Skip to main content

Alert

The NRC is shutdown due to the lapse in appropriations. Exempted activities to maintain critical health and safety activities and progress on critical activities, including activities outlined in Executive Order 14300, as described in the OMB Approved NRC Lapse Plan will continue.

Information Notices - 1979

Document Number Title Revision Publish Date Reviewed Date
IN-79-37 Cracking in Low Pressure Turbine Discs -- 12/28/1979 --
IN-79-36 Computer Code Defect in Stress Analysis of Piping Elbow -- 12/31/1979 --
IN-79-35 Control of Maintenance and Essential Equipment -- 12/31/1979 --
IN-79-34 Inadequate Design of Safety-Related Heat Exchangers -- 12/27/1979 --
IN-79-33 Improper Closure of Primary Containment Access Hatches -- 12/21/1979 --
IN-79-32 Separation of Electrical Cables for HPCI and ADS -- 12/18/1979 --
IN-79-31 Use of Incorrect Amplified Response Spectra (ARS) -- 12/11/1979 --
IN-79-30 Reporting of Defects and Noncompliance, 10 CFR Part 21 -- 12/04/1979 --
IN-79-29 Loss of Nonsafety-Related Reactor Coolant System Instrumentation During Operation -- 11/16/1979 --
IN-79-28 Overloading of Structural Elements Due to Pipe Support Loads -- 11/16/1979 --
IN-79-27 Steam Generator Tube Ruptures at Two PWR Facilities -- 11/16/1979 --
IN-79-26 Breach of Containment Integrity -- 11/01/1979 --
IN-79-25 Reactor Trips at Turkey Point Units 3 and 4 -- 09/28/1979 --
IN-79-24 Overpressurization of Containment of a PWR Plant after a Main Steam Line Break -- 09/23/1979 --
IN-79-23 Emergency Diesel Generator Lube Oil Coolers -- 09/25/1979 --
IN-79-22 Qualification of Control Systems -- 09/14/1979 --
IN-79-21 Transportation and Commercial Burial of Radioactive Materials -- 09/05/1979 --
IN-79-20 NRC Enforcement Policy - NRC Licensed Individuals 1 09/01/1979 --
-- 08/10/1979 --
IN-79-19 Pipe Cracks in Stagnant Borated Water Systems at PWR Plants -- 07/17/1979 --
IN-79-18 Skylab Reentry -- 07/05/1979 --
IN-79-17 Source Holder Assembly Damage from Misfit between Assembly and Reactor Upper Grid Plate -- 06/18/1979 --
IN-79-16 Nuclear Incident at Three Mile Island -- 06/15/1979 --
IN-79-15 Deficient Procedures - -- 06/07/1979 --
IN-79-14 Safety Classification of Electrical Cable Support Systems -- 06/04/1979 --
IN-79-13 Indication of Low Water Level in the Oyster Creek Reactor -- 05/29/1979 --
IN-79-12a Attempted Damage to New Fuel Assemblies -- 11/08/1979 --
IN-79-12 Attempted Damage to New Fuel Assemblies -- 05/10/1979 --
IN-79-11 Lower Reactor Vessel Head Insulation Support Problem -- 05/04/1979 --
IN-79-10 Nonconforming Pipe Support Struts -- 04/11/1979 --
IN-79-09 Spill of Radioactively Contaminated Resin -- 03/30/1979 --
IN-79-08 Interconnection of Contaminated Systems with Service Air Systems Used as the Source of Breathing Air -- 03/28/1979 --
IN-79-07 Rupture of Radwaste Tanks -- 03/23/1979 --
IN-79-06 Stress Analysis of Safety-Related Piping -- 03/22/1979 --
IN-79-05 Use of Improper Materials in Safety-Related Components -- 03/16/1979 --
IN-79-04 Degradation of Engineered Safety Features -- 02/14/1979 --
IN-79-03 Limitorque Valve Geared Limit Switch Lubricant -- 02/06/1979 --
IN-79-02 Attempted Extortion - Low Enriched Uranium -- 02/02/1979 --
IN-79-01 Bergen-Paterson Hydraulic Shock and Sway Arrestor -- 01/31/1979 --

Page Last Reviewed/Updated Friday, January 10, 2025

Page Last Reviewed/Updated Friday, January 10, 2025