Information Notice No. 79-10 Nonconforming Pipe Support Struts
IN79010
April 11, 1979
MEMORANDUM FOR: B. H. Grier, Director, Region I
J. P. O'Reilly, Director, Region II
J. G. Keppler, Director, Region III
K. V. Seyfrit, Director, Region IV
R. H. Engelken, Director, Region V
FROM: Harold D. Thornburg, Director, RCI:IE
SUBJECT: Information Notice No. 79-10 NONCONFORMING PIPE
SUPPORT STRUTS
The subject Information Notice is transmitted for issuance on April 16,
1979. The Information Notice should be issued to all power reactor
facilities with a construction permit. Also enclosed is a draft copy of the
transmittal letter for this purpose.
Harold D. Thornburg, Director
Division of Reactor Construction
Inspection
Office of Inspection and Enforcement
Enclosure:
1. IE Information Notice
No. 79-10
2. Draft Transmittal Letter
CONTACT: W. Laudan, IE
49-27551
.
(Draft letter to all power reactor facilities with a construction permit)
Information Notice No. 79-10
Addressee:
This Information Notice is provided as an early notification of a possibly
significant matter. It is expected that recipients will review the
information for possible applicability to their facilities. No specific
action or response is requested at this time. If further NRC evaluations so
indicate, an IE Circular or Bulletin will be issued to recommend or request
specific licensee actions. If you have questions regarding the matter,
please contact the Director of the appropriate NRC Regional Office.
Signature
(Regional Director)
Enclosure:
Information Notice No.
No. 79-10
.
UNITED STATES
NUCLEAR REGULATORY COMMISSION
OFFICE OF INSPECTION AND ENFORCEMENT
WASHINGTON, D.C. 20555
April 16, 1979
Information Notice No. 79-10
NONCONFORMING PIPE SUPPORT STRUTS
Description of Circumstances:
Bergen-Paterson Pipesupport Corporation informed the NRC that a limited
quantity of its Part 2000 Rigid Rod Strut do not meet the published design
criteria. Subsequent plant inspection by the NRC indicated that no
nonconforming Part 2000 Rigid Rod Struts are installed in operating units.
However, the following construction sites were identified as receiving
nonconforming struts:
Summer No. 1 Unit
Shoreham
Grand Gulf No. 1 and 2 Units
Wolf Creek No. 1 Unit
Callaway No. 1 Unit
Waterford No. 3 Unit
St. Lucie No. 2 Unit
Washington Nuclear No. 2 Unit
Zimmer No. 1 Unit
The actual load rating of Part 2000 Rigid Rod Struts varies with the
material used for rods in the assembly. At various times this rod was made
from SA-36, SA-306, grade 60 and A-108 grade 1018 materials. Re-analysis
indicates that the use of A-108 grade 1018 produces a product meeting all
published criteria for all sizes; however, the use of either SA-36 or
SA-306, grade 60 materials produces an acceptable material only for sizes
1.5 and 3 but not for sizes 10 and 20.
All construction permit holders should consider conducting a review to
determine if Bergen-Paterson Pipesupport Corporation Part 2000 Rigid Rod
Struts of the sizes 10 and 20 are being used at their construction sites. If
so, determine if those in stock and installed meet the required design
criteria.
1 of 2
.
Information Notice No. 79-10 April 16, 1979
This information is provided as a notification of a possibly significant
matter. It is expected that recipients will review the information for
possible applicability to their facilities. No specific action or response
is requested at this time. If further NRC evaluations so indicate, an IE
Circular or Bulletin will be issued to recommend or request specific
licensee actions. If you have questions regarding this matter, please
contact the Director of the appropriate NRC Regional Office.
Enclosure:
List of IE Information
Notices Issued in 1979
2 of 2
Page Last Reviewed/Updated Tuesday, March 09, 2021