The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Information Notices - 1985

Document Number Title Revision Publish Date Reviewed Date
IN-85-101 Applicability of 10 CFR 21 to Consulting Firms Providing Training -- 12/31/1985 --
IN-85-100 Rosemount Differential Pressure Transmitter Zero Point Shift -- 12/31/1985 --
IN-85-99 Cracking in Boiling-Water-Reactor Mark I and Mark II Containments Caused by Failure of the Inerting System -- 12/31/1985 --
IN-85-98 Missing Jumpers from Westinghouse Reactor Protection System Cards for the Over-Power Delta Temperature Trip Function -- 12/26/1985 --
IN-85-97 Jail Term for Former Contractor Employee Who Intentionally Falsified Welding Inspection Records -- 12/26/1985 --
IN-85-96 Temporary Strainers Left Installed in Pump Suction Piping -- 12/23/1985 --
IN-85-95 Leak of Reactor Water to Reactor Building Caused by Scram Solenoid Valve Problem -- 12/23/1985 --
IN-85-94 Potential for Loss of Minimum Flow Paths Leading to ECCS Pump Damage During a LOCA -- 12/13/1985 --
IN-85-93 Westinghouse Type DS Circuit Breakers, Potential Failure of Electric Closing ... Because of Broken Spring Release Latch Lever -- 12/06/1985 --
IN-85-92 Surveys of Wastes Before Disposal from Nuclear Reactor Facilities -- 12/02/1985 --
IN-85-91 Load Sequencers for Emergency Diesel Generators -- 11/27/1985 --
IN-85-90 Use of Sealing Compounds in an Operating System -- 11/19/1985 --
IN-85-89 Potential Loss of Solid-State Instrumentation Following Failure of Control Room Cooling -- 11/19/1985 --
IN-85-88 Licensee Control of Contracted Services Providing Training -- 11/18/1985 --
IN-85-87 Hazards of Inerting Atmospheres -- 11/18/1985 --
IN-85-86 Lightning Strikes at Nuclear Power Generating Stations -- 11/05/1985 --
IN-85-85 Systems Interaction Event Resulting in Reactor System Safety Relief Valve Opening Following a Fire-Protection Deluge ... -- 10/31/1985 --
IN-85-84 Inadequate Inservice Testing of Main Steam Isolation Valves -- 10/30/1985 --
IN-85-83 Potential Failures of General Electric PK-2 Test Blocks -- 10/30/1985 --
IN-85-82 Diesel Generator Differential Protection Relay Not Seismically Qualified -- 10/18/1985 --
IN-85-81 Problems Resulting in Erroneously High Reading with Panasonic 800 Series Thermoluminscent Dosimeters -- 10/17/1985 --
IN-85-80 Timely Declaration of an Emergency Class, Implementation of an Emergency Plan, and Emergency Notifications -- 10/15/1985 --
IN-85-79 Inadequate Communications Between Maintenance, Operations, and Security Personnel -- 09/30/1985 --
IN-85-78 Event Notification -- 09/23/1985 --
IN-85-77 Possible Loss of Emergency Notification System Due to Loss of AC Power -- 09/20/1985 --
IN-85-76 Recent Water Hammer Events -- 09/19/1985 --
IN-85-75 Improperly Installed Instrumentation, Inadequate Quality Control and Inadequate Postmodification Testing -- 08/30/1985 --
IN-85-74 Station Battery Problems -- 08/29/1985 --
IN-85-73 Emergency Diesel Generator Control Circuit Logic Design Error -- 08/23/1985 --
IN-85-72 Uncontrolled Leakage of Reactor Coolant Outside Containment -- 08/22/1985 --
IN-85-71 Containment Integrated Leak Rate Tests -- 08/22/1985 --
IN-85-70 Teletherapy Unit Full Calibration and Qualified Expert Requirements (10 CFR 35.23 and 10 CFR 35.24) -- 08/15/1985 --
