The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Information Notices - 1998

Document Number Title Revision Publish Date Reviewed Date
IN-98-45 Cavitation Erosion of Letdown Line Orifices Resulting in Fatigue Cracking of Pipe Welds -- 12/15/1998 --
IN-98-44 Ten-Year Inservice Inspection (ISI) Program Update for Licensees That Intend to Implement Risk-Informed ISI of Piping -- 12/10/1998 --
IN-98-43 Leaks in the Emergency Diesel Generator Lubricating Oil and Jacket Cooling Water Piping -- 12/04/1998 --
IN-98-42 Implementation of 10 CFR 50.55a(g) Inservice Inspection Requirements -- 12/01/1998 --
IN-98-41 Spurious Shutdown of Emergency Diesel Generators from Design Oversight -- 11/20/1998 --
IN-98-40 Design Deficiencies Can Lead to Reduced ECCS Pump Net Positive Suction Head During Design-Basis Accidents -- 10/26/1998 --
IN-98-39 Summary of Fitness-For-Duty Program Performance Reports for Calendar Years 1996 and 1997 -- 10/30/1998 --
IN-98-38 Metal-Clad Circuit Breaker Maintenance Issues Identified by NRC Inspections -- 10/15/1998 --
IN-98-37 Eligibility of Operator License Applicants -- 10/01/1998 --
IN-98-36 Inadequate or Poorly Controlled, Non-Safety-Related Maintenance Activities Unnecessarily Challenged Safety Systems -- 09/18/1998 --
IN-98-35 Threat Assessments and Consideration of Heightened Physical Protection Measures issued W, Superseded by RIS 2002-12A, RIS 2002-12C, RIS 2002-12D, RIS 2002-12i 02/17/2023
-- 09/04/1998 --
IN-98-34 Configuration Control Errors -- 08/28/1998 --
IN-98-33 NRC Regulations Prohibit Agreements That Restrict or Discourage an Employee from Participating in Protected Activities -- 08/28/1998 --
IN-98-32 NONE -- 01/26/1999 --
IN-98-31 Fire Protection System Design Deficiencies and Common-Mode Flooding of Emergency Core Cooling System Rooms at Washington Nuclear Project Unit 2 -- 08/18/1998 --
IN-98-30 Effect of the Year 2000 Computer Problem on NRC Licensees and Certificate Holders -- 08/12/1998 --
IN-98-29 Predicted Increase in Fuel Rod Cladding Oxidation -- 08/03/1998 A 08/03/1998 B --
IN-98-28 Development of Systematic Sample Plan for Operator Licensing Examinations -- 07/31/1998 --
IN-98-27 Steam Generator Tube End Cracking -- 07/24/1998 --
IN-98-26 Settlement Monitoring and Inspection of Plant Structures Affected by Degradation of Porous Concrete Subfoundations -- 07/24/1998 --
IN-98-25 Loss of Inventory from Safety-Related, Closed-Loop Cooling Water Systems -- 07/08/1998 --
IN-98-24 Stem Binding in Turbine Governor Valves in Reactor Core Isolation Cooling (RCIC) and Auxiliary Feedwater (AFW) Systems -- 06/26/1998 --
IN-98-23 Crosby Relief Valve Setpoint Drift Problems Caused by Corrosion of The Guide Ring -- 06/23/1998 --
IN-98-22 Deficiencies Identified During NRC Design Inspections -- 06/17/1998 --
IN-98-21 Potential Deficiency of Electrical Cable/Connection Systems -- 06/04/1998 --
IN-98-20 Problems with Emergency Preparedness Respiratory Protection Programs -- 06/03/1998 --
IN-98-19 Shaft Binding in General Electric Type SBM Control Switches -- 06/03/1998 --
IN-98-18 Recent Contamination Incidences Resulting from Failure to Perform Adequate Surveys -- 05/13/1998 --
IN-98-17 Federal Bureau of Investigation's (FBI) Awareness of National Security Issues and Response (ANSIR) Program -- 05/07/1998 --
IN-98-16 Inadequate Operational Checks of Alarm Ratemeters -- 04/30/1998 --
IN-98-15 Integrity of Operator Licensing Examinations -- 04/20/1998 --
IN-98-14 Undocumented Changes to Non-Power Reactor Safety System Wiring -- 04/20/1998 --
IN-98-13 Post-Refueling Outage Reactor Pressure Vessel Leak Testing Before Core Criticality -- 04/20/1998 --
IN-98-12 Licensees' Responsibilities Regarding Reporting and Follow-Up Requirements for Nuclear-Powered Pacemakers -- 04/03/1998 --
IN-98-11 Cracking of Reactor Vessel Internal Baffle Former Bolts in Foreign Plants -- 03/25/1998 --
IN-98-10 Probable Misadministrations Occurring During Intravascular Brachytherapy with the Novoste Beta-Cath System -- 03/09/1998 --
IN-98-09 Collapse of an ISOCAM II, Dual-Headed Nuclear Medicine Gamma Camera -- 03/05/1998 --
IN-98-08 Information Likely to be Requested if an Emergency is Declared -- 03/02/1998 --
IN-98-07 Offsite Power Reliability Challenges from Industry Deregulation -- 02/27/1998 --
IN-98-06 Unauthorized Use of License to Obtain Radioactive Materials, and its Implications under the Expanded Title 18 of the U.S. Code -- 02/19/1998 --
IN-98-05 Criminal History Record Information -- 02/11/1998 --
IN-98-04 1997 Enforcement Sanctions for Deliberate Violations of NRC Employee Protection Requirements -- 02/09/1998 --
IN-98-03 Inadequate Verification of Overcurrent Trip Setpoints in Metal-Clad, Low-Voltage Circuit Breakers -- 01/21/1998 --
IN-98-02 Nuclear Power Plant Cold Weather Problems and Protective Measures -- 01/21/1998 --
IN-98-01 Thefts of Portable Gauges -- 01/15/1998 A 01/15/1998 B --

To top of page