The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Information Notices - 1979

Document Number Title Revision Publish Date Reviewed Date
IN-79-37 Cracking in Low Pressure Turbine Discs -- 12/28/1979 --
IN-79-36 Computer Code Defect in Stress Analysis of Piping Elbow -- 12/31/1979 --
IN-79-35 Control of Maintenance and Essential Equipment -- 12/31/1979 --
IN-79-34 Inadequate Design of Safety-Related Heat Exchangers -- 12/27/1979 --
IN-79-33 Improper Closure of Primary Containment Access Hatches -- 12/21/1979 --
IN-79-32 Separation of Electrical Cables for HPCI and ADS -- 12/18/1979 --
IN-79-31 Use of Incorrect Amplified Response Spectra (ARS) -- 12/11/1979 --
IN-79-30 Reporting of Defects and Noncompliance, 10 CFR Part 21 -- 12/04/1979 --
IN-79-29 Loss of Nonsafety-Related Reactor Coolant System Instrumentation During Operation -- 11/16/1979 --
IN-79-28 Overloading of Structural Elements Due to Pipe Support Loads -- 11/16/1979 --
IN-79-27 Steam Generator Tube Ruptures at Two PWR Facilities -- 11/16/1979 --
IN-79-26 Breach of Containment Integrity -- 11/01/1979 --
IN-79-25 Reactor Trips at Turkey Point Units 3 and 4 -- 09/28/1979 --
IN-79-24 Overpressurization of Containment of a PWR Plant after a Main Steam Line Break -- 09/23/1979 --
IN-79-23 Emergency Diesel Generator Lube Oil Coolers -- 09/25/1979 --
IN-79-22 Qualification of Control Systems -- 09/14/1979 --
IN-79-21 Transportation and Commercial Burial of Radioactive Materials -- 09/05/1979 --
IN-79-20 NRC Enforcement Policy - NRC Licensed Individuals 1 09/01/1979 --
-- 08/10/1979 --
IN-79-19 Pipe Cracks in Stagnant Borated Water Systems at PWR Plants -- 07/17/1979 --
IN-79-18 Skylab Reentry -- 07/05/1979 --
IN-79-17 Source Holder Assembly Damage from Misfit between Assembly and Reactor Upper Grid Plate -- 06/18/1979 --
IN-79-16 Nuclear Incident at Three Mile Island -- 06/15/1979 --
IN-79-15 Deficient Procedures - -- 06/07/1979 --
IN-79-14 Safety Classification of Electrical Cable Support Systems -- 06/04/1979 --
IN-79-13 Indication of Low Water Level in the Oyster Creek Reactor -- 05/29/1979 --
IN-79-12a Attempted Damage to New Fuel Assemblies -- 11/08/1979 --
IN-79-12 Attempted Damage to New Fuel Assemblies -- 05/10/1979 --
IN-79-11 Lower Reactor Vessel Head Insulation Support Problem -- 05/04/1979 --
IN-79-10 Nonconforming Pipe Support Struts -- 04/11/1979 --
IN-79-09 Spill of Radioactively Contaminated Resin -- 03/30/1979 --
IN-79-08 Interconnection of Contaminated Systems with Service Air Systems Used as the Source of Breathing Air -- 03/28/1979 --
IN-79-07 Rupture of Radwaste Tanks -- 03/23/1979 --
IN-79-06 Stress Analysis of Safety-Related Piping -- 03/22/1979 --
IN-79-05 Use of Improper Materials in Safety-Related Components -- 03/16/1979 --
IN-79-04 Degradation of Engineered Safety Features -- 02/14/1979 --
IN-79-03 Limitorque Valve Geared Limit Switch Lubricant -- 02/06/1979 --
IN-79-02 Attempted Extortion - Low Enriched Uranium -- 02/02/1979 --
IN-79-01 Bergen-Paterson Hydraulic Shock and Sway Arrestor -- 01/31/1979 --