San Onofre Nuclear Generating Station, Units 2 and 3
- Seabrook Station
- Sequoyah Nuclear Plant, Units 1 and 2
- South Texas Project Units 1 and 2
- Surry 1 and 2
- Vogtle 1 and 2
- Waterford 3
- Watts Bar Nuclear Plant, Unit 1
- Stretch Uprates for Pressurized Water Reactors
- Braidwood 1 and 2 / Byron 1 and 2 (Combined Application)
- Callaway Plant Unit No. 1
- Comanche Peak Steam Electric Station Units 1 and 2
- Crystal River Unit 3
- Diablo Canyon Unit 1
- H. B. Robinson Unit 2
- Indian Point Nuclear Generating Unit No. 2
- Indian Point Nuclear Generating Unit No. 3
- Joseph M. Farley Nuclear Plant, Units 1 and 2
- Kewaunee Nuclear Power Plant
- Millstone Power Station, Unit 3
- Palo Verde Nuclear Generating Station Unit 2
- Palo Verde Nuclear Generating Station Units 1 and 3 (Combined Application)
- Palo Verde Nuclear Generating Station, Unit Nos. 1, 2, and 3
- Seabrook Station
- Shearon Harris Nuclear Power Plant
- St. Lucie Plant, Unit No. 1
- St. Lucie Plant, Unit No. 2
- Surry Power Station, Unit Nos. 1 and 2
- Turkey Point Nuclear Generating Unit Nos. 3 and 4
- Virgil C. Summer Nuclear Station, Unit No. 1
- Vogtle Electric Generating Plant, Units 1 and 2
- Wolf Creek Generating Station, Unit 1
- Stretch Uprates for Boiling Water Reactors
- Browns Ferry Nuclear Plant, Unit 1
- Browns Ferry Nuclear Plant, Units 2 and 3
- Brunswick Steam Electric Plant, Units 1 and 2
- Columbia Generating Station
- Duane Arnold Energy Center
- Edwin I. Hatch Nuclear Plant, Units 1 and 2
- Fermi-2
- James A. FitzPatrick Nuclear Power Plant
- LaSalle County Station, Units 1 and 2
- Limerick Generating Station, Units 1 and 2
- Nine Mile Point Nuclear Station, Unit 2
- Peach Bottom Atomic Power Station, Unit Nos. 2 and 3
- Perry Nuclear Power Plant, Unit 1
- River Bend Station, Unit 1
- Susquehanna Steam Electric Station, Unit 1
- Susquehanna Steam Electric Station, Unit 2
- Extended Uprates for Boiling Water Reactors
- Browns Ferry, Units 1, 2, and 3
- Brunswick Steam Electric Plant, Unit Nos. 1 and 2
- Clinton Power Station, Unit 1
- Dresden Nuclear Power Station, Units 2 and 3
- Duane Arnold Energy Center
- Edwin I. Hatch Nuclear Plant, Units 1 and 2
- Grand Gulf Nuclear Station, Unit 1
- Hope Creek Generating Station Facility
- Monticello Nuclear Generating Plant (1998 EPU)
- Monticello Nuclear Generating Plant (2013 EPU)
- Peach Bottom Atomic Power Station, Units 2 and 3
- Quad Cities Nuclear Power Station, Units 1 and 2
- Susquehanna 1 and 2
- Vermont Yankee Nuclear Power Station
- Extended Uprates for Pressurized Water Reactors
- Public Involvement
- Public Meetings
- Contact Us
- Power Uprate Review Readiness
- Reactor License Renewal
- Roadmap
- Overview
- Process
- Regulations
- Guidance
- Public Involvement
- Commission Papers
- Status of Initial License Renewal Applications and Industry Initiatives
- Arkansas Nuclear One, Unit 1
- Arkansas Nuclear One, Unit 2
- Beaver Valley Power Station
- Browns Ferry Nuclear Plant (Initial Renewal)
- Browns Ferry Nuclear Plant (Subsequent Renewal)
- Brunswick Steam Electric Plant
- Calvert Cliffs
- Catawba
- Clinton Power Station, Unit 1
- Columbia
- Comanche Peak
- D.C. Cook
- Cooper
- Crystal River
- Davis-Besse
- Diablo Canyon
- Dresden (Initial Renewal)
- Dresden (Subsequent Renewal)
- Duane Arnold
- Joseph M. Farley
- James A. FitzPatrick
- Fort Calhoun
- R.E. Ginna
- Shearon Harris
- Edwin I. Hatch (Initial Renewal)
- Edwin I. Hatch (Subsequent Renewal)
- Hope Creek
- Indian Point
- Kewaunee
- McGuire
- Millstone
- Monticello (Initial Renewal)
- Monticello (Subsequent Renewal)
