Skip to main content

The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.

Advanced Safety Evaluations

Advanced Safety Evaluations for Levy County, Units 1 and 2 Application

The following table provides access to Advanced Safety Evaluations that the NRC has issued in connection with its review of the COL application that PEF submitted for Levy County, Units 1 & 2.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

ChapterDescriptionDate
1Introduction and Interfaces09/15/11
2Site Characteristics (All sections except 2.4, "Hydrologic Engineering")09/01/11
Site Characteristics - 2.4 Hydrologic Engineering09/12/11
Chapter 2 Figures, Part 1 of 310/11/11
Chapter 2 Figures, Part 2 of 310/11/11
Chapter 2 Figures, Part 3 of 310/11/11
Chapter 2 Tables10/11/11
3Design of Structures, Components, Equipment, and Systems09/01/11
4Reactor03/29/11
5Reactor Coolant System and Connected Systems03/29/11
6Engineered Safety Features03/30/11
6.3 Passive Core Cooling System09/11/14
7Instrumentation and Controls06/08/11
8Electric Power06/30/11
8 (Revised)Electric Power05/16/14
9Auxiliary Systems06/30/11
10Steam and Power Conversion03/29/11
11Radioactive Waste Management08/10/11
12Radiation Protection06/08/11
13Conduct of Operations08/09/11
13 (Revised)Conduct of Operations06/30/14
14Initial Test Program07/29/11
15Accident Analysis06/08/11
16Technical Specifications06/08/11
17Quality Assurance06/08/11
18Human Factors Engineering03/29/11
19Probabilistic Risk Assessment (PRA) (All sections except Appendix 19A, "Loss of Large Areas of the Plant due to Explosions or Fires (LOLA)")07/29/11
Appendix 19A - Loss of Large Areas of the Plant Due to Explosions or Fires (LOLA)07/29/11
20Requirements Resulting from Near-Term Task Force Recommendations12/13/12
Section 20.3. Reliable Spent Fuel Pool Instrumentation (Based on Recommendation 7.1)10/03/13

Page Last Reviewed/Updated Thursday, September 03, 2026

Page Last Reviewed/Updated Thursday, September 03, 2026