The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Adequacy of Station Electric Distribution Systems Voltages (Generic Letter 79-36)



                                                            GL 79-36

                                UNITED STATES 
                        NUCLEAR REGULATORY COMMISSION 
                            WASHINGTON, D.C. 20555 

                                August 8, 1979 

TO ALL POWER REACTOR LICENSEES (Except Humboldt Bay)

RE:  ADEQUACY OF STATION ELECTRIC DISTRIBUTION SYSTEMS VOLTAGES

We are currently reviewing the licensee's submittals in response to the NRC
generic letter of 6/2/77 regarding undervoltage protection of the safety
related electric equipment from loss of capability of redundant safety loads,
their control circuitry, and associated electrical components required for
performing safety functions as a result of sustained degraded voltage from the
offsite electric grid system.  This generic action was based on the Millstone
Event which occurred on July 5, 1976.

The recent event at Arkansas Nuclear One (ANO) station on 9/16/78 brought into
question the conformance of the station electric distribution system to
GDC-17, in two separate regards.  Each of two units at the ANO station has a
dedicated startup transformer powered through a single shared autotransformer
(common source of offsite power) from the station switchyard.  Operation of an
autotransformer overcurrent relay caused the loss of the two dedicated startup
transformers.  The station electrical distribution system thus automatically
transferred the full auxiliary loads of both units to the backup startup
transformer exceeding its rated capacity and degrading the voltage level at
the safety buses.  Secondly, during our review of the electrical system at the
ANO station, the licensee's analysis indicated that the "immediate access
offsite power circuit" (dedicated startup transformer) lacked "sufficient
capacity and capability" to accommodate the simultaneous starting demands of
the emergency loads concurrent with the full house loads, in the event of a
loss of coolant accident (LOCA).  The condition would result in all safety
loads remaining on the dedicated startup transformer with unacceptably
degraded voltage.  A voltage degradation during the electrical starting
condition becomes a safety concern either if the degradation causes the
starting condition to be prolonged so as to become a sustained undervoltage or
if the voltage degradation causes frequent spurious shedding of the ESF loads
from the preferred power source, the offsite electric grid.  This event was
described in NRC's IE Information Notice No 79-04.  Additional background
information is provided in Enclosure 1.

The IE Information Notice No. 79-04 stated that NRC would follow with specific
actions to be taken by licensees.  This letter identifies those actions.


7908230155
.

-                                      2 -

Based on the ANO event, the NRC has expanded its generic review of the
adequacy of the electric power systems for all operating nuclear power
facilities.  Specifically, we must now confirm the acceptability of the
voltage conditions on the station electric distribution systems with regard to
both (1) potential overloading due to transfers of either safety or non-safety
loads, and (2) potential starting transient problems in addition to the
concerns expressed in our June 2, 1977 correspondence with regard to degraded
voltage conditions due to conditions originating on the grid.

Based on the experience at ANO, the NRC is requiring all licensees to review
the electric power systems at each of their nuclear power plants to determine
analytically if, assuming all onsite sources of AC power are not available,
the offsite power system and the onsite distribution system is of sufficient
capacity and capability to automatically start as well as operate all required
safety loads.  Within their required voltage ratings in the event of (1) an
anticipated transient (such as unit trip) or (2) an accident (such as a LOCA)
regardless of other actions the electric power system is designed to
automatically initiate and without the need for manual shedding of any
electric loads.  Protection of safety loads from undervoltage conditions must
be designed to provide the required protection without causing voltages in
excess of maximum voltage ratings of safety loads and without causing spurious
separations of safety buses from offsite power. NRC should be informed of any
required sequential loading of any portion of the offsite power system or the
onsite distribution system which is needed to assure that power provided to
all safety loads is within required voltage limits for these safety loads. 
Guidance on evaluating the performance of electric power systems with regard
to voltage drops is provided in Enclosure 2.

The adequacy of the onsite distribution of power from the offsite circuits
shall be verified by test to assure that analysis results are valid.  Please
provide: (1) a description of the method for performing this verification, and
(2) the test results.  If previous tests verify the results of the analysis,
then test results should be submitted and additional tests need not be
performed.

