Pre-Application Activities for Advanced Reactors

Below is a summary of all Advanced Reactor (non-LWR and LWR) applicants, vendors, and research/test reactors that have notified the NRC of their intent to engage, along with a history of those interactions.
The table of contents is arranged by technology and is linked to each applicant or vendors pre-application page.
The NRC guidance for these pre-application engagements is found in Appendix A of the Interim Staff Guidance DANU-ISG-2022-05, “Review of Risk-Informed, Technology-Inclusive Advanced Reactor Applications—Roadmap.” While this guidance focuses on non-light water reactor technologies, the document, especially the environmental sections, generally applies to all reactor technologies.
To be considered active, a vendor or applicant must either submit a Regulatory Engagement Plan (REP) or show a substantial history of pre-application interactions with the NRC. If no project activity (e.g., interactions with the NRC, updates to REPs, etc.) occurs for one year, the project will be deemed inactive.
High Temperature Gas Reactors | Light Water Reactors | Molten Salt Reactors / Molten Chloride Fast Reactors | Sodium Cooled Reactors | Other Designs/ Not Specified |
|---|---|---|---|---|
| ||||
* University of Illinois at Urbana-Champaign - NANO Nuclear Energy Inc. | ||||
Inactive Projects - There are no Inactive Projects at this time. | ||||
* Indicates Microreactor Design