Information Notice No. 82-02:Westinghouse NBFD Relay Failures in Reactor Protection Systems at Certain Nuclear Power Plants
SSINS: 6835
Accession No.:
8107230046
IN 82-02
UNITED STATES
NUCLEAR REGULATORY COMMISSION
OFFICE OF INSPECTION AND ENFORCEMENT
WASHINGTON, D.C. 20555
January 27, 1982
Information Notice No. 82-02: WESTINGHOUSE NBFD RELAY FAILURES IN
REACTOR PROTECTION SYSTEMS AT CERTAIN
NUCLEAR POWER PLANTS
Discussion:
Westinghouse has notified the NRC of a higher-than-expected failure rate of
Westinghouse type NBFD relay coils in reactor protection systems at certain
power reactor plants. Investigation into the cause for failure revealed
that, at high ambient temperature conditions, relay coils could fail due to
the inductive voltage spike generated by the deenergization of the relay
coil. It was also determined that the relay coil failures have been
confined to normally energized relays used in the reactor protection systems
where high ambient temperature conditions exist due to heat generated by the
normally energized relays.
To date, no failures of NBFD relay coils have been reported in safeguard
cabinets where these relays are normally in a deenergized state and
temperature conditions are normal.
After reviewing the NBFD relay problem, Westinghouse issued technical
bulletin NSD-TB-81-14 on December 7, 1981 to Westinghouse-designed power
plants using BFD or NBFD relays in the reactor protection and safeguard
systems. An extract of this bulletin is attached for your information and
appropriate use. The bulletin provides interim test methods for verifying
the operability of normally deenergized and energized NBFD relay
applications and recommends replacement of NBFD relays manufactured prior to
January 1, 1981. The bulletin also provides relay coil numbers as well as
data codes to facilitate affected licensees' replacement efforts if
required.
This information notice is provided as an early notification of a
potentially significant matter. It is expected that recipients will review
the information for applicability to their facilities. No specific action
or response is required at this time. If you have any questions regarding
this matter, please contact the Regional Administrator of the appropriate
NRC Regional Office.
Attachments:
1. Extract of Westinghouse technical bulletin NSD-TB-81-14, dated 12/7/81
2. Recently issued IE Information Notices