- Nine Mile Point
- North Anna (Initial Renewal)
- North Anna (Subsequent Renewal)
- Oconee (Initial Renewal)
- Oconee (Subsequent Renewal)
- Oyster Creek
- Palisades
- Palo Verde
- Peach Bottom (Initial Renewal)
- Perry
- Pilgrim
- Point Beach (Initial Renewal)
- Point Beach (Subsequent Renewal)
- Prairie Island
- Quad Cities
- Robinson (Initial Renewal)
- Robinson (Subsequent Renewal)
- Salem
- Seabrook
- South Texas Project
- St. Lucie (Initial Renewal)
- St. Lucie (Subsequent Renewal)
- V.C. Summer (Initial Review)
- V.C. Summer (Subsequent Renewal)
- Surry (Initial Renewal)
- Susquehanna
- Three Mile Island
- Turkey Point (Initial Renewal)
- Vermont Yankee
- Vogtle
- Wolf Creek
- License Renewal Generic Environmental Review
- Introduction
- Light Water Reactor Sustainability Program
- Cost Estimator for Operating Reactor Licensing
- Reactor Oversight Process (ROP)
- Reactor Safety Information Topics
- Access Authorization Programs
- Baffle-Former Bolts
- Concrete Degradation at Seabrook Nuclear Power Plant
- Davis-Besse Reactor Vessel Head Degradation
- Completion Of Requirements Of 2004 Confirmatory Order Modifying License (EA-03-214)
- Davis-Besse Lessons Learned Task Force
- Undercut Area Toward Nozzle Eleven
- News and Correspondence
- Petition Related Documents
- Public Meetings for Reactor Vessel Head Degradation
- Transporting New Head to Davis Besse
- Undervessel Pre-Cleaning - View 3
- Undervessel Pre-Cleaning - View 2
- Undervessel Pre-Cleaning Center Incore Nozzle - View 1
- Overview of the Davis Besse Reactor Head Inspection Area
- Nozzle Eleven Perspective
- Looking Up at the Davis Besse Reactor Head Inspection Area
- Looking Toward Nozzle Eleven
- Looking Down (second angle) at the Davis Besse Reactor Head Inspection Area
- Looking Down at the Davis Besse Reactor Head Inspection Area
- Looking Back Toward Nozzle Three
- Underneath the Davis Besse Reactor Head
- Davis Besse Reactor Vessel Head Insulation Top View with Nozzle #3 Removed (Overhead View)
- Davis Besse Reactor Vessel Insulation Head Top View with Nozzle #3 Removed (Overhead View)
- Davis Besse Control Rod Drive Open Access Hatch View
- Containment Access Location
- Close Up View of Cavity Looking Toward Nozzle Eleven
- Cavity Looking Toward Nozzle Eleven
- Downward View of Reactor Vessel Head Cutout Hole - View 3
- Downward View of Reactor Vessel Head Cutout Hole - View 1
- 17 Inch Cutout - View 2
- 17 Inch Cutout - View 1
- Underneath View of Cutout - Closeup View
- Underneath View of Cutout
- Davis-Besse Correspondence Related to NRC Bulletin 2002-01
- Davis-Besse Correspondence Related to NRC Order EA-03-009
- References
- Downward View of Reactor Vessel Head Cutout Hole - View 2
- Fire Protection Program
- Fitness-for-Duty Programs
- Human Factors
- Open Phase Conditions in Electric Power Systems
- Operating Reactor Maintenance Effectiveness
- Point Beach 2003-2006 - Multiple/Repetitive Degraded Cornerstone Column
- PWR Sump Performance
- Reactor Pressure Boundary Integrity Issues for Pressurized Water Reactors
- Reactor Vessel Integrity
- Safety Enhancements After Fukushima
- Operating Reactor Scram Trending
- Process for the Ongoing Assessment of Natural Hazard Information (POANHI)
- List of Power Reactor Units
- NRC Contacts for Power and Research & Test Reactors
- New Reactors
- Advanced Reactors
- How We're Executing
- Who We're Working With
- Pre-Application Activities
- General Atomics
- Fast Modular Reactor
- Radiant Kaleidos
- Terra Innovatum SOLO
- University of Illinois at Urbana-Champaign
- X-Energy LLC
- XENITH
- Hadron Energy, Inc.
