Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Generic Letters - 1981

Document Number Title Revision Publish Date Reviewed Date
GL-81-40 Qualifications of Reactor Operators -- 12/16/1981 --
GL-81-39 NRC Volume Reduction Policy -- 11/30/1981 --
GL-81-38 Storage of Low Level Radioactive Wastes at Power Reactor Sites -- 11/10/1981 --
GL-81-37 ODYN Code Reanalysis Requirements -- 12/29/1981 --
GL-81-36 Revised Schedule for Completion of TMI Action Plan Item II.D.1, Relief and Safety Valve Testing -- 09/29/1981 --
GL-81-35 Safety Concerns Associated with Pipe Breaks in the BWR Scram System -- 08/31/1981 --
GL-81-34 Safety Concerns Associated with Pipe Breaks in the BWR Scram System -- 08/31/1981 --
GL-81-33 Technical Specification for Station Batteries Multiplant Action -- Not Issued --
GL-81-32 NUREG-0737, Item II.K.3.44-Evaluation of Anticipated Transients Combined with Single Failure -- 08/07/1981 --
GL-81-31 Small Break LOCA Confirmatory Integral Systems Experiments for B&W DesignedPlants -- Not Issued --
GL-81-30 Safety Concerns Associated with Pipe Breaks in the BWR Scram System -- 07/31/1981 --
GL-81-29 Simulator Examinations -- 08/07/1981 --
GL-81-28 Steam Generator Overfill -- 07/31/1981 --
GL-81-27 Privacy and Proprietary Material in Emergency Plans -- 07/09/1981 --
GL-81-26 Licensing Requirements for Pending Construction Permit and Manufacturing License Applications -- 07/14/1981 --
GL-81-25 Change in Implementing Schedule for Submission and Evaluation of Upgraded Emergency Plans -- 06/15/1981 --
GL-81-24 Multi-Plant Issue B-56 Control Rods Fail to Fully Insert -- 06/15/1981 --
GL-81-23 INPO Plant Specific Evaluation Reports S1 07/06/1981 --
-- 06/04/1981 --
GL-81-22 Engineering Evaluation of the H.B. Robinson Reactor Coolant System Leak on 1/29/81 -- 05/05/1981 --
GL-81-21 Natural Circulation Cooldown -- 05/05/1981 --
GL-81-20 Safety Concerns Associated with Pipe Breaks in the BWR Scram System -- 04/10/1981 --
GL-81-19 Thermal Shock to Reactor Pressure Vessels -- 04/20/1981 --
GL-81-18 BWR Scram Discharge System-Clarification of Diverse Instrumentation Requirements -- 03/30/1981 --
GL-81-17 Functional Criteria for Emergency Response Facilities -- 03/05/1981 --
GL-81-16 NUREG-0737 Item I.C.1 SER on Abnormal Transient Operating Guidelines (ATOG) -- 06/01/1981 --
GL-81-15 Environmental Qualification of Class 1E Electrical Equipment-Clarification of Staffs Handling of Proprietary Information -- 03/10/1981 --
GL-81-14 Seismic Qualifications for Auxiliary Feedwater Systems -- 02/10/1981 --
GL-81-13 SER for GEXL Correlation for 8X8R Fuel Reload Applications for Appendix D Submittals of the GE Topical Report -- 05/28/1981 --
GL-81-12 Fire Protection Rule (45 FR 76602, 11/19/80) -- 02/20/1981 --
GL-81-11 BWR Feedwater Nozzle and Control Rod Drive Return Line Nozzle Cracking (NUREG-0619) -- 02/29/1981 --
GL-81-10 Post-TMI Requirements for the Emergency Operations Facility -- 02/18/1981 --
GL-81-09 BWR Scram Discharge System -- 01/23/1981 --
GL-81-08 Odyn Code -- 01/29/1981 --
GL-81-07 Control of Heavy Loads -- 02/03/1981 --
GL-81-06 Periodic Updating of Final Safety Analysis Reports (FSARS) -- 02/26/1981 --
GL-81-05 Information Regarding the Program for Environmental Qualification Of Safety-Related Electrical Equipment -- 01/19/1981 --
GL-81-04 Emergency Procedures And Training for Station Blackout Events -- 02/25/1981 --
GL-81-03 Implementation of NUREG-0313,Technical Report on Material Selection & Processing GL for BWR Coolant Press Boundary Piping -- 02/26/1981 --
GL-81-02 Analysis, Conclusions and Recommendations Concerning Operator Licensing -- 01/27/1981 --
GL-81-01 Qualification of Inspection, Examination, Testing and Audit Personnel -- 05/04/1981 --

Page Last Reviewed/Updated Tuesday, March 09, 2021

Page Last Reviewed/Updated Tuesday, March 09, 2021