The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Information Notices - 1992

Document Number Title Revision Publish Date Reviewed Date
IN-92-86 Unexpected Restriction to Thermal Growth of Reactor Coolant Piping -- 12/24/1992 --
IN-92-85 Potential Failures of Emergency Core Cooling Systems Caused By Foreign Material Blockage -- 12/23/1992 --
IN-92-84 Release of Patients Treated with Temporary Implants -- 12/17/1992 --
IN-92-83 Thrust Limits for Limitorque Actuators and Potential Overstressing of Motor-Operated Valves -- 12/17/1992 --
IN-92-82 Results of Thermo-Lag 330-1 Combustibility Testing -- 12/15/1992 --
IN-92-81 Potential Deficiency of Electrical Cables with Bonded Hypalon Jackets -- 12/11/1992 --
IN-92-80 Operation with Steam Generator Tubes Seriously Degraded -- 12/07/1992 --
IN-92-79 Non-Power Reactor Emergency Event Response -- 12/01/1992 --
IN-92-78 Piston to Cylinder Liner Tin Smearing on Cooper-Bessemer KSV Diesel Engines -- 11/30/1992 A 11/30/1992 B --
IN-92-77 Questionable Selection and Review to Determine Suitability of Electropneumatic Relays for Certain Applications -- 11/17/1992 --
IN-92-76 Supplement 1 to NUREG-1358, "Lessons Learned ... Inspection Program for Emergency Operating Procedures (10/88 - 9/91)" -- 11/13/1992 --
IN-92-75 Unplanned Intakes of Airborne Radioactive Material By Individuals at Nuclear Power Plants -- 11/12/1992 --
IN-92-74 Power Oscillations at Washington Nuclear Power Unit 2 -- 11/10/1992 --
IN-92-73 Removal of a Fuel Element From a Research Reactor Core While Critical -- 11/04/1992 --
IN-92-72 Employee Training and Shipper Registration Requirements for Transporting Radioactive Materials -- 10/28/1992 --
IN-92-71 Partial Plugging of Suppression Pool Strainers at a Foreign BWR -- 09/30/1992 --
IN-92-70 Westinghouse Motor-Operated Valve Performance Data Supplied to Nuclear Power Plant Licensees -- 09/25/1992 --
IN-92-69 Water Leakage From Yard Area Through Conduits Into Buildings -- 09/22/1992 --
IN-92-68 Potentially Substandard Slip-On Welding Neck, and Blind Flanges S1 09/16/1996 --
-- 09/10/1992 --
IN-92-67 Deficiency in Design Modifications to Address Failures of Hiller Actuators Upon a Gradual Loss of Air Pressure -- 09/10/1992 --
IN-92-66 Access Denied to NRC Inspectors at Five Star Products, Inc. and Construction Products Research, Fairfield, Connecticut -- 09/01/1992 --
IN-92-65 Safety System Problems Caused By Modifications That Were Not Adequately Reviewed and Tested -- 09/03/1992 --
IN-92-64 Nozzle Ring Settings in Low Pressure Water-Relief Valves -- 08/28/1992 --
IN-92-63 Cracked Insulators in ASL Dry Type Transformers Manufactured By Westinghouse Electric Corporation -- 08/26/1992 --
IN-92-62 Emergency Response Information Requirements for Radioactive Material Shipments -- 08/24/1992 --
IN-92-61 Loss of High Head Safety Injection S1 11/06/1992 --
-- 08/20/1992 --
IN-92-60 Valve Stem Failure Caused by Embrittlement -- 08/20/1992 --
IN-92-59 Horizontally-Installed Motor-Operated Gate Valves 1 11/02/1992 --
-- 08/18/1992 --
IN-92-58 Uranium Hexafluoride Cylinders - Deviations in Coupling Welds -- 08/12/1992 --
IN-92-57 Radial Cracking of Shroud Support Access Hole Cover Welds -- 08/11/1992 --
IN-92-56 Counterfeit Valves in the Commercial Grade Supply System -- 08/06/1992 --
IN-92-55 Current Fire Endurance Test Results for Thermo-Lag Fire Barrier Material -- 07/27/1992 --
IN-92-54 Level Instrumentation Inaccuracies Caused by Rapid Depressurization -- 07/24/1992 --
IN-92-53 Potential Failure of Emergency Diesel Generators Due to Excessive Rate of Loading -- 07/29/1992 --
IN-92-52 Barriers and Seals Between Mild and Harsh Environments -- 07/15/1992 --
IN-92-51 Misapplication and Inadequate Testing of Molded- Case Circuit Breakers S1 04/11/1994 --
-- 07/09/1992 --
IN-92-50 Cracking of Valves in the Condensate Return Lines of a BWR Emergency Condenser System -- 07/02/1992 A 07/02/1992 B --
IN-92-49 Recent Loss or Severe Degradation of Service Water Systems -- 07/02/1992 --
IN-92-48 Failure of Exide Batteries -- 07/02/1992 A 07/02/1992 B --
IN-92-47 Intentional Bypassing of Automatic Actuation of Plant Protective Features -- 06/29/1992 A 06/29/1992 B --
IN-92-46 Thermo-Lag Fire Barrier ... Review Team ... Findings, Current Fire Endurance Tests, and Ampacity Calculation Errors FINAL REPORT 04/17/1992 --
-- 06/23/1992 --
IN-92-45 Incorrect Relay Used in Emergency Diesel Generator Output Breaker Control Circuitry -- 06/22/1992 --
IN-92-44 Problems with Westinghouse DS-206 and DSL-206 Type Circuit Breakers -- 06/18/1992 --
