Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Information Notices - 2008

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Document Number Title Revision Publish Date Reviewed Date
IN-08-22 Molybdenum-90 Breakthrough in Molybdenum-99/Technetium-99M Generators -- 01/12/2009 --
IN-08-21 Impact Of Non-Safety Electrical Support System Vulnerabilities On Safety Systems -- 11/24/2008 --
IN-08-20 Failures of Motor Operated Valve Actuator Motors with Magnesium Alloy Rotors -- 12/08/2008 --
IN-08-19 Tamper-Indicating Device Issues -- 12/16/2008 --
IN-08-18 Loss of a Safety-Related Motor Control Center Caused by a Bus Fault -- 12/01/2008 --
IN-08-17 Construction Experience with Concrete Placement -- 10/22/2008 --
IN-08-16 Summary of Fitness-For-Duty Program Performance Reports for Calendar Year 2007 -- 09/02/2008 --
IN-08-15 Emergency Response Data System Test Schedule Revised -- 08/12/2008 --
IN-08-14 Criticality Safety-related Events Resulting from Fissile Material Operations under Procedures Not Reviewed by Criticality Safety Staff -- 07/29/2008 --
IN-08-13 Main Feedwater System Issues and Related 2007 Reactor Trip Data -- 07/30/2008 --
IN-08-12 Braidwood Unit 1 Reactor Trip Due to Off-Site Power Fluctuation -- 07/07/2008 --
IN-08-11 Service Water System Degradation at Brunswick Steam Electric Plant Unit 1 -- 06/18/2008 --
IN-08-10 Response to Indications of Potential Tampering, Vandalism, or Malicious Mischief -- 05/01/2008 --
IN-08-09 Turbine-driven Auxiliary Feedwater Pump Bearing Issues W Superseded by RIS 2002-12B, Rev. 1 02/17
-- 05/22/2008 --
IN-08-08 Maintenance Procedures Compromise Double-Contingency of UO2 Powder-Handling Equipment at Fuel Cycle Facility -- 04/16/2008 --
IN-08-07 Cracking Indications in Thermally Treated Alloy 600 Steam Generator Tubes -- 04/24/2008 --
IN-08-06 Instrument Air System Failure Resulting in Manual Reactor Trip -- 04/10/2008 --
IN-08-05 Fires Involving Emergency Diesel Generator Exhaust Manifolds -- 04/10/2008 --
IN-08-04 Counterfeit Parts Supplied to Nuclear Power Plants -- 04/07/2008 --
IN-08-03 Precautions to take before Sharing Sensitive Security-Related Information -- 05/16/2008 --
IN-08-02 Findings Identified During Component Design Bases Inspections -- 03/19/2008 --
IN-08-01 Designation and Protection Of Safeguards Information -- 01/03/2008 --

To top of page

Page Last Reviewed/Updated Tuesday, March 09, 2021

Page Last Reviewed/Updated Tuesday, March 09, 2021