Document Number |
Title |
Revision |
Publish Date |
Reviewed Date |
IN-08-22 |
Molybdenum-90 Breakthrough in Molybdenum-99/Technetium-99M Generators |
-- |
01/12/2009 |
-- |
IN-08-21 |
Impact Of Non-Safety Electrical Support System Vulnerabilities On Safety Systems |
-- |
11/24/2008 |
-- |
IN-08-20 |
Failures of Motor Operated Valve Actuator Motors with Magnesium Alloy Rotors |
-- |
12/08/2008 |
-- |
IN-08-19 |
Tamper-Indicating Device Issues |
-- |
12/16/2008 |
-- |
IN-08-18 |
Loss of a Safety-Related Motor Control Center Caused by a Bus Fault |
-- |
12/01/2008 |
-- |
IN-08-17 |
Construction Experience with Concrete Placement |
-- |
10/22/2008 |
-- |
IN-08-16 |
Summary of Fitness-For-Duty Program Performance Reports for Calendar Year 2007 |
-- |
09/02/2008 |
-- |
IN-08-15 |
Emergency Response Data System Test Schedule Revised |
-- |
08/12/2008 |
-- |
IN-08-14 |
Criticality Safety-related Events Resulting from Fissile Material Operations under Procedures Not Reviewed by Criticality Safety Staff |
-- |
07/29/2008 |
-- |
IN-08-13 |
Main Feedwater System Issues and Related 2007 Reactor Trip Data |
-- |
07/30/2008 |
-- |
IN-08-12 |
Braidwood Unit 1 Reactor Trip Due to Off-Site Power Fluctuation |
-- |
07/07/2008 |
-- |
IN-08-11 |
Service Water System Degradation at Brunswick Steam Electric Plant Unit 1 |
-- |
06/18/2008 |
-- |
IN-08-10 |
Response to Indications of Potential Tampering, Vandalism, or Malicious Mischief |
-- |
05/01/2008 |
-- |
IN-08-09 |
Turbine-driven Auxiliary Feedwater Pump Bearing Issues |
W |
Superseded by RIS 2002-12B, Rev. 1 |
02/17 |
-- |
05/22/2008 |
-- |
IN-08-08 |
Maintenance Procedures Compromise Double-Contingency of UO2 Powder-Handling Equipment at Fuel Cycle Facility |
-- |
04/16/2008 |
-- |
IN-08-07 |
Cracking Indications in Thermally Treated Alloy 600 Steam Generator Tubes |
-- |
04/24/2008 |
-- |
IN-08-06 |
Instrument Air System Failure Resulting in Manual Reactor Trip |
-- |
04/10/2008 |
-- |
IN-08-05 |
Fires Involving Emergency Diesel Generator Exhaust Manifolds |
-- |
04/10/2008 |
-- |
IN-08-04 |
Counterfeit Parts Supplied to Nuclear Power Plants |
-- |
04/07/2008 |
-- |
IN-08-03 |
Precautions to take before Sharing Sensitive Security-Related Information |
-- |
05/16/2008 |
-- |
IN-08-02 |
Findings Identified During Component Design Bases Inspections |
-- |
03/19/2008 |
-- |
IN-08-01 |
Designation and Protection Of Safeguards Information |
-- |
01/03/2008 |
-- |