Document Number |
Title |
Revision |
Publish Date |
Reviewed Date |
IN-84-94 |
Reconcentration of Radionuclides Involving Discharges Into Sanitary Sewage Systems Permitted Under 10 CFR 20.303 |
-- |
12/21/1984 |
-- |
IN-84-93 |
Potential for Loss of Water From The Refueling Cavity |
-- |
12/17/1984 |
-- |
IN-84-92 |
Cracking of Flywheels On Cummins Fire Pump Diesel Engines |
-- |
12/17/1984 |
-- |
IN-84-91 |
Quality Control Problems of Meteorological Measurements Programs |
-- |
12/10/1984 |
-- |
IN-84-90 |
Main Steam Line Break Effect on Environmental Qualification of Equipment |
-- |
12/07/1984 |
-- |
IN-84-89 |
Stress Corrosion Cracking in Nonsensitized 316 Stainless Steel |
-- |
12/07/1984 |
-- |
IN-84-88 |
Standby Gas Treatment System Problems |
-- |
12/03/1984 |
-- |
IN-84-87 |
Piping Thermal Deflection Induced by Stratified Flow |
-- |
12/03/1984 |
-- |
IN-84-86 |
Isolation Between Signals of The Protection System and Non-Safety-Related Equipment |
-- |
11/30/1984 |
-- |
IN-84-85 |
Molybdenum Breakthrough From Technetium-99m Generators |
-- |
11/30/1984 |
-- |
IN-84-84 |
Deficiencies in Ferro-Resonant Transformers |
1 |
08/24/1985 |
-- |
-- |
11/27/1984 |
-- |
IN-84-83 |
Various Battery Problems |
-- |
11/19/1984 |
-- |
IN-84-82 |
Guidance for Posting Radiation Areas |
-- |
11/19/1984 |
-- |
IN-84-81 |
Inadvertent Reduction in Primary Coolant Inventory in BWRs During Shutdown and Startup |
-- |
11/16/1984 |
-- |
IN-84-80 |
Plant Transients Induced By Failure of Non-Nuclear Instrumentation Power |
-- |
11/08/1984 |
-- |
IN-84-79 |
Failure to Properly Install Steam Separator at Vermont Yankee |
-- |
11/05/1984 |
-- |
IN-84-78 |
Underrated Terminal Blocks That May Adversely Affect Operation of Essential Electrical Equipment |
-- |
11/02/1984 |
-- |
IN-84-77 |
Incident Involving Teletherapy Unit (AECL Eldorado-78) |
-- |
10/26/1984 |
-- |
IN-84-76 |
Loss of All AC Power |
-- |
10/19/1984 |
-- |
IN-84-75 |
Calibration Problems - Eberline Instrument Model 6112B Analog Teletectors |
-- |
10/05/1984 |
-- |
IN-84-74 |
Isolation of Reactor Coolant System From Low-Pressure Systems Outside Containment |
-- |
09/28/1984 |
-- |
IN-84-73 |
Downrating of Self-Aligning Ball Bushings Used in Snubbers |
-- |
09/14/1984 |
-- |
IN-84-72 |
Clarification of Conditions for Waste Shipments Subject To Hydrogen Gas Generation |
-- |
09/10/1984 |
-- |
IN-84-71 |
Graphitic Corrosion of Cast Iron in Salt Water |
-- |
09/06/1984 |
-- |
IN-84-70 |
Reliance on Water Level Instrumentation with a Common Reference Leg |
S1 |
08/26/1985 |
-- |
-- |
09/04/1984 |
-- |
IN-84-69 |
Operation of Emergency Diesel Generators |
S1 |
02/24/1986 |
-- |
-- |
08/29/1984 |
-- |
IN-84-68 |
Potential Deficiency in Improperly Rated Field Wiring to Solenoid Valves |
-- |
08/21/1984 |
-- |
IN-84-67 |
Recent Snubber Inservice Testing with High Failure Rates |
-- |
08/17/1984 |
-- |
IN-84-66 |
Undetected Unavailability of The Turbine-Driven Auxiliary Feedwater Train |
-- |
08/17/1984 |
-- |
IN-84-65 |
Underrated Fuses Which May Adversely Affect Operation of Essential Electrical Equipment |
-- |
08/16/1984 |
-- |
IN-84-64 |
BWR High-Pressure Coolant Injection (HPCI) Initiation Seal-In and Indication |
