The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Information Notices - 2011

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Document Number Title Revision Publish Date Reviewed Date
IN-11-22 Instrumentation and Control Module Hardware, Configuration, and Procedure Issues -- 12/21/2011 --
IN-11-21 Realistic Emergency Core Cooling System Evaluation Model Effects Resulting From Nuclear Fuel Thermal Conductivity Degradation -- 12/13/2011 --
IN-11-20 Concrete Degradation by Alkali-Silica Reaction -- 11/18/2011 --
IN-11-19 Licensee Event Reports Containing Information Pertaining to Defects to Basic Components -- 09/26/2011 --
IN-11-18   -- Not Issued --
IN-11-17 Calculation Methodologies for Operability Determinations Of Gas Voids in Nuclear Power Plant Piping -- 07/26/2011 --
IN-11-16   -- Not Issued --
IN-11-15 Steel Containment Degradation and Associated License Renewal Aging Management Issues -- 08/01/2011 --
IN-11-14 Component Cooling Water System Gas Accumulation and Other Performance Issues -- 07/18/2011 --
IN-11-13 Control Rod Blade Cracking Resulting in Reduced Design Lifetime -- 06/29/2011 --
IN-11-12 Reactor Trips Resulting From Water Intrusion Into Electrical Equipment -- 06/16/2011 --
IN-11-11 Reporting Requirement for Heat and Smoke Detector Failures in 10 CFR Part 36 Irradiators -- 04/27/2011 --
IN-11-10 Thermal Issues Identified During Loading of Spent Fuel Storage Casks -- 05/02/2011 --
IN-11-09 Fixed Gauge Shutter Failures Due To Operating in Harsh Working Environments -- 05/18/2011 --
IN-11-08 Tohoku-Taiheiyou-Oki Earthquake Effects On Japanese Nuclear Power Plants - for Fuel Cycle Facilities -- 03/31/2011 --
IN-11-07 Specific License Required When Exporting To Embargoed Destinations Listed in 10 CFR 110.28 -- 04/14/2011 --
IN-11-06 Erroneous Criticality Alarm Monitoring Signal Caused By Incorrect Data Acquisition Module Configuration -- 03/22/2011 --
IN-11-05 Tohoku-Taiheiyou-Oki Earthquake Effects On Japanese Nuclear Power Plants -- 03/18/2011 --
IN-11-04 Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping Pressurized Water Reactors -- 02/23/2011 --
IN-11-03 Nonconservative Criticality Safety Analyses for Fuel Storage -- 02/16/2011 --
IN-11-02 Operator Performance Issues Involving Reactivity Management at Nuclear Power Plants -- 01/31/2011 --
IN-11-01 Commercial-Grade Dedication Issues Identified During NRC Inspections -- 02/15/2011 --