Document Number |
Title |
Revision |
Publish Date |
Reviewed Date |
IN-98-45 |
Cavitation Erosion of Letdown Line Orifices Resulting in Fatigue Cracking of Pipe Welds |
-- |
12/15/1998 |
-- |
IN-98-44 |
Ten-Year Inservice Inspection (ISI) Program Update for Licensees That Intend to Implement Risk-Informed ISI of Piping |
-- |
12/10/1998 |
-- |
IN-98-43 |
Leaks in the Emergency Diesel Generator Lubricating Oil and Jacket Cooling Water Piping |
-- |
12/04/1998 |
-- |
IN-98-42 |
Implementation of 10 CFR 50.55a(g) Inservice Inspection Requirements |
-- |
12/01/1998 |
-- |
IN-98-41 |
Spurious Shutdown of Emergency Diesel Generators from Design Oversight |
-- |
11/20/1998 |
-- |
IN-98-40 |
Design Deficiencies Can Lead to Reduced ECCS Pump Net Positive Suction Head During Design-Basis Accidents |
-- |
10/26/1998 |
-- |
IN-98-39 |
Summary of Fitness-For-Duty Program Performance Reports for Calendar Years 1996 and 1997 |
-- |
10/30/1998 |
-- |
IN-98-38 |
Metal-Clad Circuit Breaker Maintenance Issues Identified by NRC Inspections |
-- |
10/15/1998 |
-- |
IN-98-37 |
Eligibility of Operator License Applicants |
-- |
10/01/1998 |
-- |
IN-98-36 |
Inadequate or Poorly Controlled, Non-Safety-Related Maintenance Activities Unnecessarily Challenged Safety Systems |
-- |
09/18/1998 |
-- |
IN-98-35 |
Threat Assessments and Consideration of Heightened Physical Protection Measures issued |
W, Superseded by RIS 2002-12A, RIS 2002-12C, RIS 2002-12D, RIS 2002-12i |
02/17/2023 |
-- |
09/04/1998 |
-- |
IN-98-34 |
Configuration Control Errors |
-- |
08/28/1998 |
-- |
IN-98-33 |
NRC Regulations Prohibit Agreements That Restrict or Discourage an Employee from Participating in Protected Activities |
-- |
08/28/1998 |
-- |
IN-98-32 |
NONE |
-- |
01/26/1999 |
-- |
IN-98-31 |
Fire Protection System Design Deficiencies and Common-Mode Flooding of Emergency Core Cooling System Rooms at Washington Nuclear Project Unit 2 |
-- |
08/18/1998 |
-- |
IN-98-30 |
Effect of the Year 2000 Computer Problem on NRC Licensees and Certificate Holders |
-- |
08/12/1998 |
-- |
IN-98-29 |
Predicted Increase in Fuel Rod Cladding Oxidation |
-- |
08/03/1998 A 08/03/1998 B |
-- |
IN-98-28 |
Development of Systematic Sample Plan for Operator Licensing Examinations |
-- |
07/31/1998 |
-- |
IN-98-27 |
Steam Generator Tube End Cracking |
-- |
07/24/1998 |
-- |
IN-98-26 |
Settlement Monitoring and Inspection of Plant Structures Affected by Degradation of Porous Concrete Subfoundations |
-- |
07/24/1998 |
-- |
IN-98-25 |
Loss of Inventory from Safety-Related, Closed-Loop Cooling Water Systems |
-- |
07/08/1998 |
-- |
IN-98-24 |
Stem Binding in Turbine Governor Valves in Reactor Core Isolation Cooling (RCIC) and Auxiliary Feedwater (AFW) Systems |
-- |
06/26/1998 |
-- |
IN-98-23 |
Crosby Relief Valve Setpoint Drift Problems Caused by Corrosion of The Guide Ring |
-- |
06/23/1998 |
-- |
IN-98-22 |
Deficiencies Identified During NRC Design Inspections |
-- |
06/17/1998 |
-- |
IN-98-21 |
Potential Deficiency of Electrical Cable/Connection Systems |
-- |
06/04/1998 |
-- |
IN-98-20 |
Problems with Emergency Preparedness Respiratory Protection Programs |
-- |
06/03/1998 |
-- |
IN-98-19 |
Shaft Binding in General Electric Type SBM Control Switches |
-- |
06/03/1998 |
-- |
IN-98-18 |
Recent Contamination Incidences Resulting from Failure to Perform Adequate Surveys |
-- |
05/13/1998 |
-- |
IN-98-17 |
Federal Bureau of Investigation's (FBI) Awareness of National Security Issues and Response (ANSIR) Program |
-- |
05/07/1998 |
-- |
IN-98-16 |
Inadequate Operational Checks of Alarm Ratemeters |
-- |
04/30/1998 |
-- |
IN-98-15 |
Integrity of Operator Licensing Examinations |
-- |
04/20/1998 |
-- |
IN-98-14 |
Undocumented Changes to Non-Power Reactor Safety System Wiring |
-- |
04/20/1998 |
-- |
IN-98-13 |
Post-Refueling Outage Reactor Pressure Vessel Leak Testing Before Core Criticality |
-- |
04/20/1998 |
-- |
IN-98-12 |
Licensees' Responsibilities Regarding Reporting and Follow-Up Requirements for Nuclear-Powered Pacemakers |
-- |
04/03/1998 |
-- |
IN-98-11 |
Cracking of Reactor Vessel Internal Baffle Former Bolts in Foreign Plants |
-- |
03/25/1998 |
-- |
IN-98-10 |
Probable Misadministrations Occurring During Intravascular Brachytherapy with the Novoste Beta-Cath System |
-- |
03/09/1998 |
-- |
IN-98-09 |
Collapse of an ISOCAM II, Dual-Headed Nuclear Medicine Gamma Camera |
-- |
03/05/1998 |
-- |
IN-98-08 |
Information Likely to be Requested if an Emergency is Declared |
-- |
03/02/1998 |
-- |
IN-98-07 |
Offsite Power Reliability Challenges from Industry Deregulation |
-- |
02/27/1998 |
-- |
IN-98-06 |
Unauthorized Use of License to Obtain Radioactive Materials, and its Implications under the Expanded Title 18 of the U.S. Code |
-- |
02/19/1998 |
-- |
IN-98-05 |
Criminal History Record Information |
-- |
02/11/1998 |
-- |
IN-98-04 |
1997 Enforcement Sanctions for Deliberate Violations of NRC Employee Protection Requirements |
-- |
02/09/1998 |
-- |
IN-98-03 |
Inadequate Verification of Overcurrent Trip Setpoints in Metal-Clad, Low-Voltage Circuit Breakers |
-- |
01/21/1998 |
-- |
IN-98-02 |
Nuclear Power Plant Cold Weather Problems and Protective Measures |
-- |
01/21/1998 |
-- |
IN-98-01 |
Thefts of Portable Gauges |
-- |