IN-92-43 Defective Molded Phenolic Armature Carriers Found on Elmwood Contactors -- 06/09/1992 --
IN-92-42 Fraudulent Bolts in Seismically Designed Walls -- 06/01/1992 --
IN-92-41 Consideration of the Stem Rejection Load in Calculation of Required Valve Thrust -- 05/29/1992 --
IN-92-40 Inadequate Testing of Emergency Bus Undervoltage Logic Circuitry -- 05/27/1992 --
IN-92-39 Unplanned Return to Criticality During Reactor Shutdown -- 05/13/1992 --
IN-92-38 Implementation Date ... Revision ... EPA Manual of Protective Action Guides and Protective Actions for Nuclear Incidents -- 05/12/1992 --
IN-92-37 Implementation of the Deliberate Misconduct Rule -- 05/08/1992 --
IN-92-36 Intersystem LOCA Outside Containment S1 02/22/1994 --
-- 05/07/1992 --
IN-92-35 Higher ... Erosion/Corrosion in Unisolable Reactor Coolant Pressure Boundary Piping Inside Containment at a BWR -- 05/06/1992 --
IN-92-34 New Exposures Limits for Airborne Uranium and Thorium -- 05/06/1992 --
IN-92-33 Increased Instrument Response Time When Pressure Dampening Devices are Installed -- 04/30/1992 --
IN-92-32 Problems ... Emergency Ventilation Systems for Near-Site ... Emergency Operations Facilities & Technical Support Centers -- 04/29/1992 --
IN-92-31 Electrical Connection Problem in Johnson Yokogawa Corporation YS-80 Programmable Indicating Controllers -- 04/27/1992 --
IN-92-30 Falsification of Plant Records -- 04/23/1992 --
IN-92-29 Potential Breaker Miscoordination Caused by Instantaneous Trip Circuitry -- 04/17/1992 --
IN-92-28 Inadequate Fire Suppression System Testing -- 04/08/1992 --
IN-92-27 Thermally Induced Accelerated Aging and Failure of ITE/Gould A.C. Relays Used in Safety-Related Applications S1 03/21/1997 --
-- 04/03/1992 --
IN-92-26 Pressure Locking of Motor-Operated Flexible Wedge Gate Valves -- 04/02/1992 --
IN-92-25 Potential Weakness in Licensee Procedures for a Loss of the Refueling Cavity Water -- 03/31/1992 --
IN-92-24 Distributor Modification to Certain Commercial-Grade Agastat Electrical Relays -- 03/30/1992 --
IN-92-23 Results of Validation Testing of Motor-Operated Valve Diagnostic Equipment -- 03/27/1992 --
IN-92-22 Criminal Prosecution and Conviction of Wrongdoing Committed by a Commercial-Grade Valve Supplier -- 03/24/1992 --
IN-92-21 Spent Fuel Pool Reactivity Calculations S1 04/22/1992 --
-- 03/24/1992 --
IN-92-20 Inadequate Local Leak Rate Testing -- 03/03/1992 --
IN-92-19 Misapplication of Potter & Brumfield MDR Rotary Relays -- 03/02/1992 --
IN-92-18 Potential for Loss of Remote Shutdown Capability During a Control Room Fire -- 02/28/1992 --
IN-92-17 NRC Inspections of Programs Being Developed at Nuclear Power Plants in Response to Generic Letter 89-10 -- 02/26/1992 --
IN-92-16 Loss of Flow From the Residual Heat Removal Pump During Refueling Cavity Draindown S2 08/23/1993 --
S1 05/07/1992 --
-- 02/25/1992 --
IN-92-15 Failure of Primary Compression Fitting -- 02/24/1992 --
IN-92-14 Uranium Oxide Fires at Fuel Cycle Facilities -- 02/21/1992 --
IN-92-13 Inadequate Control Over Vehicular Traffic at Nuclear Power Plant Sites -- 02/18/1992 --
IN-92-12 Effects of Cable Leakage Currents on Instrument Settings and Indications -- 02/10/1992 --
IN-92-11 Soil and Water Contamination at Fuel Cycle Facilities -- 02/05/1992 --
IN-92-10 Brachytherapy Incidents Involving Iridium-192 Wire Used in Endobronchial Treatments -- 01/31/1992 --
IN-92-09 Overloading and Subsequent Lock Out of Electrical Buses During Accident Conditions -- 01/30/1992 --
IN-92-08 Revised Protective Action Guidance for Nuclear Incidents -- 01/23/1992 --
IN-92-07 Rapid Flow-Induced Erosion/Corrosion of Feedwater Piping -- 01/09/1992 --
IN-92-06 Reliability of ATWS Mitigation Systems and Other NRC-Required Equipment Not Controlled by Plant Technical Specifications S1 07/01/1993 --
-- 01/15/1992 --
IN-92-05 Potential Coil Insulation Breakdown in ABB RXMH2 Relays -- 01/08/1992 --
IN-92-04 Potter & Brumfield Model MDR Rotary Relay Failures -- 01/06/1992 --
IN-92-03 Remote Trip Function Failures in General Electric F-Frame Molded-Case Circuit Breakers -- 01/06/1992 --
IN-92-02 Supplement 1: RELAP5/MOD3 Computer Code Error Associated with the Conservation of Energy Equation S1 01/03/1992 --
IN-92-02 RELAP5/MOD3 Computer Code Error Associated with the Conservation of Energy Equation -- 01/03/1992 --
IN-92-01 Cable Damage Caused by Inadequate Cable Installation Procedures and Controls -- 01/03/1992 --

Page Last Reviewed/Updated Wednesday, March 12, 2025