Information Notice No. 82-01, Revision 1:Auxiliary Feedwater Pump Lockout Resulting from Westinghouse W-2 Switch Circuit Modification
SSINS: 6835
Accession No.:
820204020105
IN 82-01, Rev. 1
UNITED STATES
NUCLEAR REGULATORY COMMISSION
OFFICE OF INSPECTION AND ENFORCEMENT
WASHINGTON, D.C. 20555
February 26, 1982
Information Notice No. 82-01, REV. 1: AUXILIARY FEEDWATER PUMP LOCKOUT
RESULTING FROM WESTINGHOUSE W-2
SWITCH CIRCUIT MODIFICATION
Due to a reproduction problem, Figure 3 of Information Notice No. 82-01
was incomplete as issued to some power reactor facilities holding an
operating license or construction permit. A reissue of Figure 3 is
attached. Table 1 is also revised to further clarify the circuit diagrams.
No specific action or response is required at this time. If you have any
questions regarding this matter, please contact the Regional Administrator
of the appropriate NRC Regional Office.
Attachments:
1. Figure 3 and Table 1
2. Recently issued IE Information Notices
Page Last Reviewed/Updated Tuesday, March 09, 2021