FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report)
Accession Number: ML13008A462
Date Released: Thursday, January 10, 2013
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML13008A396 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Master Table of Contents (22 page(s), 12/14/2012)
- ML13008A397 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 1 - Introduction and General Description of the Plant (130 page(s), 12/14/2012)
- ML13008A398 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.0 - Site Characteristics (14 page(s), 12/14/2012)
- ML13008A400 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.1 - Geography and Demography (47 page(s), 12/14/2012)
- ML13008A401 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.2 - Nearby Industrial, Transportation, and Military Facilities (79 page(s), 12/14/2012)
- ML13008A402 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.3 - Meteorology (194 page(s), 12/14/2012)
- ML13008A403 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.1 - Hydrologic Description (52 page(s), 12/14/2012)
- ML13008A404 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.2 - Floods (47 page(s), 12/14/2012)
- ML13008A405 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.3 - Probable Maximum Flood on Streams and Rivers (4 page(s), 12/14/2012)
- ML13008A406 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.4 - Potential Dam Failures (3 page(s), 12/14/2012)
- ML13008A407 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.5 - Probable Maximum Surge and Seiche Flooding (35 page(s), 12/14/2012)
- ML13008A408 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.6 - Probable Maximum Tsunami Hazards (172 page(s), 12/14/2012)
- ML13008A409 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.7 - Ice Effects (11 page(s), 12/14/2012)
- ML13008A410 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.8 - Cooling Water Canals and Reservoirs (5 page(s), 12/14/2012)
- ML13008A411 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.9 - Channel Diversions (8 page(s), 12/14/2012)
- ML13008A412 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.10 - Flooding Protection Requirements (3 page(s), 12/14/2012)
- ML13008A413 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.11 - Low Water Considerations (11 page(s), 12/14/2012)
- ML13008A414 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.12 - Groundwater (106 page(s), 12/14/2012)
- ML13008A415 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.12 - Groundwater - Appendix 2AA - Transducer Data (23 page(s), 12/14/2012)
- ML13008A416 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.12 - Groundwater - Appendix 2BB - Aquifer Pumping Test Results (104 page(s), 12/14/2012)
- ML13008A417 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.12 - Groundwater - Appendix 2CC - Groundwater Model Development and Analysis (145 page(s), 12/14/2012)
- ML13008A418 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.12 - Groundwater - Figures 201-225 (30 page(s), 12/14/2012)
- ML13008A419 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.12 - Groundwater - Figures 226-247 (35 page(s), 12/14/2012)
- ML13008A421 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.12 - Groundwater - Figures 248-251 (12 page(s), 12/14/2012)
- ML13008A422 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.13 - Accidental Releases of Radioactive Liquid Effluents in Ground and Surface Waters (55 page(s), 12/14/2012)
- ML13008A423 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.14 - Technical Specification and Emergency Operation Requirements (2 page(s), 12/14/2012)
- ML13008A424 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.4.15 - Combined License Information (3 page(s), 12/14/2012)
- ML13008A426 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.5.0 - Geology, Seismology, and Geotechnical Engineering (11 page(s), 12/14/2012)
- ML13008A427 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.5.1 - Basic Geologic and Seismic Information (322 page(s), 12/14/2012)
- ML13008A428 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.5.1 - Basic Geologic and Seismic Information - Figures 201-228 (31 page(s), 12/14/2012)
- ML13008A429 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.5.1 - Basic Geologic and Seismic Information - Figures 229-252 (24 page(s), 12/14/2012)
- ML13008A430 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.5.1 - Basic Geologic and Seismic Information - Figures 253-278 (30 page(s), 12/14/2012)
- ML13008A431 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.5.1 - Basic Geologic and Seismic Information - Figures 279-303 (25 page(s), 12/14/2012)
- ML13008A433 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.5.1 - Basic Geologic and Seismic Information - Figures 304-322 (21 page(s), 12/14/2012)
- ML13008A435 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.5.1 - Basic Geologic and Seismic Information - Figures 323-349 (27 page(s), 12/14/2012)
- ML13008A436 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.5.2 - Vibratory Ground Motion (239 page(s), 12/14/2012)
- ML13008A437 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.5.3 - Surface Faulting (23 page(s), 12/14/2012)
- ML13008A438 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.5.4 - Stability of Subsurface Materials and Foundations (153 page(s), 12/14/2012)
- ML13008A439 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.5.5 - Stability of Slopes (6 page(s), 12/14/2012)
- ML13008A440 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 2 - Site Characteristics - Section 2.5.6 - Combined License Information (4 page(s), 12/14/2012)
- ML13008A441 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 3 - Design of Structures, Components, Equipment and Systems (245 page(s), 12/14/2012)
- ML13008A442 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 4 - Reactor (7 page(s), 12/14/2012)
- ML13008A443 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 5 - Reactor Coolant System and Connected Systems (20 page(s), 12/14/2012)
- ML13008A444 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 6 - Engineered Safety Features (26 page(s), 12/14/2012)
- ML13008A445 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 7 - Instrumentation and Controls (11 page(s), 12/14/2012)
- ML13008A448 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 8 - Electric Power (27 page(s), 12/14/2012)
- ML13008A449 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 9 - Auxiliary Systems (68 page(s), 12/14/2012)
- ML13008A450 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 10 - Steam and Power Conversion (27 page(s), 12/14/2012)
- ML13008A451 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 11 - Radioactive Waste Management (32 page(s), 12/14/2012)
- ML13008A452 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 12 - Radiation Protection (25 page(s), 12/14/2012)
- ML13008A453 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 13 - Conduct of Operations (74 page(s), 12/14/2012)
- ML13008A454 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 14 - Initial Test Program (45 page(s), 12/14/2012)
- ML13008A455 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 15 - Accident Analyses (13 page(s), 12/14/2012)
- ML13008A457 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 16 - Technical Specifications (4 page(s), 12/14/2012)
- ML13008A459 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 17 - Quality Assurance (10 page(s), 12/14/2012)
- ML13008A460 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 18 - Human Factors Engineering (18 page(s), 12/14/2012)
- ML13008A461 - FPL - Turkey Point Units 6 & 7 COLA (Final Safety Analysis Report) - Part 2 - FSAR - Chapter 19 - Probabilistic Risk Assessment (86 page(s), 12/14/2012)