-- |
08/15/1984 |
-- |
IN-84-63 |
Defective RHR Replacement Piping |
-- |
08/13/1984 |
-- |
IN-84-62 |
Therapy Misadministrations To Patients Undergoing Cobalt-60 Teletherapy Treatments |
-- |
08/10/1984 |
-- |
IN-84-61 |
Overexposure of Driver in PWR Refueling Cavity |
-- |
08/08/1984 |
-- |
IN-84-60 |
Failure of Air-Purifying Respirator Filters To Meet Efficiency Requirement |
-- |
08/06/1984 |
-- |
IN-84-59 |
Deliberate Circumventing of Station Health Physics Procedures |
-- |
08/06/1984 |
-- |
IN-84-58 |
Inadvertent Defeat of Safety Function Caused By Human Error Involving Wrong Unit, Wrong Train, or Wrong System |
-- |
07/25/1984 |
-- |
IN-84-57 |
Operating Experience Related to Moisture Intrusion in Safety-Related Electrical Equipment At Commercial Power Plants |
-- |
07/27/1984 |
-- |
IN-84-56 |
Respirator Users Notice for Certain 5-Minute Emergency Escape Self-Contained Breathing Apparatus |
-- |
07/10/1984 |
-- |
IN-84-55 |
Seal Table Leaks at PWRs |
S1 |
05/14/1985 |
-- |
-- |
07/06/1984 |
-- |
IN-84-54 |
Deficiencies in Design Base Documentation and Calculations Supporting Nuclear Power Plant Design |
-- |
07/05/1984 |
-- |
IN-84-53 |
Information Concerning the Use of Loctite 242 and Other Anaerobic Adhesive/Sealants |
-- |
07/05/1984 |
-- |
IN-84-52 |
Inadequate Material Procurement Controls on the Part of Licensees and Vendors |
S1 |
05/08/1985 |
-- |
-- |
06/29/1984 |
-- |
IN-84-51 |
Independent Verification |
-- |
06/26/1984 |
-- |
IN-84-50 |
Clarification of Scope of Quality Assurance Programs for Transport Packages Pursuant to 10 CFR 50, Appendix B |
-- |
06/21/1984 |
-- |
IN-84-49 |
Intergranular Stress Corrosion Cracking Leading To Steam Generator Tube Failure |
-- |
06/18/1984 |
-- |
IN-84-48 |
Failures of Rockwell International Globe Valves |
S1 |
12/16/1984 |
-- |
-- |
06/18/1984 |
-- |
IN-84-47 |
Environmental Qualification Tests of Electrical Terminal Blocks |
-- |
06/15/1984 |
-- |
IN-84-46 |
Circuit Breaker Position Verification |
-- |
06/13/1984 |
-- |
IN-84-45 |
Reversed Differential Pressure Instrument Sensing Lines |
-- |
06/11/1984 |
-- |
IN-84-44 |
Environmental Qualification Testing of Rockbestos Cables |
-- |
06/08/1984 |
-- |
IN-84-43 |
Storage and Handling of Ophthalmic Beta Radiation Applicators |
-- |
06/07/1984 |
-- |
IN-84-42 |
Equipment Availability for Conditions During Outages not Covered by Technical Specifications |
-- |
06/05/1984 |
-- |
IN-84-41 |
IGSCC in BWR Plants |
-- |
06/01/1984 |
-- |
IN-84-40 |
Emergency Worker Doses |
-- |
05/30/1984 |
-- |
IN-84-39 |
Inadvertent Isolation of Containment Spray Systems |
-- |
05/25/1984 |
-- |
IN-84-38 |
Problems with Design, Maintenance and Operation of Offsite Power Systems |
-- |
05/17/1984 |
-- |
IN-84-37 |
Use of Lifted Leads and Jumpers During Maintenance or Surveillance Testing |
-- |
05/10/1984 |
-- |
IN-84-36 |
Loosening of Locking Nut on Limitorque Operator |
S1 |
09/11/1984 |
-- |
-- |
05/01/1984 |
-- |
IN-84-35 |
BWR Post-Scram Drywell Pressurization |
-- |
04/23/1984 |
-- |
IN-84-34 |
Respirator User Warning: Defective Self-Contained Breathing Apparatus Air Cylinder |
-- |
04/23/1984 |
-- |
IN-84-33 |
Main Steam Safety Valve Failures Caused By Failed Cotter Pins |
