The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Information Notices - 2008

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Document Number Title Revision Publish Date Reviewed Date
IN-08-22 Molybdenum-90 Breakthrough in Molybdenum-99/Technetium-99M Generators -- 01/12/2009 --
IN-08-21 Impact Of Non-Safety Electrical Support System Vulnerabilities On Safety Systems -- 11/24/2008 --
IN-08-20 Failures of Motor Operated Valve Actuator Motors with Magnesium Alloy Rotors -- 12/08/2008 --
IN-08-19 Tamper-Indicating Device Issues -- 12/16/2008 --
IN-08-18 Loss of a Safety-Related Motor Control Center Caused by a Bus Fault -- 12/01/2008 --
IN-08-17 Construction Experience with Concrete Placement -- 10/22/2008 --
IN-08-16 Summary of Fitness-For-Duty Program Performance Reports for Calendar Year 2007 -- 09/02/2008 --
IN-08-15 Emergency Response Data System Test Schedule Revised -- 08/12/2008 --
IN-08-14 Criticality Safety-related Events Resulting from Fissile Material Operations under Procedures Not Reviewed by Criticality Safety Staff -- 07/29/2008 --
IN-08-13 Main Feedwater System Issues and Related 2007 Reactor Trip Data -- 07/30/2008 --
IN-08-12 Braidwood Unit 1 Reactor Trip Due to Off-Site Power Fluctuation -- 07/07/2008 --
IN-08-11 Service Water System Degradation at Brunswick Steam Electric Plant Unit 1 -- 06/18/2008 --
IN-08-10 Response to Indications of Potential Tampering, Vandalism, or Malicious Mischief -- 05/01/2008 --
IN-08-09 Turbine-driven Auxiliary Feedwater Pump Bearing Issues W Superseded by RIS 2002-12B, Rev. 1 02/17
-- 05/22/2008 --
IN-08-08 Maintenance Procedures Compromise Double-Contingency of UO2 Powder-Handling Equipment at Fuel Cycle Facility -- 04/16/2008 --
IN-08-07 Cracking Indications in Thermally Treated Alloy 600 Steam Generator Tubes -- 04/24/2008 --
IN-08-06 Instrument Air System Failure Resulting in Manual Reactor Trip -- 04/10/2008 --
IN-08-05 Fires Involving Emergency Diesel Generator Exhaust Manifolds -- 04/10/2008 --
IN-08-04 Counterfeit Parts Supplied to Nuclear Power Plants -- 04/07/2008 --
IN-08-03 Precautions to take before Sharing Sensitive Security-Related Information -- 05/16/2008 --
IN-08-02 Findings Identified During Component Design Bases Inspections -- 03/19/2008 --
IN-08-01 Designation and Protection Of Safeguards Information -- 01/03/2008 --