Document Number |
Title |
Revision |
Publish Date |
Reviewed Date |
GL-93-08 |
Relocation of Technical Specification Tables of Instrument Response Time Limits |
-- |
12/29/1993 |
-- |
GL-93-07 |
Modification of the Technical Specification Administrative Control Requirements for Emergency and Security Plans |
-- |
12/28/1993 |
-- |
GL-93-06 |
Research Results on Generic Safety Issue 106, "Piping and the Use of Highly Combustible Gases in Vital Areas" |
-- |
10/25/1993 |
-- |
GL-93-05 |
Line-Item Technical Specifications Improvements to Reduce Surveillance Requirements for Testing During Power Operation |
-- |
09/27/1993 |
-- |
GL-93-04 |
Rod Control System Failure and Withdrawal of Rod Control Cluster Assemblies, 10 CFR 50.54(f) |
-- |
06/21/1993 |
-- |
GL-93-03 |
Verification of Plant Records |
-- |
10/20/1995 |
-- |
GL-93-02 |
NRC Public Workshop on Commercial Grade Procurement and Dedication |
-- |
03/23/1993 |
-- |
GL-93-01 |
Emergency Response Data System Test Program |
-- |
03/03/1993 |
-- |