Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Generic Letters - 1985

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Document Number Title Revision Publish Date Reviewed Date
GL-85-22 Potential for Loss of Post-LOCA Recirculation Capability Due to Insulation Debris Blockage -- 12/03/1985 --
GL-85-21   -- Not Issued --
GL-85-20 Resolution of Generic Issue 69: High Pressure Injection/Make-up Nozzle Cracking in Babcock And Wilcox Plants -- 11/08/1985 --
GL-85-19 Reporting Requirements on Primary Coolant Iodine Spikes -- 09/27/1985 --
GL-85-18 Operator Licensing Examinations   81 FR 31969
05/20/2016
--
  09/27/1985
GL-85-17 Availability of Supplements 2 and 3 to NUREG-0933, "A Prioritization of Generic Safety Issues" -- 08/23/1985 --
GL-85-16 High Boron Concentrations -- 08/23/1985 --
GL-85-15 Information on Deadlines for 10CFR50.49, "Environmental Qualification of Electric Equipment Important to Safety at Nuclear Power Plants" -- 08/06/1985 --
GL-85-14 Commercial Storage at Power Reactor Sites of Low Level Radioactive Waste Not Generated by The Utility -- 08/01/1985 --
GL-85-13 Transmittal of NUREG-1154 Regarding The Davis-Besse Loss of Main And Auxiliary Feedwater Event -- 08/05/1985 --
GL-85-12 Implementation of TMI Action Item II.K.3.5, "Automatic Trip of Reactor Coolant Pumps -- 06/28/1985 --
GL-85-11 Completion of Phase II of "Control of Heavy Loads at Nuclear Power Plants" NUREG-0612 -- 06/28/1985 --
GL-85-10 Technical Specification for Generic Letter 83-28, Items 4.3 and 4.4 -- 05/23/1985 --
GL-85-09 Technical Specifications for Generic Letter 83-28, Item 4.3 -- 05/23/1985 --
GL-85-08 10 CFR 20.408 Termination Reports - Format -- 05/23/1985 --
GL-85-07 Implementation of Integrated Schedules for Plant Modifications -- 05/02/1985 --
GL-85-06 Quality Assurance Guidance for ATWS Equipment That is Not Safety-Related -- 01/16/1985 --
GL-85-05 Inadvertent Boron Dilution Events -- 01/31/1985 --
GL-85-04 Operating Licensing Examinations   81 FR 31969
05/20/2016
--
  01/28/1985
GL-85-03 Clarification of Equivalent Control Capacity for Standby Liquid Control Systems -- 01/28/1985 --
GL-85-02 Staff Recommended Actions ... Regarding Steam Generator Tube Integrity -- 04/17/1985 --
GL-85-01 Fire Protection Policy Steering Committee Report -- 01/09/1985 --

Page Last Reviewed/Updated Tuesday, March 09, 2021

Page Last Reviewed/Updated Tuesday, March 09, 2021