- REPLOY Power, Inc.
- Rolls-Royce SMR Limited
- Abilene Christian University
- Kairos Power LLC
- Natura Resources
- TerraPower, LLC
- Terrestrial Energy USA Inc.
- ARC-100
- Oklo Aurora Powerhouse
- Natrium
- Aalo Atomics – Idaho Nuclear Project
- APCo Joshua Falls
- Duke Energy Belews Creek, NC
- Shepherd Power
- Texas A&M University System
- eVinci
- International Cooperation
- Pre-Application Activities
- New Applicants
- Modernizing How We Regulate
- Policy Development
- Rulemaking
- Guidance
- Advanced Reactor Application Guidance
- Risk-Informed and Performance-Based Guidance for Non-LWR Licensing Basis Development
- Advanced Reactor Content of Application Project
- Endorsement Review of ASME B&PV Code Section III, Division 5, "High Temperature Reactors"
- Endorsement of ASME/ANS RA-S-1.4 Probabilistic Risk Assessment Standard for Advanced Non-Light Water
- Digital I&C
- TIRICE and TIMaSC
- Microreactors
- Get Involved
- References and Training
- Large Light Water Reactors
- Design Certification Applications for New Reactors
- Early Site Permit Applications for New Reactors
- Combined License Applications for New Reactors
- Locations of New Nuclear Power Reactor Applications
- Bell Bend
- Public Meetings for Bell Bend Nuclear Power Plant Application
- Combined License Application Documents for Bell Bend Nuclear Power Plant Application
- Requests for Additional Information Regarding the Combined License Application for Bell Bend Nuclear
- Application Review Schedule for the Combined License Application for Bell Bend Nuclear Power Plant
- Bellefonte, Units 3 & 4
- Public Meetings for Bellefonte Nuclear Station, Units 3 and 4 Application
- Combined License Application Documents for Bellefonte Nuclear Station, Units 3 and 4
- Requests for Additional Information Regarding the Combined License Application for Bellefonte Nuclea
- Application Review Schedule for the Combined License Application for Bellefonte Nuclear Station, Uni
- Callaway, Unit 2
- Public Meetings for Callaway, Unit 2 Application
- Combined License Application Documents for Callaway, Unit 2 Application
- Requests for Additional Information Regarding the Combined License Application for Callaway, Unit 2
- Application Review Schedule for the Combined License Application for Callaway, Unit 2
- Calvert Cliffs, Unit 3
- Public Meetings for Calvert Cliffs, Unit 3 Application
- Combined License Application Documents for Calvert Cliffs, Unit 3 Application
- Requests for Additional Information Regarding the Combined License Application for Calvert Cliffs, U
- Application Review Schedule for the Combined License Application for Calvert Cliffs, Unit 3
- Comanche Peak Units, 3 & 4
- Public Meetings for Comanche Peak Nuclear Power Plant, Units 3 and 4 Application
- Combined License Application Documents for Comanche Peak Nuclear Power Plant, Units 3 and 4 Applicat
- Requests for Additional Information Regarding the Combined License Application for Comanche Peak Nuc
- Application Review Schedule for the Combined License Application for Comanche Peak Nuclear Power Pla
- Fermi, Unit 3
- Grand Gulf, Unit 3
- Public Meetings for Grand Gulf, Unit 3 Application
- Combined License Application Documents for Grand Gulf, Unit 3 Application
- Requests for Additional Information Regarding the Combined License Application for Grand Gulf, Unit
- Application Review Schedule for the Combined License Application for Grand Gulf, Unit 3
- Levy County, Units 1 and 2
- Public Meetings for Levy County, Units 1 and 2 Application
- Combined License Application Documents for Levy Nuclear Plant, Units 1 and 2
