Document Number |
Title |
Revision |
Publish Date |
Reviewed Date |
GL-79-70 |
Environmental Monitoring for Direct Radiation |
-- |
12/21/1979 |
-- |
GL-79-69 |
Cladding Rupture, Swelling, and Coolant Blockage as a Result of a Reactor Accident |
-- |
12/20/1970 |
-- |
GL-79-68 |
Audit of Small Break LOCA Guidelines |
-- |
12/17/1979 |
-- |
GL-79-67 |
Estimates for Evacuation of Various Areas Around Nuclear Power Reactors |
-- |
11/29/1979 |
-- |
GL-79-66 |
Additional Information Re 11/09/79 Letter on ECCS Calculations |
-- |
11/27/1979 |
-- |
GL-79-65 |
Radiological Environmental Monitoring Program Requirements – Enclosing Branch Technical Position, Revision 1 |
-- |
11/27/1979 |
-- |
GL-79-64 |
Suspension of All Operating Licenses |
-- |
11/23/1979 |
-- |
GL-79-63 |
Upgraded Emergency Plans |
-- |
11/21/1979 |
-- |
GL-79-62 |
Duplicate of GL-79-58 |
-- |
-- |
-- |
GL-79-61 |
Discussion of Lessons Learned Short Term Requirements |
-- |
11/09/1979 |
-- |
GL-79-60 |
Discussion of Lessons Learned Short Term Requirements |
-- |
11/09/1979 |
-- |
GL-79-58 |
ECCS Calculations on Fuel Cladding |
-- |
Date Unknown |
-- |
GL-79-57 |
Acceptance Criteria for the Mark I Containment Long Term Program |
-- |
Date Unknown |
-- |
GL-79-56 |
Discussion of Lessons Learned Short Term Requirements |
-- |
10/30/1979 |
-- |
GL-79-55 |
Summary of Meeting Held on October 12, 1979 to Discuss Responses to IE Bulletins 79-05C and 79-06C and HPI Termination Criteria |
-- |
Date Unknown |
-- |
GL-79-54 |
Containment Purging and Venting During Normal Operation |
-- |
Date Unknown |
-- |
GL-79-53 |
ATWS |
-- |
Date Unknown |
-- |
GL-79-52 |
Radioactive Release at North Anna Unit 1 and Lessons Learned |
-- |
Date Unknown |
-- |
GL-79-51 |
Follow-up Actions Resulting from the NRC Staff Reviews Regarding the TMI-2 Accident |
-- |
10/10/1979 |
-- |
GL-79-50 |
Emergency Plans Submittal Dates |
-- |
Date Unknown |
-- |
GL-79-49 |
Summary of Meetings Held on 9/18-20/79 to Discuss Potential Unreviewed Safety Question on Systems Interaction for B&W Pl |
-- |
10/05/1979 |
-- |
GL-79-48 |
Confirmatory Requirements Relating to Condensation Oscillation Loads for the Mark I Containment Long Term Program |
-- |
10/02/1979 |
-- |
GL-79-47 |
Radiation Training |
-- |
10/02/1979 |
-- |
GL-79-46 |
Containment Purging and Venting During Normal Operation – Guidelines for Valve Operability |
-- |
09/27/1979 |
-- |
GL-79-45 |
Transmittal of Reports Regarding Foreign Reactor Operating Experiences |
-- |
09/25/1979 |
-- |
GL-79-44 |
Referencing 6/29/79 Letter Re Multiple Equipment Failures |
-- |
09/21/1979 |
-- |
GL-79-43 |
Reactor Cavity Seal Ring Generic Issue |
-- |
Date Unknown |
-- |
GL-79-42 |
Potential Unreviewed Question on Interaction Between Non-Safety Grade Systems and Safety Grade Systems |
-- |
09/17/1979 |
-- |
GL-79-41 |
Compliance with 40 CFR 190, EPA Uranium Fuel Cycle Standard |
-- |
09/17/1979 |
-- |
GL-79-40 |
Follow-up Actions Resulting from the NRC Staff Reviews Regarding the TMI-2 Accident |
-- |
09/13/1979 |
-- |
GL-79-39 |
Transmitting Division 5 Draft Regulatory Guide and Value Impact Statement |
-- |
08/22/1979 |
-- |
GL-79-38 |
BWR Off-Gas Systems – Enclosing NUREG/CR-0727 |
-- |
08/22/1979 |
-- |
GL-79-37 |
Amendment to 10 CFR 73.55 Deferral from 8/1/79 to 11/1/79 |
-- |
08/10/1973 |
-- |
GL-79-36 |
Adequacy of Station Electric Distribution Systems Voltages |
-- |
08/08/1979 |
-- |
GL-79-35 |
Regional Meetings to Discuss Impacts on Emergency Planning |
-- |
08/03/1979 |
-- |
