Skip to main content

Alert

The NRC is shutdown due to the lapse in appropriations. Exempted activities to maintain critical health and safety activities and progress on critical activities, including activities outlined in Executive Order 14300, as described in the OMB Approved NRC Lapse Plan will continue.

Information Notices – 2018

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Document Number Title Revision Publish Date Reviewed Date
IN-18-11 Kobe Steel Quality Assurance Record Falsification S1 12/01/2020 --
-- 09/24/2018 --
IN-18-10 Thermal Sleeve Flange Wear Leads to Stuck Control Rod at Foreign Nuclear Plant -- 08/29/2018 --
IN-18-09 Electrical Arc Flash Caused by Foreign Material Damages Fire Door -- 08/10/2018 --
IN-18-08 Failure to Enter the Required Technical Specifications Action Statement for Operation During Recent Surveillance Testing While Using a Reactor Protection System Test Box -- 06/13/2018 --
IN-18-07 Pump/Turbine Bearing Oil Sight Glass Problems -- 06/13/2018 --
IN-18-06 Determination of Management Measures for Process Isolation Controls Designated as Items Relied on for Safety and Implementation of Adequate Quality Assurance Measures for Plant Features and Procedures -- 04/10/2018 --
IN-18-05 Long-Term Fissile Material Accumulation Due to Unanalyzed or Improperly Analyzed Conditions at Fuel Cycle Facilities -- 03/26/2018 --
IN-18-04 Operating Experience Regarding Failure of Operators to Trip the Plant When Experiencing Unstable Conditions -- 02/26/2018 --
IN-18-03 Operating Experience Regarding Failure to Meet Technical Specifications Requirements for Changing Plant Conditions -- 02/26/2018 --
IN-18-02 Testing and Operations-Induced Degradation of 3-Stage Target Rock Safety Relief Valves -- 02/26/2018 --
IN-18-01 Noble Fission Gas Releases During Spent Fuel Cask Loading Operations -- 02/21/2018 --

Page Last Reviewed/Updated Tuesday, March 09, 2021

Page Last Reviewed/Updated Tuesday, March 09, 2021