Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Bulletin 2002-02 Plant Specific Information

Plant-specific correspondence, meetings, and responses to bulletin 2002-02 concerning inspection programs are listed below by region.

Region IIRegion IRegion IIIRegion IV

Region I Region IIRegion IIIRegion IV

Completion of Plant-Specific Licensing Activities Associated with Bulletin 2002-02, Reactor Pressure Vessel Head Penetration Nozzle Inspection Programs Memorandum dated March 19, 2003.

 

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

 

Region 1

Plant Name

Bulletin Response

Meetings

Other Correspondence

15
Day

30
Day

30 Day Outage

Beaver Valley 1

 

PDF Icon

   

Beaver Valley 2

 

PDF Icon 

   

Calvert Cliffs 1

PDF Icon

PDF Icon

   

Calvert Cliffs 2

PDF Icon

PDF Icon

   

Ginna

 

PDF Icon

   

Indian Point 2

 

PDF Icon

PDF Icon

 

11/13/02 Ackn Ltr

Indian Point 3

PDF Icon

   

12/19/02 Inspection Plan

Millstone 2

PDF Icon

PDF Icon

   

Millstone 3

 

PDF Icon

PDF Icon 

 

10/30/02 Ackn Ltr

Salem 1

 

PDF Icon

PDF Icon

 

12/02/02 Ackn Ltr

Salem 2

 

PDF Icon

  

12/02/02 Ackn Ltr

Seabrook 1

 

PDF Icon

  

12/02/02 Ackn Ltr
12/20/02 Revised 30-Day Resp

Three Mile Island 1

 

PDF Icon

   

(To top of page)

Region 2

Plant Name

Bulletin Response

Meetings

Other Correspondence

15
Day

30
Day

30 Day Outage

Catawba 1

 

PDF Icon

  

11/22/02 Ackn Ltr
06/19/03 Inspection Plans

Catawba 2

 

PDF Icon

  

11/08/02 Ackn Ltr
06/19/03 Inspection Plans

Crystal River 3

PDF Icon

   

The facility was permanently shut down on February 20, 2013

Farley 1

PDF Icon

   

11/04/02 - 30 Day Supp.

Farley 2

 

PDF Icon

PDF Icon

 

10/04/02 Supp. Response
11/04/02 30 Day Supp.
12/23/02 Ackn Ltr

McGuire 1

 

PDF Icon

PDF Icon

 

11/08/02 Ackn Ltr
06/19/03 Inspection Plans

McGuire 2

 

PDF Icon

  

11/08/02 Ackn Ltr
06/19/03 Inspection Plans

North Anna 1

 

PDF Icon

PDF Icon

 

10/11/02 RAI Ltr
12/20/02 RAI Response
01/03/03 Ackn Ltr
01/23/03 RAI Response

North Anna 2

 

PDF Icon 

PDF Icon

 

11/21/02 Head Replacement Ltr
12/20/02 RAI Response
01/03/03 Ackn Ltr
01/23/03 RAI Response
02/27/03 Root Cause Eval and
Revised Insp Results
03-09-03 Head Replacement Spec Insp

Oconee 1

 

PDF Icon

  

09/25/03 Supplemental Info

Oconee 2

 

PDF Icon 

PDF Icon

 

12/16/02 RAI Response
09/25/03 Supplemental Info

Oconee 3

 

PDF Icon

  

09/25/03 Supplemental Info

Robinson 2

 

PDF Icon

PDF Icon 

 

01/08/04 Head Inspections Planned

Sequoyah 1

 

PDF Icon

  

12/16/02 Ackn Ltr

Sequoyah 2

 

PDF Icon

  

12/16/02 Ackn Ltr

Shearon Harris 1

 

PDF Icon

   

St. Lucie 1

 

PDF Icon

PDF Icon

10/10/02-10/14/02 Telecon Summary
Telecon Slides

 

St. Lucie 2

 

PDF Icon

PDF Icon

 

04/08/05 Ackn Ltr

Summer

 

PDF Icon

   

Surry 1

 

PDF Icon 

  

01/03/03 Ackn Ltr
01/23/03 RAI Response

Surry 2

 