GL-79-34 |
New Physical Security Plans (FR 43280-285) |
-- |
07/30/1979 |
-- |
GL-79-33 |
Transmitting NUREG-0576 - Security Training and Qualification Plans |
-- |
07/30/1979 |
-- |
GL-79-32 |
Transmitting NUREG-0578, "TMI-2 Lessons Learned" |
-- |
Date Unknown |
-- |
GL-79-31 |
Submittal of Copies of Response to 6/29/79 NRC Request |
-- |
Date Unknown |
-- |
GL-79-30 |
Transmitting NUREG-0472, Revision 2, Draft Radiological Technical Specifications |
-- |
07/18/1979 |
-- |
GL-79-29 |
Transmitting NUREG-0473, Revision 2, Draft Radiological Effluent Technical Specifications |
-- |
07/18/1979 |
-- |
GL-79-28 |
Evaluation of Semi-Scale Small Break Experiment |
-- |
07/10/1979 |
-- |
GL-79-27 |
Operability Testing of Relief and Safety Relief Valves |
-- |
07/16/1979 |
-- |
GL-79-26 |
Upgraded Standard Technical Specification Bases Program |
-- |
Date Unknown |
-- |
GL-79-25 |
Information Required to Review Corporate Capabilities |
-- |
Date Unknown |
-- |
GL-79-24 |
Multiple Equipment Failures in Safety-Related Systems |
-- |
06/26/1979 |
-- |
GL-79-23 |
NRC Staff Review of Responses to I&E Bulletin 79-08 |
-- |
06/20/1979 |
-- |
GL-79-22 |
Enclosing NUREG-0560, "Staff Report on the Generic Assessment of Feedwater Transients in PWRs Designed by B&W |
-- |
06/11/1979 |
-- |
GL-79-21 |
Enclosing NUREG/CR 0660, "Enhancement of on Site Emergency Diesel Generator Reliability" |
-- |
06/04/1979 |
-- |
GL-79-20 |
Cracking in Feedwater Lines |
-- |
05/25/1979 |
-- |
GL-79-19 |
NRC Staff Review of Responses to I&E Bulletins 79-06 and 79-06a |
-- |
05/22/1979 |
-- |
GL-79-18 |
Westinghouse Two-Loop NSSS |
-- |
05/15/1979 |
-- |
GL-79-17 |
Reliability of Onsite Diesel Generators at Light Water Reactors |
-- |
04/18/1979 |
-- |
GL-79-16 |
Meeting Re Implementation Of Physical Security Requirements |
-- |
03/22/1979 |
-- |
GL-79-15 |
Steam Generators-Enclosing Summary of Operating Experience with Recirculating Steam Generators, NUREG-0523 |
-- |
03/21/1979 |
-- |
GL-79-14 |
Pipe Crack Study Group – Enclosing NUREG-0531 and Notice |
-- |
03/15/1979 |
-- |
GL-79-13 |
Schedule for Implementation and Resolution of Mark I Containment Long Term Program |
-- |
03/12/1979 |
-- |
GL-79-12 |
ATWS – Enclosing Letter to GE, with NUREG-0460, Vol. 3 |
-- |
03/12/1979 |
-- |
GL-79-11 |
Transmitting "Summary of Operating Experience with Recalculating Steam Generators, January 1979" NUREG-0523 |
-- |
Date Unknown |
-- |
GL-79-10 |
Transmitting Regulatory Guide 2.6 for Comment |
-- |
02/28/1979 |
-- |
GL-79-09 |
Staff Evaluation of Interim Multiple-Consecutive Safety-Relief Valve Actuations |
-- |
02/27/1979 |
-- |
GL-79-08 |
Amendment to 10 CFR 73.55 |
-- |
02/20/1979 |
-- |
GL-79-07 |
Seismic (SSE) and LOCA Responses (NUREG-0484) |
-- |
02/21/1979 |
-- |
GL-79-06 |
Contents of the Offsite Dose Calculation Manual |
-- |
02/14/1979 |
-- |
GL-79-05 |
Information Relating to Categorization of Recent Regulatory Guides by the Regulatory Requirements Review Committee |
-- |
01/26/1979 |
-- |
GL-79-04 |
Referencing 4/14/78 Letter – Modifications to NRC Guidance "Review and Acceptance of Spent Fuel Pool Storage and Handling" |
-- |
01/18/1979 |
-- |
GL-79-03 |
Offsite Dose Calculation Manual |
-- |
01/18/1979 |
-- |
GL-79-02 |
Transmitting Rev. to Entry Control Systems Handbook (SAND 77-1033), Intrusion Detection Handbook (SAND 76-0554), and Barrier Penetration Database |
-- |
01/09/1979 |
-- |
GL-79-01 |
Interservice Procedures for Instructional Systems Development – TRADOC |
-- |
01/09/1979 |
-- |