Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Generic Letters - 1983

Document Number Title Revision Publish Date Reviewed Date
GL-83-44 Availability of NUREG-1021, "Operator Licensing Examiner Standards" -- 12/20/1983 --
GL-83-43 Reporting Requirements of 10 CFR 50, Sections 50.72 and 50.73, and Standard Technical Specifications -- 12/19/1983 --
GL-83-42 Clarification to GL 81-07 Regarding Response to NUREG-0612, "Control of Heavy Loads at Nuclear Power Plants" -- 12/19/1983 --
GL-83-41 Fast Cold Starts of Diesel Generators -- 12/16/1983 --
GL-83-40 Operator Licensing Examination   81 FR 31969
05/20/2016
--
  12/21/1983
GL-83-39 Voluntary Survey of Licensed Operators -- 12/08/1983 --
GL-83-38 NUREG-0965, "NRC Inventory of Dams" -- 10/31/1983 --
GL-83-37 NUREG-0737 Technical Specifications -- 11/01/1983 --
GL-83-36 NUREG-0737 Technical Specifications -- 11/01/1983 --
GL-83-35 Clarification of TMI Action Plan Item II.K.3.31 -- 11/02/1983 --
GL-83-34 Important to Safety --   --
GL-83-33 NRC Positions on Certain Requirements of Appendix R to 10 CFR 50 -- 10/19/1983 --
GL-83-32 NRC Staff Recommendations Regarding Operator Action for Reactor Trip and ATWS -- 12/02/1983 --
GL-83-31 Safety Evaluation of "Abnormal Transient Operating Guidelines" -- 09/19/1983 --
GL-83-30 Deletion of STD. Tech Spec Surveillance Requirement 4.8.1.1.2.d.6 for Diesel Generator Testing -- 07/21/1983 --
GL-83-29   -- Not Issued --
GL-83-28 Required Actions Based on Generic Implications of Salem ATWS Events S1 10/07/1992 --
-- 07/08/1983 --
GL-83-27 Surveillance Intervals in Standard Technical Specifications -- 07/06/1983 --
GL-83-26 Clarification Of Surveillance Requirements for Diesel Fuel Impurity Level Tests -- 07/05/1983 --
GL-83-25 Issuance of NRC Form 398 Personnal Qualifications Statement - Licensee -- Not Issued --
GL-83-24 TMI Task Action Plan Item I.G.1, "Special Low Power Testing and Training," Recommendations for BWRS -- 06/29/1983 --
GL-83-23 Safety Evaluation of "Emergency Procedure Guidelines" -- 07/29/1983 --
GL-83-22 Safety Evaluation of "Emergency Response Guidelines" -- 06/03/1983 --
GL-83-21 Clarification of Access Control Procedures for Law Enforcement Visits -- 05/11/1983 --
GL-83-20 Integrated Scheduling for Implementation of Plant Modifications -- 05/09/1983 --
GL-83-19 New Procedures for Providing Public Notice Concerning Issuance of Amendments To Operating Licenses -- 05/02/1983 --
GL-83-18 NRC Staff Review of the BWR Owners' Group (BWROG) Control Room Survey Program -- 04/19/1988 --
GL-83-17 Integrity of Requalification Examinations for Renewal of Reactor Operator and Senior Reactor Operator Licenses -- 04/08/1983 --
GL-83-16 Transmittal of NUREG-0977 Relative to the ATWS Events at Salem Generating Station, Unit NO. 1 -- 03/31/1983 --
-- 03/24/1983 --
GL-83-15 Implement. of Reg. Guide 1.150, "Ultrasonic Testing of RX Vessel Welds During Preservice & Inservice Examinations, REV.1 -- 03/23/1983 --
GL-83-14 Definition of "Key Maintenance Personnel," (Clarification of Generic Letter 82-12) -- 03/07/1983 --
GL-83-13 Clarification of Survell. Req's for HEPA Filters and Charcoal Absorber Units In STD. Tech Specs on ESF Cleanup Systems -- 03/02/1983 --
GL-83-12 Issuance of NRC FORM 398 - Personal Qualifications Statement - Licensee 1 07/11/1983 --
-- 02/24/1983 --
GL-83-11 Licensee Qualification for Performing Safety Analyses in Support of Licensing Actions S1 06/24/1999 --
-- 02/08/1983 --
GL-83-10f Resolution of TMI Action Item II.K.3.5., "Automatic Trip of Reactor Coolant Pumps" -- 02/08/1983 --
GL-83-10e Resolution of TMI Action Item II.K.3.5., "Automatic Trip of Reactor Coolant Pumps" -- 02/08/1983 --
GL-83-10d Resolution of TMI Action Item II.K.3.5., "Automatic Trip of Reactor Coolant Pumps" -- 02/08/1983 --
GL-83-10c Resolution of TMI Action Item II.K.3.5., "Automatic Trip of Reactor Coolant Pumps" -- 02/08/1983 --
GL-83-10b Resolution of TMI Action Item II.K.3.5., "Automatic Trip of Reactor Coolant Pumps" -- 02/08/1983 --
GL-83-10a Resolution of TMI Action Item II.K.3.5., "Automatic Trip of Reactor Coolant Pumps" -- 02/08/1983 --
GL-83-10   -- Not Issued --
GL-83-09 Review of Combustion Engineering Owners' Group Emergency Procedures Guideline Program -- 02/08/1983 --
GL-83-08 Modification of Vacuum Breakers on Mark I Containments -- 02/02/1983 --
GL-83-07 The Nuclear Waste Policy Act of 1982 -- 02/16/1983 --
GL-83-06 Certificates and Revised Format for Reactor Operator and Senior Reactor Operator Licenses -- 01/31/1983 --
GL-83-05 Safety Evaluation of "Emergency Procedure Guidelines, Revision 2," June 1982 -- 02/08/1983 --
GL-83-04 Regional Workshops Regarding Supplement 1 to NUREG-0737, Requirements for Emergency Response Capability -- 02/01/1983 --
GL-83-03 Regulatory Guide 1.150, "Ultrasonic Testing of Reactor Vessel Welds During Pre-Service and Inservice Examinations" -- Not Issued --
GL-83-02 NUREG-0737 Technical Specifications -- 01/10/1983 --
GL-83-01 Operator Licensing Examination Site Visit W 81 FR 31969
05/20/2016
--
  01/11/1983

Page Last Reviewed/Updated Tuesday, March 09, 2021

Page Last Reviewed/Updated Tuesday, March 09, 2021