Issued Combined Licenses for Turkey Point, Units 6 and 7 Application

On June 30, 2009, Florida Power & Light Company (FPL) submitted its application for combined licenses (COLs) for two Westinghouse Advanced Passive 1000 (AP1000) Pressurized Water Reactors (PWRs) designated as Turkey Point, Units 6 and 7.

For detail (including the latest submittal of the application, the related review schedule, and the associated staff documentation), see the following topics on this page:

Reference Documents

In accordance with Title 10, Part 52, of the Code of Federal Regulations (10 CFR Part 52), "Licenses, Certifications, and Approvals for Nuclear Power Plants," a COL application may reference a standard design certification, an early site permit, both, or neither. Many COL applications have referenced an application for design certification, in accordance with 10 CFR 52.55(c). On that basis, FPL referenced Westinghouse's application to amend the AP1000 standard design certification and cited the following amended design control document (DCD) in its COL original application for Turkey Point, Units 6 & 7:

To top of page

Application Information

The following table provides access to the COL Application that FPL submitted for Turkey Point, Units 6 & 7.

Some combined license applications were submitted with hyperlinks to various reference documents. Currently, the hyperlinks in those applications are not active. These hyperlinks represent an advanced feature that could be activated when the agency upgrades to web-based ADAMS, at which point these applications and documents such as the Final Safety Analysis Report and associated Technical/Topical Reports would be linked together. In the interim, and for those applications that do not have the hyperlink feature, the reference documents may be viewed under the Reference Documents section of the combined license application page. In addition, DVDs of the various documents are available by contacting the Public Document Room staff.

Part

Description

Revision

0

Combined License Application Cover Letter

Rev. 8*
Rev. 7
Rev. 6
Rev. 5
Rev. 4
Rev. 3
Rev. 2
Rev. 1
Rev. 0

1

Administrative and Financial Information

Rev. 8
Rev. 7
Rev. 6
Rev. 5
Rev. 4
Rev. 3
Rev. 2
Rev. 1
Rev. 0

2

Final Safety Analysis Report (FSAR)

Rev. 8
Rev. 7
Rev. 6
Rev. 5
Rev. 4
Rev. 3
Rev. 2
Rev. 1
Rev. 0

3

Environmental Report

Rev. 7
Rev. 6
Rev. 5
Rev. 4
Rev. 3
Rev. 2
Rev. 1
Rev. 0

4

Technical Specifications

Rev. 8
Rev. 7
Rev. 6
Rev. 5
Rev. 4
Rev. 3
Rev. 2
Rev. 1
Rev. 0

5

Emergency Plan (excludes sensitive State and Local Emergency Plans)

Rev. 8
Rev. 7
Rev. 5
Rev. 3
Rev. 2
Rev. 1
Rev. 0

6

Limited Work Authorization (LWA)

Rev. 8
Rev. 7
Rev. 6
Rev. 5
Rev. 2
Rev. 0

7

Departures and Exemption Requests

Rev. 8
Rev. 7
Rev. 6
Rev. 5
Rev. 4
Rev. 3
Rev. 2
Rev. 1
Rev. 0

8

Safeguards/Security Plans [This Part contains safeguards information which is withheld from public availability]

 

9

[This Part contains other information which is withheld from public availability]

 

10

License Conditions and Inspection, Tests, Analyses and Acceptance Criteria (ITAAC)

Rev. 8
Rev. 7
Rev. 6
Rev. 5
Rev. 4
Rev. 3
Rev. 2
Rev. 1
Rev. 0

11

COLA Enclosure 1 (Quality Assurance Program Plan and Geotechnical Data)

Rev. 8
Rev. 7
Rev. 6
Rev. 4
Rev. 3
Rev. 2
Rev. 1
Rev. 0

* A "roadmap" providing a discussion of the Revision 8 changes to the application was provided in a Florida Power and Light Company letter dated September 16, 2016.

To top of page

Review Schedule

Key Milestones

Completion Date
Actual - A
Target - T

Application Tendered

06/30/09 - A

Acceptance Review

Acceptance Review Start

06/30/09 - A

Docketing Decision Letter Issued/Acceptance Review Complete

09/04/09 - A

Review Schedule Established/Schedule Letter Issued to Applicant

10/27/15 - A

Safety Review

Phase A - Requests for Additional Information (RAIs) and Supplemental RAIs

06/16/15 - A

Phase B - Advance Final safety evaluation report (SER) without Open Items

07/14/16 - A

Phase C - ACRS Review of Advance Final SER

08/19/16 - A

Phase D - Final SER

11/10/16 - A

Environmental Review

Phase 1 - Environmental impact statement (EIS) scoping summary report issued

12/10 - A

Phase 2 - Draft EIS issued to EPA

02/27/15 - A

Phase 3 - Final EIS issued to EPA

10/28/16 - A

Supplement to Final EIS issued

12/02/16 - A

Hearing

ASLB holds evidentiary hearing

05/02 - 03/17 - A

Commission holds mandatory hearing

12/12/17 - A

License

Commission decision on issuance of COL application

04/05/18 - A

To top of page

Safety Evaluations

This section lists the Safety Evaluations that the NRC has issued in connection with its review of the COL application that FPL submitted for Turkey Point, Units 6 & 7.

To top of page

Environmental Impact Statement

This section lists the Environmental Impact Statement that the NRC has issued in review of the COL application that FPL submitted for Turkey Point, Units 6 & 7.

To top of page

Topical Reports

The NRC has issued no Topical Reports in connection with its review of the COL application that FPL submitted for Turkey Point, Units 6 & 7.

To top of page

Combined Licenses (COLs)

This section provides the COLs that the NRC issued on April 12, 2018, in connection with its review of the COL application for Turkey Point, Units 6 and 7.

To top of page

Summary Record of Decision

This section provides the Summary Record of Decision that the NRC issued in connection with its review of the COL application for Turkey Point, Units 6 and 7.

To top of page

To top of page

Contacts

For additional information regarding Turkey Point COL Application, please Contact a Public Affairs Officer.

To top of page

Page Last Reviewed/Updated Friday, March 06, 2026

Page Last Reviewed/Updated Friday, March 06, 2026