Information Notice No. 79-16, Nuclear Incident at Three Mile Island
IN79016
June 15, 1979
MEMORANDUM FOR: B. H. Grier, Director, Region I
J. P. O'Reilly, Director, Region II
J. G. Keppler, Director, Region III
K. V. Seyfrit, Director, Region IV
R. H. Engelken, Director, Region V
FROM: Norman C. Moseley, Director, Division of Reactor
Operations Inspection, OIE
SUBJECT: Information Notice No. 79-16, NUCLEAR INCIDENT AT THREE
MILE ISLAND
The subject document is transmitted for issuance on June 22, 1979. The
Notice should be issued to all research reactors and test reactors with
operating licenses. Also enclosed is a draft copy of the transmittal letter.
Norman C. Moseley, Director
Division of Reactor Operations
Inspection
Office of Inspection and Enforcement
Enclosures:
1. Draft Transmittal Letter
2. Information Notice No. 79-16
CONTACT: H. A. Wilber, TP
49-28180
.
(Draft transmittal letter to each research reactor and test reactor with an
operating license)
Information Notice No. 79-16
Addressee:
The enclosed Information Notice No. 79-16 is forwarded to your for
information. No specific action is requested and no written response is
required. If you desire additional information regarding this matter, please
contact this office.
Sincerely,
Signature
(Regional Director)
Enclosure:
1. Information Notice No. 79-16
2. List of IE Information Notices
Issued in 1979
.
UNITED STATES
NUCLEAR REGULATORY COMMISSION
OFFICE OF INSPECTION AND ENFORCEMENT
WASHINGTON, D.C. 20555
June 22, 1979
Information Notice No. 79-16
NUCLEAR INCIDENT AT THREE MILE ISLAND
Description of Circumstances:
On March 28, 1979, the Three Mile Island Nuclear Power Plant, Unit 2
experienced core damage which resulted from a series of events which were
initiated by a loss of feedwater transient. The seriousness of this incident
makes an understanding of its causes important to research and experimental
facilities. This notice transmits copies of Inspection and Enforcement
Bulletins (IEBs) 79-05, 79-05A and 79-05B to inform you of the details as
known at the time the bulletins were issued. Enclosures 1 and 3 of IEB 79-05
and Enclosure 2 of IEB 79-05A have been deleted from this transmittal. IEB's
similar to the 79-05 series were issued to licensees with boiling water
reactors and pressurized water reactors supplied by vendors other than
Babcock and Wilcox.
No specific action or written response to this Information Notice is
required. If you desire additional information regarding this matter,
contact the Director of the appropriate NRC Regional Office.
Enclosures:
1. IE Bulletin No. 79-05
with Enclosures
2. IE Bulletin No, 79-05A
with Enclosures
3. IE Bulletin No. 79-05B
Page Last Reviewed/Updated Tuesday, March 09, 2021