In addition, you are requested to review the electric power systems of your
nuclear station to determine if there are any events or conditions which could
result in the simultaneous or consequential loss of both required circuits to
the offsite network to determine if any potential exists for violation of
GDC-17 in this regard.  These reviews should be completed, and a copy of the
analyses provided to NRC within 60 days of the date of this letter.


.

-                                      3 -

In the event that any violation or potential violations of GDC-17 or voltage
requirements of safety loads are discovered remedial action should be taken
immediately.  You should provide the Commission with Prompt Notification with
Written Followup pursuant to the reporting requirements of your Technical
Specifications.

If the above required reviews have been completed by you as part of your
response to our June 2, 1977 request, NRC should be informed within 30 days of
the date of this letter.  Approved by GOA, B-180225 (R0072), clearance expires
7/31/80.  Approval was given under a blanket clearance specifically for
identified generic problems.


                                  Sincerely,



                                  William Gammill, Acting Assistant Director
                                    for Operating Reactors Projects
                                  Division of Operating Reactors

Enclosures:
1. Background Information on ANO Event
2. Guidelines for Voltage Drop Calculations

cc: Service List


.

                                                          ENCLOSURE 1

                     BACKGROUND INFORMATION ON ANO EVENT

The event that occurred at the Arkansas Nuclear One Station on September 16,
1978, brought into question the conformance of the station electric
distribution system design to GDC-17 with regard to the capacity and the
capability of the onsite systems.

Each of two units at the ANO station has a dedicated startup transformer
connected to a single shared autotransformer (common source of offsite power)
from the station switchyard.  The incident was initiated by Unit 1 reactor
trip concurrent with trip of the unit's turbine-generator.  The Unit 1
auxiliary loads were automatically transferred to Startup Transformer 1.  The
power being supplied to Startup Transformer 3 (Unit 2 dedicated startup
transformer), which was feeding Unit 2, and being supplied to Startup
Transformer 1 resulted in operation of an autotransformer overcurrent relay
and consequent tripping of the incoming circuit breaker of the
autotransformer.  The autotransformer has a capacity to provide power for both
units, but due to an error, the overcurrent relay was still set for the
operation of Unit 1 only.  Loss of input power to the two Startup transformers
automatically transferred the auxiliary loads for both Units to the backup
Startup Transformer, ST 2.  However this transformer is designed as an
alternate supply for one unit and is not designed to carry full auxiliary
loads for both units.  This overload caused a voltage degradation at the
safety buses.  The event to this point demonstrated that the design of the
offsite power system to the ANO station Units 1 and 2 did not fully meet
GDC-17.  In the circumstances experienced at ANO the failure of one of the two
offsite electric power circuits resulted in the failure of the other electric
power circuit.  GDC-17 requires, in part, that (1) electric power from the
transmission network to the onsite distribution system shall be supplied by
two physically independent circuits (not necessarily on separate rights of
way) designed and located so as to minimize to the probability of losing
electric power from any of the remaining supplies as a result of, or
coincident with, the loss of power generated by the nuclear unit, or the loss
of power generated by the nuclear unit, or the loss of power from the 
transmission network.  The ANO did not fully meet these requirements.

Initially, the sequence of events on September 16, 1978 did not indicate any
problem with the electrical distribution system of Unit 1.  However,
subsequent analysis by the licensee indicated that in the event of a LOCA at
Unit 1 during which time Startup Transformer No 1 would be required to provide
power to both the non-safety auxiliary electrical

.

-                                      2 -

loads and start the safety loads a voltage degradation would result.  The
safety loads might not transfer to the Unit 1 diesel-generators but could
remain on the startup transformer with unacceptably degraded voltage. Although
there is margin in the thermal capability of equipment such a situation could
result in thermal damage in the safety equipment and/or blown fuses in control
circuits for these safety loads.  Either event could result in disabling these
loads during a LOCA.  GDC-17 requires, in part, that electric power supplies
for nuclear power plants provide sufficient capacity and capability to assure
that certain limits are not exceeded in the event of anticipated operational
occurrences and that the core is cooled and containment integrity and other
vital functions are maintained in the event of postulated failures.  The ANO
design was not capable of providing the electric power of "sufficient capacity
and capability."

