Skip to main content

Terra Innovatum SOLO

Rendering of Terra Innovatum SOLO plaza

Project Overview

The U.S. Nuclear Regulatory Commission (NRC) is currently engaged in pre-application activities with Terra Innovatum as of January 2025. Terra Innovatum is developing its SOLO micro modular reactor design, intended to form the basis for a scalable modular energy platform from MWe to GWe-class. A SOLO unit is designed to deliver approximately 1MWe. The design features a solid heterogeneous composite moderator and is intended to accommodate both traditional zircaloy-clad low-enriched uranium (LEU) fuel or, when available, LEU+ and high-assay low-enriched uranium (HALEU) fuels. Heat removal is accomplished by helium gas which eliminates the need for water from the reactor coolant system. The reactor is intended to feature autonomous operation, on-line safeguards-by-design, and a defense-in-depth structure of radiological barriers with the intent to minimize or eliminate emergency planning zone (EPZ) requirements beyond the operational boundary.

For more information, please see the Terra Innovatum SOLO pre-application documents (NRC Docket 99902138)

To subscribe to the Terra Innovatum SOLO email service, select Terra Innovatum SOLO from the Advanced Reactors list after entering your email into the GovDelivery system.

Pre-Application Activities

Product

Type

Reference 

Status

SOLO Micro Modular Nuclear Reactor Regulatory Engagement Plan, Rev 0

Regulatory Engagement Plan

ML25017A401

No review requested

SOLO Micro Modular Nuclear Reactor Regulatory Engagement Plan, Rev 1

Regulatory Engagement Plan

ML25159A006

No review requested

Design Considerations on Reactor Core (Fuel) at Nominal Conditions

White Paper

ML25159A010

Under review

Proposed Preliminary Safety Analysis Report Content and Exceptions

White Paper

ML25159A011

Under review

Transportation and Logistics for SOLO Research and Test Reactor Deployment

White Paper

ML25159A008

Under review

SOLO Micro Modular Nuclear Reactor Principal Design Criteria

Topical Report

ML25159A013

Under review

SOLO Micro Modular Nuclear Reactor Regulatory Engagement Plan, Rev 2

Regulatory Engagement Plan

ML25265A290

No review requested

Source Term Characterization Methodology

White Paper

ML25257A011

Under review

SOLO Project Quality Plan

Topical Report

ML25257A012

Under review

SOLO Safeguards Methodology and Implementation of the Material Control & Accountancy (MC&A)

Topical Report

ML25257A014

Under review

To top of page

Contacts

Contacts for the Terra Innovatum SOLO Pre-Application Review

Lead Project Manager

Jacqueline Tulip

Contact a Public Affairs Officer

To top of page

Page Last Reviewed/Updated Monday, December 22, 2025

Page Last Reviewed/Updated Monday, December 22, 2025