IN-85-69 Recent Felony Conviction for Cheating on Reactor Operator Requalification Tests -- 08/15/1985 --
IN-85-68 Diesel Generator Failure at Calvert Cliffs Nuclear Station Unit 1 -- 08/14/1985 --
IN-85-67 Valve-Shaft-to-Actuator Key May Fall out of Place when Mounted Below Horizontal Axis -- 08/08/1985 --
IN-85-66 Discrepancies Between As-Built Construction Drawings and Equipment Installations -- 08/07/1985 --
IN-85-65 Crack Growth in Steam Generator Girth Welds -- 07/31/1985 --
IN-85-64 BBC Brown Boveri Low-Voltage K-Line Circuit Breakers, with Deficient Overcurrent Trip Devices Models OD-4 and 5 -- 07/26/1985 --
IN-85-63 Potential for Common-Mode Failure of Standby Gas Treatment System on Loss of Off-Site Power -- 07/25/1985 --
IN-85-62 Backup Telephone Numbers to the NRC Operations Center -- 07/23/1989 --
IN-85-61 Misadministration to Patients Undergoing Thyroid Scans S1 04/15/1987 --
-- 07/22/1985 --
IN-85-60 Defective Negative-Pressure, Air-Purifying, Full Facepiece Respirators -- 07/17/1985 --
IN-85-59 Valve Stem Corrosion Failures -- 07/17/1985 --
IN-85-58 Failure of a General Electric Type AK-2-25 Reactor Trip Breaker S1 11/19/1985 --
-- 07/17/1985 --
IN-85-57 Lost Iridium-192 Source Resulting in the Death of Eight Persons in Morocco -- 07/16/1985 --
IN-85-56 Inadequate Environment Control for Components and Systems in Extended Storage or Layup -- 07/15/1985 --
IN-85-55 Revised Emergency Exercise Frequency Rule -- 07/15/1985 --
IN-85-54 Teletherapy Unit Malfunction -- 07/15/1985 --
IN-85-53 Performance of NRC-Licensed Individuals While on Duty -- 07/12/1985 --
IN-85-52 Errors in Dose Assessment Computer Codes and Reporting Requirements Under 10 CFR Part 21 -- 07/10/1985 --
IN-85-51 Inadvertent Loss or Improper Actuation of Safety-Related Equipment -- 07/10/1985 --
IN-85-50 Complete Loss of Main and Auxiliary Feedwater at a PWR Designed by Babcock & Wilcox -- 07/08/1985 --
IN-85-49 Relay Calibration Problem -- 07/01/1985 --
IN-85-48 Respirator Users Notice: Defective Self-Contained Breathing Apparatus Air Cylinders -- 06/19/1985 --
IN-85-47 Potential Effect of Line-Induced Vibration on Certain Target Rock Solenoid-Operated Valves -- 06/18/1985 --
IN-85-46 Clarification of Several Aspects of Removable Radioactive Surface Contamination Limits for Transport Packages -- 06/10/1985 --
IN-85-45 Potential Seismic Interaction Involving the Movable In-Core Flux Mapping System Used in Westinghouse Designed Plants -- 06/06/1995 --
IN-85-44 Emergency Communication System Monthly Test -- 05/30/1985 --
IN-85-43 Radiography Events at Power Reactors -- 05/30/1985 --
IN-85-42 Loose Phosphor in Panasonic 800 Series Badge Thermoluminescent Dosimeter (TLD) Elements 1 08/12/1985 --
-- 05/29/1985 --
IN-85-41 Scheduling of Pre-Licensing Emergency Preparedness Exercises -- 05/24/1989 --
IN-85-40 Deficiencies in Equipment Qualification Testing and Certification Process -- 05/22/1985 --
IN-85-39 Auditability of Electrical Equipment Qualification Records at Licensees' Facilities -- 05/22/1985 --
IN-85-38 Loose Parts Obstruct Control Rod Drive Mechanism -- 05/21/1985 --
IN-85-37 Chemical Cleaning of Steam Generators at Millstone 2 -- 05/14/1985 --
IN-85-36 Malfunction of a Dry-Storage, Panoramic, Gamma Exposure Irradiator -- 05/09/1985 --
IN-85-35 Failure of Air Check Valves to Seat S1 05/17/1988 --
