Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Generic Letters - 1995

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Document Number Title Revision Publish Date Reviewed Date
GL-95-10 Relocation of Selected Technical Specifications Requirements Related to Instrumentation -- 12/15/1995 --
GL-95-09 Monitoring and Training of Shippers and Carriers of Radioactive Materials S1 04/05/1996 --
-- 11/03/1995 --
GL-95-08 10 CFR 50.54(p) Process for Changes to Security Plans Without Prior NRC Approval W 82 FR 27085
06/13/2017
05/2017
1 04/16/2014 --
W 10/31/1995 05/17
GL-95-07 Pressure Locking and Thermal Binding of Safety- Related Power-Operated Gate Valves -- 08/17/1995 --
GL-95-06 Changes in the Operator Licensing Program S1 01/31/1997 --
-- 08/15/1995 --
GL-95-05 Voltage-Based Repair Criteria for Westinghouse Steam Generator Tubes Affected by Outside Diameter Stress Corrosion Cracking -- 08/03/1995 --
GL-95-04 Final Disposition of the Systematic Evaluation Program Lessons-Learned Issues -- 04/28/1995 --
GL-95-03 Circumferential Cracking of Steam Generator Tubes -- 04/28/1995 --
GL-95-02 Use of Numarc/epri Report TR-102348, "Guideline on Licensing Digital Upgrades," in Determining the Acceptability of Performing Analog-to-Digital Replacements under 10 CFR 50.59 -- 04/26/1995 --
GL-95-01 NRC Staff Technical Position on Fire Protection for Fuel Cycle Facilities -- 01/26/1995 --

Page Last Reviewed/Updated Tuesday, March 09, 2021

Page Last Reviewed/Updated Tuesday, March 09, 2021