Information Notice No. 82-01, Revision 1:Auxiliary Feedwater Pump Lockout Resulting from Westinghouse W-2 Switch Circuit Modification
SSINS: 6835 Accession No.: 820204020105 IN 82-01, Rev. 1 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C. 20555 February 26, 1982 Information Notice No. 82-01, REV. 1: AUXILIARY FEEDWATER PUMP LOCKOUT RESULTING FROM WESTINGHOUSE W-2 SWITCH CIRCUIT MODIFICATION Due to a reproduction problem, Figure 3 of Information Notice No. 82-01 was incomplete as issued to some power reactor facilities holding an operating license or construction permit. A reissue of Figure 3 is attached. Table 1 is also revised to further clarify the circuit diagrams. No specific action or response is required at this time. If you have any questions regarding this matter, please contact the Regional Administrator of the appropriate NRC Regional Office. Attachments: 1. Figure 3 and Table 1 2. Recently issued IE Information Notices
Page Last Reviewed/Updated Tuesday, March 09, 2021
Page Last Reviewed/Updated Tuesday, March 09, 2021