Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Generic Letters – 1989

Document Number Title Revision Publish Date Reviewed Date
GL-89-23 NRC Staff Responses to Questions Pertaining to Implementation of 10 CFR Part 26 -- 10/23/1989 --
GL-89-22 Potential for Increased Roof Loads and Plant Area Flood Runoff Depth Due to Recent Change in Probable Maximum Precipitation Criteria Developed by the National Weather Service -- 10/19/1989 --
GL-89-21 Request for Information Concerning Status of Implementation of Unresolved Safety Issue (USI) Requirements -- 10/19/1989 --
GL-89-20 Protected Area Long-Term Housekeeping -- 09/26/1989 --
GL-89-19 Request for Actions Related to Resolution of Unresolved Safety Issue A-47 "Safety Implication of Control Systems in LWR Nuclear Power Plants" Pursuant to 10 CFR 50.54(f) -- 09/20/1989 --
GL-89-18 Resolution of Unresolved Safety Issues A-17, "Systems Interactions in Nuclear Power Plants" -- 09/06/1989 --
GL-89-17 Planned Administrative Changes to the NRC Operator Licensing Written Examination Process W 81 FR 73448
10/25/16
--
09/06/1989
GL-89-16 Installation of a Hardened Wetwell Vent -- 09/01/1989 --
GL-89-15 Emergency Response Data System -- 08/21/1989 --
GL-89-14 Line-Item Improvements in Technical Specifications - Removal of 3.25 Limit on Extending Surveillance Intervals -- 08/21/1989 --
GL-89-13 Service Water System Problems Affecting Safety-Related Equipment S1 04/04/1990 --
-- 07/18/1989 --
GL-89-12 Operator Licensing Examination -- 07/06/1989 --
GL-89-11 Resolution of Generic Issue 101 "Boiling Water Reactor Water Level Redundancy" -- 06/30/1989 --
GL-89-10 Safety-Related Motor-Operated Valve Testing and Surveillance S7 01/24/1996 --
S6 03/08/1994 --
S5 06/28/1993 --
S4 02/12/1992 --
S3 10/25/1990 --
S2 08/03/1990 --
S1 06/13/1990 --
-- 06/28/1989 --
GL-89-09 ASME Section III Component Replacements -- 05/08/1989 --
GL-89-08 Erosion/Corrosion-Induced Pipe Wall Thinning -- 05/02/1989 --
GL-89-07 Power Reactor Safeguards Contingency Planning for Surface Vehicle Bombs S1 08/21/1989 --
-- 04/28/1989 --
GL-89-06 Task Action Item I.D.2 - Safety Parameter Display System - 10 CFR 50.54 (f) -- 04/12/1989 --
GL-89-05 Pilot Testing of the Fundamentals Examination -- 04/04/1989 --
GL-89-04 Guidance on Developing Acceptable Inservice Testing Programs S1 04/04/1995 --
-- 04/03/1989 --
GL-89-03 Operator Licensing Examination Schedule   81 FR 31969
05/20/2016
--
  03/24/1989
GL-89-02 Actions to Improve the Detection of Counterfeit and Fraudulently Marketed Products -- 03/21/1989 --
GL-89-01 Implementation of Programmatic and Procedural Controls for Radiological Effluent Technical Specifications S1 11/14/1990 --
-- 01/31/1989 --

Page Last Reviewed/Updated Tuesday, March 09, 2021

Page Last Reviewed/Updated Tuesday, March 09, 2021