- Requests for Additional Information Regarding the Combined License Application for Levy County, Unit
- Application Review Schedule for the Combined License Application for Levy County, Units 1 and 2
- Nine Mile Point, Unit 3
- North Anna, Unit 3
- Public Meetings for North Anna, Unit 3 Application
- Combined License Application Documents for North Anna, Unit 3 Application
- Requests for Additional Information Regarding the Combined License Application for North Anna, Unit
- Application Review Schedule for the Combined License Application for North Anna, Unit 3
- River Bend Station, Unit 3
- Public Meetings for River Bend Station, Unit 3 Application
- Combined License Application Documents for River Bend Station, Unit 3 Application
- Requests for Additional Information Regarding the Combined License Application for River Bend Statio
- Application Review Schedule for the Combined License Application for River Bend Station, Unit 3
- Shearon Harris, Units 2 & 3
- Public Meetings for Shearon Harris Nuclear Site, Units 2 and 3 Application
- Combined License Application Documents for Shearon Harris Nuclear Site, Units 2 and 3 Application
- Requests for Additional Information Regarding the Combined License Application for Shearon Harris Nu
- Application Review Schedule for the Combined License Application for Shearon Harris Nuclear Site, Un
- South Texas Project, Units 3 & 4
- Public Meetings for South Texas Project, Units 3 and 4 Application
- Combined License Application Documents for South Texas Project, Units 3 and 4 Application
- Requests for Additional Information Regarding the Combined License Application for South Texas Proje
- Application Review Schedule for the Combined License Application for South Texas Project, Units 3 an
- Turkey Point, Units 6 & 7
- Public Meetings for Turkey Point, Units 6 and 7 Application
- Combined License Application Documents for Turkey Point, Units 6 and 7 Application
- Requests for Additional Information Regarding the Combined License Application for Turkey Point, Uni
- Application Review Schedule for the Combined License Application for Turkey Point, Units 6 and 7
- Victoria County Station, Units 1 & 2
- Virgil C. Summer, Units 2 & 3
- Vogtle, Units 3 & 4
- William States Lee III, Units 1 & 2
- Fermi America President Donald J. Trump Advanced Energy and Intelligence Campus, Units 1-4
- How We Regulate
- Regulations, Guidance, and Communications
- Regulatory Oversight
- Construction Inspection Program for New Reactors
- Construction Reactor Oversight Process (cROP)
- Construction Action Matrix Deviations
- List of Construction Inspection Reports
- cROP Historical Performance from Previous Quarters
- Frequently Asked Questions About the Construction Assessment Program
- Frequently Asked Questions About the Reactor Construction Inspection Program
- Construction Assessment Reports/Inspection Plans
- 2023Q2 Construction Action Matrix Summary and Current Regulatory Oversight
- cROP 2019Q2 Cross Cutting Issues Summary
- Detailed cROP Description
- Quality Assurance for New Reactors
- Regulations, Standard Review Plan, SECY Paper, and NUREG-1055
- Safety Evaluation Reports Concerning the Revised Basis for QA Programs
- QA Inspections for New Reactor Licensing
- Vendor QA Inspections
- Nuclear Procurement Issues Corporation (NUPIC) and Industry Interactions
- Town Hall Meetings on Vendor Oversight
- Workshops on Vendor Oversight
- Guidance on Implementation of 10 CFR Part 21 Requirements
- Radiation Protection for New Reactors
- Aircraft Impact Assessment (AIA) Inspections
- Advanced Reactors
Page Last Reviewed/Updated Friday, August 15, 2025
Page Last Reviewed/Updated Friday, August 15, 2025