Transmitting "Summary of Operating Experience With Recalculating Steam Generators, January 1979" NUREG-0523 (Generic Letter 79-11)
GL79011
MEMORANDUM FOR: A. Schwencer, Chief, Operating Reactors Branch #1
Division of Operating Reactors
R. Reid, Chief, Operating Reactors Branch #2
Division of Operating Reactors
D. Ziemann, Chief, Operating Reactors Branch #2
Division of Operating Reactors
FROM: R. H. Vollmer, Assistant Director
for System and Projects
Division of Operating Reactors
B. K. Grimes, Assistant Director
for Engineering and Projects
Division of Operating Reactors
SUBJECT: LETTER TO OPERATING PWR LICENSEES FORWARDING NUREG 0523,
"SUMMARY OF OPERATING EXPERIENCE WITH RECIRCULATING
STEAM GENERATORS"
Operating problem have occurred in Pressurized Water Reactor (PWR) steam
generators. The enclosed report, "Summary of Operating Experience with
Recirculating Steam Generators," NUREG 0523, focuses on the problems
associated with steam generators of the recirculation type, i.e., those
manufactured by Combustion Engineering and Westinghouse. The report
discusses the NRC staff's evaluation of these problems and the programs for
resolving these problems.
The NRC has recently identified steam generator degradation as an Unresolved
Safety Issue deserving the highest priority for resolution. However, for the
reasons identified in the report, the NRC staff had concluded that continued
operation of existing plants and licensing of new plants with recirculation
type steam generators, pending completion of our review, does not constitute
an undue risk to the health and safety of the public and therefore may
continue.
The attached letter and NUREG document should be transmitted to PWR
licensees by March 10, 1979, using the automated mailing system. If you have
any problems with doing this either in general or for any specific plant,
please contact W. T. Russell (X27609). The cognizant Licensing Assistant for
mass mailings is Shirley Sheppard (X27872).
.
-2-
You and each ORPM will be informed that the letters have actually been
dispatched by receiving a copy of the letter and enclosures for each of it
your assigned facilities.
R. H. Vollmer, Assistant Director B. K. Grimes, Assistant Director
for Systems and Projects for Engineering and Projects
Division of Operating Reactors Division of Operating Reactors
Contact: W. Russell
49 27609
Enclosures:
Sample Letter
NUREG 0523
DISTRIBUTION:
E&P r/f
S&P r/f