Information Notices - 2008

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Document Number Title Revision Publish Date Reviewed Date
IN-08-22 Molybdenum-90 Breakthrough in Molybdenum-99/Technetium-99M Generators -- 01/12/2009 --
IN-08-21 Impact Of Non-Safety Electrical Support System Vulnerabilities On Safety Systems -- 11/24/2008 --
IN-08-20 Failures of Motor Operated Valve Actuator Motors with Magnesium Alloy Rotors -- 12/08/2008 --
IN-08-19 Tamper-Indicating Device Issues -- 12/16/2008 --
IN-08-18 Loss of a Safety-Related Motor Control Center Caused by a Bus Fault -- 12/01/2008 --
IN-08-17 Construction Experience with Concrete Placement -- 10/22/2008 --
IN-08-16 Summary of Fitness-For-Duty Program Performance Reports for Calendar Year 2007 -- 09/02/2008 --
IN-08-15 Emergency Response Data System Test Schedule Revised -- 08/12/2008 --
IN-08-14 Criticality Safety-related Events Resulting from Fissile Material Operations under Procedures Not Reviewed by Criticality Safety Staff -- 07/29/2008 --
IN-08-13 Main Feedwater System Issues and Related 2007 Reactor Trip Data -- 07/30/2008 --
IN-08-12 Braidwood Unit 1 Reactor Trip Due to Off-Site Power Fluctuation -- 07/07/2008 --
IN-08-11 Service Water System Degradation at Brunswick Steam Electric Plant Unit 1 -- 06/18/2008 --
IN-08-10 Response to Indications of Potential Tampering, Vandalism, or Malicious Mischief -- 05/01/2008 --
IN-08-09 Turbine-driven Auxiliary Feedwater Pump Bearing Issues W Superseded by RIS 2002-12B, Rev. 1 02/17
-- 05/22/2008 --
IN-08-08 Maintenance Procedures Compromise Double-Contingency of UO2 Powder-Handling Equipment at Fuel Cycle Facility -- 04/16/2008 --
IN-08-07 Cracking Indications in Thermally Treated Alloy 600 Steam Generator Tubes -- 04/24/2008 --
IN-08-06 Instrument Air System Failure Resulting in Manual Reactor Trip -- 04/10/2008 --
IN-08-05 Fires Involving Emergency Diesel Generator Exhaust Manifolds -- 04/10/2008 --
IN-08-04 Counterfeit Parts Supplied to Nuclear Power Plants -- 04/07/2008 --
IN-08-03 Precautions to take before Sharing Sensitive Security-Related Information -- 05/16/2008 --
IN-08-02 Findings Identified During Component Design Bases Inspections -- 03/19/2008 --
IN-08-01 Designation and Protection Of Safeguards Information -- 01/03/2008 --

To top of page

Page Last Reviewed/Updated Tuesday, March 9, 2021