The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Information Notices - 1982

Document Number Title Revision Publish Date Reviewed Date
IN-82-56 Robertshaw Thermostatic Flow Control Valves -- 12/30/1982 --
IN-82-55 Seismic Qualification of Westinghouse AR Relay with Latch Attachments Used in Westinghouse Solid State Protection System -- 12/28/1982 --
IN-82-54 Westinghouse NBFD Relay Failures in Reactor Protection Systems -- 12/27/1982 --
IN-82-53 Main Transformer Failures at the North Anna Nuclear Power Station -- 12/22/1982 --
IN-82-52 Equipment Environmental Qualification Testing Experience - Updating of Test Summaries Previously Published in IN 81-29 -- 12/21/1982 --
IN-82-51 Overexposures in PWR Cavities – -- 12/21/1982 --
IN-82-50 Modification of Solid State AC Undervoltage Relays Type ITE-27 -- 12/20/1982 --
IN-82-49 Correction for Sample Conditions for Air and Gas Monitoring -- 12/16/1982 --
IN-82-48 Failures of Agastat CR 0095 Relay Sockets -- 12/03/1982 --
IN-82-47 Transportation of Type A Quantities of Non-Fissile Radioactive Material -- 11/30/1982 --
IN-82-46 Defective and Obsolete Combination Padlocks -- 11/26/1982 --
IN-82-45 PWR Low Temperature Overpressure Protection -- 11/19/1982 --
IN-82-44 Clarification of Emergency Plan Exercise Requirements -- 11/18/1982 --
IN-82-43 Deficiencies in LWR Air Filtration/Ventilation Systems -- 11/16/1982 --
IN-82-42 Defects Observed in Panasonic Model 801 and Model 802 Thermoluminescent Dosimeters -- 11/05/1982 --
IN-82-41 Failure of Safety/Relief Valves to Open at a BWR -- 10/22/1982 --
IN-82-40 Deficiencies in Primary Containment Electrical Penetration Assemblies -- 09/22/1982 --
IN-82-39 Service Degradation of Thick Wall Stainless Steel Recirculation System Piping at a BWR Plant -- 09/21/1982 --
IN-82-38 Change in Format and Distribution System for IE Bulletins, Circulars, and Information Notices -- 09/22/1982 --
IN-82-37 Cracking in the Upper Shell to Transition Cone Girth Weld of a Steam Generator at an Operating PWR -- 09/16/1982 --
IN-82-36 Respirator Users Warning for Certain 5-Minute Emergency Escape Self-Contained Breathing Apparatus -- 09/02/1982 --
IN-82-35 Failure of Three Check Valves on High Pressure Injection Lines to Pass Flow -- 08/25/1982 --
IN-82-34 Welds in Main Control Panels 1 09/17/1982 --
-- 08/20/1982 --
IN-82-33 Control of Radiation Levels in Unrestricted Areas Adjacent to Brachytherapy Patients -- 08/20/1982 --
IN-82-32 Contamination of Reactor Coolant System by Organic Cleaning Solvents -- 08/19/1982 --
IN-82-31 Overexposure of Diver During Work in Fuel Storage Pool -- 07/28/1982 --
IN-82-30 Loss of Thermal Sleeves in Reactor Coolant System Piping at Certain Westinghouse PWR Power Plants -- 07/26/1982 --
IN-82-29 Control Rod Drive (CRD) Guide Tube Support Pin Failures at Westinghouse PWRs -- 07/23/1982 --
IN-82-28 Hydrogen Explosion while Grinding in the Vicinity of Drained and Open Reactor Coolant System -- 07/23/1982 --
IN-82-27 Fuel Rod Degradation Resulting from Baffle Water-Jet Impingement -- 08/05/1982 --
IN-82-26 RCIC and HPCI Turbine Exhaust Check Valve Failures -- 07/22/1982 --
IN-82-25 Failures of Hiller Actuators upon Gradual Loss of Air Pressure -- 07/20/1982 --
IN-82-24 Water Leaking from Uranium Hexafluoride Overpacks -- 07/20/1982 --
IN-82-23 Main Steam Isolation Valve (MSIV) Leakage -- 07/16/1982 --
IN-82-22 Failures in Turbine Exhaust Lines -- 07/09/1982 --
IN-82-21 Buildup of Enriched Uranium in Effluent Treatment Tanks -- 06/30/1982 --
IN-82-20 Check Valve Problems – -- 06/28/1982 --
IN-82-19 Loss of High Head Safety Injection Emergency Boration and Reactor Coolant Makeup Capability -- 06/18/1982 --
IN-82-18 Assessment of Intakes of Radioactive Material by Workers -- 06/11/1982 --
IN-82-17 Overpressurization of Reactor Coolant System -- 06/11/1982 --
IN-82-16 HPCI/RCIC High Steam Flow Setpoints -- 05/28/1982 --
IN-82-15 Notification of the Nuclear Regulatory Commission (NRC) -- 05/28/1982 --
IN-82-14 TMI-1 Steam Generator/Reactor Coolant System Chemistry/Corrosion Problem -- 05/12/1982 --
IN-82-13 Failures of General Electric Type HFA Relays -- 05/10/1982 --
IN-82-12 Surveillance of Hydraulic Snubbers -- 04/21/1982 --
IN-82-11 Potential Inaccuracies in Wide Range Pressure Instruments Used in Westinghouse Designed Plants -- 04/09/1982 --
IN-82-10 Following Up Symptomatic Repairs to Assure Resolution of the Problem -- 03/31/1982 --
IN-82-09 Cracking in Piping of Makeup Coolant Lines at B&W Plants -- 03/31/1982 --
IN-82-08 Check Valve Failures on Diesel Generator Engine Cooling System -- 03/26/1982 --
IN-82-07 Inadequate Security Screening Programs -- 03/16/1982 --
IN-82-06 Failure of Steam Generator Primary Side Manway Closure Studs -- 03/12/1982 --
IN-82-05 Increasing Frequency of Drug Related Incidents -- 03/10/1982 --
IN-82-04 Potential Deficiency of Certain Agastat E-7000 Series Time-Delay Relays -- 03/10/1982 --
IN-82-03 Environmental Tests of Electrical Terminal Blocks -- 03/04/1982 --
IN-82-02 Westinghouse NBFD Relay Failures in Reactor Protection Systems at Certain Nuclear Power Plants -- 01/27/1982 --
IN-82-01 Auxiliary Feedwater Pump Lockout Resulting from Westinghouse W-2 Switch Circuit Modification 1 01/26/1982 --
-- 01/22/1982 --