-- |
04/20/1984 |
-- |
IN-84-32 |
Auxiliary Feedwater Sparger and Pipe Hanger Damage |
-- |
04/18/1984 |
-- |
IN-84-31 |
Increased Stroking Time of Bettis Actuators Because of Swollen Ethylene-Propylene Rubber Seals and Seal Set |
-- |
04/18/1984 |
-- |
IN-84-30 |
Discrepancies in Record Keeping and Material Defects in Bahnson [HVAC] Units |
-- |
04/18/1984 |
-- |
IN-84-29 |
General Electric Magne-Blast Circuit Breaker Problems |
-- |
04/17/1984 |
-- |
IN-84-28 |
Recent Serious Violations of NRC Requirements by Well-Logging Licensees |
-- |
04/17/1984 |
-- |
IN-84-27 |
Recent Serious Violations of NRC Requirements by Medical Licensees |
-- |
04/17/1984 |
-- |
IN-84-26 |
Recent Serious Violations of NRC Requirements by Moisture Density Gauge Licensees |
-- |
04/16/1984 |
-- |
IN-84-25 |
Recent Serious Violations of NRC Requirements by Radiography Licensees |
-- |
04/16/1984 |
-- |
IN-84-24 |
Physical Qualification of Individuals to Use Respiratory Protective Devices |
-- |
04/05/1984 |
-- |
IN-84-23 |
Results of The NRC-Sponsored Qualification Methodology Research Test on ASCO Solenoid Valves |
-- |
04/05/1984 |
-- |
IN-84-22 |
Deficiency in Comsip, Inc. Standard Bed Catalyst |
-- |
03/29/1984 |
-- |
IN-84-21 |
Inadequate Shutdown Margin |
-- |
03/28/1984 |
-- |
IN-84-20 |
Service Life of Relays in Safety-Related System |
-- |
03/21/1984 |
-- |
IN-84-19 |
Two Events Involving Unauthorized Entries Into PWR Reactor Cavities |
-- |
03/21/1984 |
-- |
IN-84-18 |
Stress Corrosion Cracking in PWR Systems |
-- |
03/07/1984 |
-- |
IN-84-17 |
Problems with Liquid Nitrogen Cooling Components Below the Nil Ductility Temperature |
-- |
03/05/1984 |
-- |
IN-84-16 |
Failure of Automatic Sprinkler System Valves to Operate |
-- |
03/02/1984 |
-- |
IN-84-15 |
Reporting of Radiological Releases |
-- |
03/02/1984 |
-- |
IN-84-14 |
Highlights of Recent Transport Regulatory Revisions By DOT and NRC |
-- |
03/02/1984 |
-- |
IN-84-13 |
Potential Deficiency in Motor-Operated Valve Control Circuits and Annunciation |
-- |
02/28/1984 |
-- |
IN-84-12 |
Failure of Soft Seat Valve Seals |
-- |
02/27/1984 |
-- |
IN-84-11 |
Training Program Deficiencies |
-- |
02/24/1984 |
-- |
IN-84-10 |
Motor-Operated Valve Torque Switches Set Below The Manufacturer's Recommended Value |
-- |
02/21/1984 |
-- |
IN-84-09 |
Lessons Learned From NRC Inspections of Fire Protection Safe Shutdown Systems (10 CFR 50, Appendix R) |
1 |
03/07/1984 |
-- |
-- |
02/13/1984 |
-- |
IN-84-08 |
Employee Protection |
-- |
02/14/1984 |
-- |
IN-84-07 |
Design-Basis Threat and Review of Vehicular Access Controls |
-- |
01/03/1984 |
-- |
IN-84-06 |
Steam Binding of Auxiliary Feedwater Pumps |
-- |
01/25/1984 |
-- |
IN-84-05 |
Exercise Frequency |
1 |
03/28/1984 |
-- |
-- |
01/16/1984 |
-- |
IN-84-04 |
Failure of Elastomer Seated Butterfly Valves Used Only During Cold Shutdowns |
-- |
01/18/1984 |
-- |
IN-84-03 |
Compliance with Conditions of License and Notification of Disability by Licensed Operators |
-- |
01/18/1984 |
-- |
IN-84-02 |
Operating a Nuclear Power Plant at Voltage Levels Lower Than Analyzed |
-- |
01/10/1984 |
-- |
IN-84-01 |
Excess Lubricant in Electric Cable Sheaths |
-- |
01/10/1984 |
-- |