.

                                                          Enclosure 2

                   GUIDELINES FOR VOLTAGE DROP CALCULATIONS

1.   Separate analyses should be performed assuming the power source to safety
buses is (a) the unit auxiliary transformer; (b) the startup transformer; and
(c) other available connections to the offsite network one by one assuming the
need for electric power is initiated by (1) an anticipated transient (e.g.,
unit trip) or (2) an accident, whichever presents the largest load demand
situation.

2.   For multi-unit stations a separate analysis should be performed for each
unit assuming (1) an accident in the unit being analyzed and simultaneous
shutdown of all other units at the station; or (2) an anticipated transient in
the unit being analyzed (e.g., unit trip) and simultaneous shutdown of all
other units at that station, whichever presents the largest load situation.

3.   All actions the electric power system is designed to automatically
initiate should be assumed to occur as designed (e.g., automatic bulk or
sequential loading or automatic transfers of bulk loads from one transformer
to another).  Included should be consideration of starting of large non-safety
loads (e.g., condensate pumps).

4.   Manual load shedding should not be assumed.

5.   For each event analyzed, the maximum load necessitated by the event and
the mode of operation of the plant at the time of the event should be assumed
in addition to all loads caused by expected automatic actions and manual
actions permitted by administrative procedures.

6.   The voltage at the terminals of each safety load should be calculated
based on the above listed consideration and assumptions and based on the
assumption that the grid voltage is at the "minimum expected value".  The
"minimum expected value" should be selected based on the least of the
following:

     a.   The minimum steady-state voltage experience at the connection to the
          offsite circuit.

     b.   The minimum voltage expected at the connection to the offsite
          circuit due to contingency plans which may result in reduced voltage
          from this grid.

     c.   The minimum predicted voltage from grid stability analysis. (e.g.,
          load flow studies).

     In the report to NRC on this matter the licensee should state planned
actions, including any proposed "Limiting  Conditions for Operation" for
Technical Specifications, in response to experiencing voltage at the
connection to the offsite circuit which is less than the "minimum expected
value."  A copy of the plant procedure in this regard should be provided.
.

-                                      2 -

7.   The voltage analysis should include documentation for each condition
analyzed, of the voltage at the input and output of each transformer and at
each intermediate bus between the connection of the offsite circuit and the
terminals of each safety load.

8.   The analysis should document the voltage setpoint and any inherent or
adjustable (with nominal setting) time delay for relays which (1) initiate or
execute automatic transfer of loads form one source to another; (2) initiate
or execute automatic load shedding; or (3) initiate or execute automatic load
sequencing.

9.   The calculation voltages at the terminals of each safety load should be
compared with the required voltage range for normal operation and starting of
that load. Any identified inadequacies of calculated voltage require immediate
remedial action and notification of NRC.

10.   For each case evaluated the calculated voltages on each safety bus
should be compared with the voltage-time settings for the under voltage relays
on these safety buses.  Any identified inadequacies in undervoltage relay
settings require immediate remedial action and notification of NRC.

11.   To provide assurance that actions taken to assure adequate voltage
levels for safety loads don not result in excessive voltage, assuming the
maximum expected value of voltage at the connection to the offsite circuit, a
determination should be made of the maximum voltage expected at the terminals
of each safety load and its starting circuit.  If this voltage exceeds the
maximum voltage rating of any item of safety equipment immediate remedial
action is required and NRC shall be notified.

12.   Voltage-time settings for undervoltage relays shall be selected so as to
avoid spurious separation of safety buses from offsite power during plant
startup, normal operation and shutdown due to startup and/or operation of
electric loads.

13.   Analysis documentation should include a statement of the assumptions for
each case analyzed.


 