PDF Icon

  

01/03/03 Ackn Ltr
01/23/03 RAI Response

Turkey Point 3

 

PDF Icon

   

Turkey Point 4

 

PDF Icon

   

Vogtle 1

 

PDF Icon

  

10/02/02 Errata
11/14/02 Ackn Ltr

Vogtle 2

 

PDF Icon

  

10/02/02 Errata
11/13/02 Ackn Ltr

Watts Bar 1

 

PDF Icon

  

12/20/02 Ackn Ltr

(To top of page)

Region 3

Plant Name

Bulletin Response

Meetings

Other Correspondence

15
Day

30
Day

30 Day Outage

Braidwood 1

 

PDF Icon

  

12/02/02 Ackn Ltr

Braidwood 2

 

PDF Icon

  

12/02/02 Ackn Ltr

Byron 1

 

PDF Icon

  

11/05/02 Ackn Ltr

Byron 2

 

PDF Icon

PDF Icon 

 

11/05/02 Ackn Ltr

Davis Besse

 

PDF Icon

   

DC Cook 1

 

PDF Icon

   

DC Cook 2

 

PDF Icon

   

Kewaunee

PDF Icon

   

Power Station was permanently shut down on May 7, 2013

Palisades

PDF Icon

    

Point Beach 1

 

PDF Icon

PDF Icon

 

10/04/02 RAI Response
04/10/03 RAI Response
Calc 32-5019398-01 Weld Anomaly
Calc 32-5019396-01 J-Groove Weld
Calc 32-5020244-01 Temperbead Bore Weld

Point Beach 2

 

PDF Icon

  

10/04/02 RAI Response
04/10/03 RAI Response
Calc 32-5019398-01 Weld Anomaly
Calc 32-5019396-01 J-Groove Weld
Calc 32-5020244-01 Temperbead Bore Weld

 

Prairie Island 1

PDF Icon

 

PDF Icon

 

08/05/03 Supp Response

Prairie Island 2

PDF Icon

   

08/05/03 Supp Response

(To top of page)

Region 4

Plant Name

Bulletin Response

Meetings

Other Correspondence

15
Day

30
Day

30 Day Outage

Arkansas Nuclear 1   

 

PDF Icon

PDF Icon 

10/16/02 Notice
10/16/02 Slides
10/08/02-11/06/02 - Telecon Summary

10/31/02 - 30 Day Supp.
12/24/02 Ackn Ltr
Draft RAI Resp- BL2002-01

Arkansas Nuclear 2

PDF Icon

    

Callaway

 

PDF Icon

PDF Icon

 

11/13/02 Ackn Ltr

Comanche Peak 1

 

PDF Icon

PDF Icon 

 

12/02/02 Ackn Ltr

Comanche Peak 2

 

PDF Icon

  

12/02/02 Ackn Ltr

Diablo Canyon 1

 

PDF Icon

  

04/23/04 Ackn Ltr

Diablo Canyon 2

 

PDF Icon

  

04/23/04 Ackn Ltr

Fort Calhoun

 

PDF Icon

  

02/17/03 Revised 30-Day Resp

PDF Icon

Palo Verde 1

 

PDF Icon 

PDF Icon

  

Palo Verde 2

 

PDF Icon

   

Palo Verde 3

 

PDF Icon

   

San Onofre 2

 

PDF Icon

PDF Icon

 

12/31/02 Revised 30-Day Resp
Station was permanently shut down on June 12, 2013

San Onofre 3

 

PDF Icon

PDF Icon

 

12/3/docs/ML0300/ML030030484.pdf1/02 Revised 30-Day Resp
02/14/02 Inspection Status
Station was permanently shut down on June 12, 2013

South Texas 1

 

PDF Icon

  

12/26/02 Ackn Ltr

South Texas 2

 

PDF Icon

PDF Icon 

 

12/26/02 Ackn Ltr

Waterford 3

PDF Icon

    

Wolf Creek 1

 

PDF Icon

  

12/04/02 Ackn Ltr

Ackn - Acknowledgment Letter
Supp - Supplemental
Resp - Response

(To top of page)