Skip to main content

Alert

The NRC is shutdown due to the lapse in appropriations. Exempted activities to maintain critical health and safety activities and progress on critical activities, including activities outlined in Executive Order 14300, as described in the OMB Approved NRC Lapse Plan will continue.

Information Notices - 2012

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Document Number Title Revision Publish Date Reviewed Date
IN-12-25 Performance Issues with Seismic Instrumentation and Associated Systems for Operating Reactors -- 02/01/2013 --
IN-12-24   -- Not Issued --
IN-12-23 Recent Radiography Events Resulting in Exposures Exceeding Regulatory Limits -- 12/26/2012 --
IN-12-22 Counterfeit, Fraudulent, Suspect Item (CFSI) Training Offerings -- 01/25/2013 --
IN-12-21 Reactor Vessel Closure Head Studs Remain Detensioned During Plant Startup -- 12/10/2012 --
IN-12-20 Chloride-Induced Stress Corrosion Cracking of Austenitic Stainless Steel and Maintenance of Dry Cask Storage System Canisters -- 11/14/2012 --
IN-12-19 License Renewal Post-Approval Site Inspection Issues -- 10/23/2012 --
IN-12-18 Failure to Properly Augment Emergency Response Organizations -- 10/26/2012 --
IN-12-17 Inappropriate Use of Certified Material Test Report Yield Stress and Age-Hardened Concrete Compressive Strength in Design Calculations -- 09/06/2012 --
IN-12-16 Preconditioning of Pressure Switches Before Surveillance Testing -- 08/29/2012 --
IN-12-15 Use of Seal Cap Enclosures To Mitigate Leakage From Joints That Use A-286 Bolts -- 08/09/2012 --
IN-12-14 Motor-Operated Valve Inoperable Due To Stem-Disc Separation -- 07/24/2012 --
IN-12-13 Boraflex Degradation Surveillance Programs and Corrective Actions in the Spent Fuel Pool -- 08/10/2012 --
IN-12-12 HVAC Design Control Issues Challenge Safety System Function -- 07/24/2012 --
IN-12-11 Age Related Capacitor Degradation -- 07/23/2012 --
IN-12-10 Recent Issues Associated with Submittal of NRC Form 396, Certification on Medical Examination By Facility Licensee, for Applicants and Licensed Operators at Non-Power Reactors -- 07/16/2012 --
IN-12-09 Irradiation Effects on Fuel Assembly Spacer Grid Crush Strength -- 06/28/2012 --
IN-12-08 High Dose-Rate Remote Afterloader (HDR) Physical Presence Requirements -- 04/10/2012 --
IN-12-07 Tube-to-Tube Contact Resulting in Wear in Once-Through Steam Generators -- 07/17/2012 --
IN-12-06 Ineffective Use of Vendor Technical Recommendations -- 04/24/2012 --
IN-12-05 Abnormal Releases of Radioactive Water Potentially Resulting in Groundwater Contamination -- 04/25/2012 --
IN-12-04 Impacts On Normal Plant Operations Due To Leaks Or Spills Of Chemicals -- 04/19/2012 --
IN-12-03 Design Vulnerability in Electric Power System -- 03/01/2012 --
IN-12-02 Potentially Nonconservative Screening Value for Dam Failure Frequency in Probabilistic Risk Assessments -- 03/05/2012 --
IN-12-01 Seismic Considerations - Principally Issues Involving Tanks -- 01/26/2012 --

Page Last Reviewed/Updated Tuesday, March 09, 2021

Page Last Reviewed/Updated Tuesday, March 09, 2021