Document Number |
Title |
Revision |
Publish Date |
Reviewed Date |
GL-89-23 |
NRC Staff Responses to Questions Pertaining to Implementation of 10 CFR Part 26 |
-- |
10/23/1989 |
-- |
GL-89-22 |
Potential for Increased Roof Loads and Plant Area Flood Runoff Depth Due to Recent Change in Probable Maximum Precipitation Criteria Developed by the National Weather Service |
-- |
10/19/1989 |
-- |
GL-89-21 |
Request for Information Concerning Status of Implementation of Unresolved Safety Issue (USI) Requirements |
-- |
10/19/1989 |
-- |
GL-89-20 |
Protected Area Long-Term Housekeeping |
-- |
09/26/1989 |
-- |
GL-89-19 |
Request for Actions Related to Resolution of Unresolved Safety Issue A-47 "Safety Implication of Control Systems in LWR Nuclear Power Plants" Pursuant to 10 CFR 50.54(f) |
-- |
09/20/1989 |
-- |
GL-89-18 |
Resolution of Unresolved Safety Issues A-17, "Systems Interactions in Nuclear Power Plants" |
-- |
09/06/1989 |
-- |
GL-89-17 |
Planned Administrative Changes to the NRC Operator Licensing Written Examination Process |
W |
81 FR 73448
10/25/16 |
-- |
09/06/1989 |
GL-89-16 |
Installation of a Hardened Wetwell Vent |
-- |
09/01/1989 |
-- |
GL-89-15 |
Emergency Response Data System |
-- |
08/21/1989 |
-- |
GL-89-14 |
Line-Item Improvements in Technical Specifications - Removal of 3.25 Limit on Extending Surveillance Intervals |
-- |
08/21/1989 |
-- |
GL-89-13 |
Service Water System Problems Affecting Safety-Related Equipment |
S1 |
04/04/1990 |
-- |
-- |
07/18/1989 |
-- |
GL-89-12 |
Operator Licensing Examination |
-- |
07/06/1989 |
-- |
GL-89-11 |
Resolution of Generic Issue 101 "Boiling Water Reactor Water Level Redundancy" |
-- |
06/30/1989 |
-- |
GL-89-10 |
Safety-Related Motor-Operated Valve Testing and Surveillance |
S7 |
01/24/1996 |
-- |
S6 |
03/08/1994 |
-- |
S5 |
06/28/1993 |
-- |
S4 |
02/12/1992 |
-- |
S3 |
10/25/1990 |
-- |
S2 |
08/03/1990 |
-- |
S1 |
06/13/1990 |
-- |
-- |
06/28/1989 |
-- |
GL-89-09 |
ASME Section III Component Replacements |
-- |
05/08/1989 |
-- |
GL-89-08 |
Erosion/Corrosion-Induced Pipe Wall Thinning |
-- |
05/02/1989 |
-- |
GL-89-07 |
Power Reactor Safeguards Contingency Planning for Surface Vehicle Bombs |
S1 |
08/21/1989 |
-- |
-- |
04/28/1989 |
-- |
GL-89-06 |
Task Action Item I.D.2 - Safety Parameter Display System - 10 CFR 50.54 (f) |
-- |
04/12/1989 |
-- |
GL-89-05 |
Pilot Testing of the Fundamentals Examination |
-- |
04/04/1989 |
-- |
GL-89-04 |
Guidance on Developing Acceptable Inservice Testing Programs |
S1 |
04/04/1995 |
-- |
-- |
04/03/1989 |
-- |
GL-89-03 |
Operator Licensing Examination Schedule |
|
81 FR 31969
05/20/2016 |
-- |
|
03/24/1989 |
GL-89-02 |
Actions to Improve the Detection of Counterfeit and Fraudulently Marketed Products |
-- |
03/21/1989 |
-- |
GL-89-01 |
Implementation of Programmatic and Procedural Controls for Radiological Effluent Technical Specifications |
S1 |
11/14/1990 |
-- |
-- |
01/31/1989 |
-- |