The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Information Notices - 2003

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Document Number Title Revision Publish Date Reviewed Date
IN-03-22 Heightened Awareness for Patients Containing Detectable Amounts of Radiation from Medical Administrations S1 07/29/2009 --
-- 12/09/2003 --
IN-03-21 High-Dose-Rate-Remote-Afterloader Equipment Failure -- 11/24/2003 --
IN-03-20 Derating Whiting Cranes Purchased Before 1980 -- 10/22/2003 --
IN-03-19 Unanalyzed Condition of Reactor Coolant Pump Seal Leakoff Line During Postulated Fire Scenarios or Station Blackout -- 10/06/2003 --
IN-03-18 General Electric Type SBM Control Switches with Defective Cam Followers -- 09/26/2003 --
IN-03-17 Reduced Service Life of Automatic Switch Company (ASCO) Solenoid Valves with Buna-n Material -- 09/29/2003 --
IN-03-16 Icing Conditions Between Bottom Of Dry Storage System and Storage Pad -- 10/06/2003 --
IN-03-15 Importance of Follow-up Activities in Resolving Maintenance Issues -- 09/05/2003 --
IN-03-14 Potential Vulnerability of Plant Computer Network to Worm Infection -- 08/29/2003 --
IN-03-13 Steam Generator Tube Degradation at Diablo Canyon -- 08/28/2003 --
IN-03-12 Problems Involved in Monitoring Dose to the Hands Resulting from the Handling of Radiopharmaceuticals -- 08/22/2003 --
IN-03-11 Leakage Found on Bottom-Mounted Instrumentation Nozzles S1 01/08/2004 --
-- 08/13/2003 --
IN-03-10 Criticality Monitoring System Degradation at BWX Technologies, Inc., Nuclear Products Division, Lynchburg, VA -- 08/04/2003 --
IN-03-09 Source Positioning Errors and System Malfunctions During Administration of Intravascular Brachytherapy -- 07/16/2003 --
IN-03-08 Potential Flooding Through Unsealed Concrete Floor Cracks -- 06/25/2003 --
IN-03-07 Water in the Vent Header/Vent Line Spherical Junctions -- 06/24/2003 --
IN-03-06 Failure of Safety-Related Linestarter Relays at San Onofre Nuclear Generating Station -- 06/19/2003 --
IN-03-05 Failure to Detect Freespan Cracks in PWR Steam Generator Tubes -- 06/05/2003 --
IN-03-04 Summary of Fitness-For-Duty Program Performance Reports for Calendar Year 2000 -- 02/06/2003 --
IN-03-03 Part 21 - Inadequately Staked Capscrew Renders Residual Heat Removal Pump Inoperable -- 01/27/2003 --
IN-03-02 Recent Experience with Reactor Coolant System Leakage and Boric Acid Corrosion -- 01/16/2003 --
IN-03-01 Failure of a Boiling Water Reactor Target Rock Main Steam Safety/Relief Valve -- 01/15/2003 --

To top of page

Page Last Reviewed/Updated Tuesday, January 28, 2025