-- 04/30/1985 --
IN-85-34 Heat Tracing Contributes to Corrosion Failure of Stainless Steel Piping -- 04/30/1985 --
IN-85-33 Undersized Nozzle-to-Shell Welded Joints in Tanks and Heat Exchangers Constructed Under the Rules of the ASME Boiler and Pressure Vessel Code -- 04/22/1985 --
IN-85-32 Recent Engine Failures of Emergency Diesel Generators -- 04/22/1985 --
IN-85-31 Buildup of Enriched Uranium in Ventilation Ducts and Associated Effluent Treatment Systems -- 04/19/1985 --
IN-85-30 Microbiologically Induced Corrosion of Containment Service Water System -- 04/19/1985 --
IN-85-29 Use of Unqualified Sources in Well Logging Applications -- 04/12/1985 --
IN-85-28 Partial Loss of AC Power and Diesel Generator Degradation -- 04/09/1985 --
IN-85-27 Notifications to the NRC Operations Center and Reporting Events in Licensee Event Reports -- 04/03/1985 --
IN-85-26 Vacuum Relief System for Boiling Water Reactor Mark I and Mark II Containments -- 04/02/1985 --
IN-85-25 Consideration of Thermal Conditions of the Design and Installation for Diesel Generator Exhaust Silencers -- 04/02/1985 --
IN-85-24 Failures of Protective Coatings in Pipes and Heat Exchangers -- 03/26/1985 --
IN-85-23 Inadequate Surveillance and Postmaintenance and Postmodification System Testing -- 03/22/1985 --
IN-85-22 Failure of Limitorque Motor-Operated Valves Resulting from Incorrect Installation of Pinion Gear -- 03/21/1985 --
IN-85-21 Main Steam Isolation Valve Closure Logic -- 03/18/1985 --
IN-85-20 Motor-Operated Valve Failures Due to Hammering Effect S1 05/14/1985 --
-- 03/12/1985 --
IN-85-19 Alleged Falsification of Certifications and Alteration of Markings on Piping, Valves, and Fittings -- 03/11/1985 --
IN-85-18 Failures of Undervoltage Output Circuit Boards in the Westinghouse-Designed Solid State Protection System S1 09/10/1991 --
-- 03/07/1985 --
IN-85-17 Possible Sticking of ASCO Solenoid Valves S1 10/01/1985 --
-- 03/01/1985 --
IN-85-16 Time/Current Trip Curve Discrepancy of ITE/Siemens-Allis Molded Case Circuit Breaker -- 02/27/1985 --
IN-85-15 Nonconforming Structural Steel for Safety-Related Use -- 02/22/1985 --
IN-85-14 Failure of Heavy Control Rod (B4C) Drive Assembly to Insert a Trip Signal -- 02/22/1985 --
IN-85-13 Consequences of Using Soluble Dams -- 02/21/1985 --
IN-85-12 Recent Fuel Handling Events -- 02/11/1985 --
IN-85-11 Licensee Programs for Inspection of Electrical Raceway and Cable Installations -- 02/11/1985 --
IN-85-10 Posttensioned Containment Tendon Anchor Head Failure S1 03/08/1985 --
-- 02/06/1985 --
IN-85-09 Isolation Transfer Switches and Post-Fire Shutdown Capability -- 01/31/1985 --
IN-85-08 Industry Experience on Certain Materials Used in Safety-Related Equipment -- 01/30/1985 --
IN-85-07 Contaminated Radiography Source Shipments -- 01/29/1985 --
IN-85-06 Contamination of Breathing Air Systems -- 01/23/1985 --
IN-85-05 Pipe Whip Restraints -- 01/23/1985 --
IN-85-04 Inadequate Management of Security Response Drills -- 01/17/1985 --
IN-85-03 Separation of Primary Reactor Coolant Pump Shaft and Impeller S1 04/09/1985 --
-- 01/15/1985 --
IN-85-02 Improper Installation and Testing of Differential Pressure Transmitters -- 01/11/1985 --
IN-85-01 Continuous Supervision of Irradiators -- 01/10/1985 --

Page Last Reviewed/Updated Wednesday, October 25, 2023