Document Number |
Title |
Revision |
Publish Date |
Reviewed Date |
GL-91-19 |
Information to Addressees Regarding New Telephone Numbers for NRC Offices Located in One White Flint North |
-- |
12/19/1991 |
-- |
GL-91-18 |
Information to Licensees Regarding Two NRC Inspection Manual Sections on Resolution of Degraded and Nonconforming Conditions and on Operability
[superseded by RIS-05-20] |
W |
81 FR 31969
05/20/2016 |
-- |
1 |
10/08/1997
11/07/1991 |
-- |
GL-91-17 |
Generic Safety Issue 29, "Bolting Degradation or Failure in Nuclear Power Plants" |
-- |
10/17/1991 |
-- |
GL-91-16 |
Licensed Operators' and Other Nuclear Facility Personnel Fitness for Duty |
-- |
10/03/1991 |
-- |
GL-91-15 |
Operating Experience Feedback Report, Solenoid-Operated Valve Problems at U.S. Reactors |
-- |
09/23/1991 |
-- |
GL-91-14 |
Emergency Telecommunications |
-- |
09/23/1991 |
-- |
GL-91-13 |
Request for Info Related to the Resolution of GI 130, "Essential Service Water System Failures at Multi-Unit Sites" |
-- |
09/19/1991 |
-- |
GL-91-12 |
Operator Licensing National Examination Schedule |
W |
81 FR 31969
05/20/2016 |
-- |
|
07/18/1991 |
GL-91-11 |
Resolution of Generic Issues 48, "LCOs for Class 1E Vital Instrument Buses," and 49, "Interlocks and LCOs for Class 1E Tie Breakers," Pursuant to 10 CFR 50.54 |
-- |
07/08/1991 |
-- |
GL-91-10 |
Explosives Searches at Protected Area Portals |
-- |
08/27/1991 |
-- |
GL-91-09 |
Modification of Surveillance Interval for the Electrical Protective Assemblies in Power Supplies for the Reactor Protection System |
-- |
06/27/1991 |
-- |
GL-91-08 |
Removal of Component Lists from Technical Specifications |
-- |
05/06/1991 |
-- |
GL-91-07 |
GI-23, "Reactor Coolant Pump Seal Failures" and Its Possible Effect on Station Blackout |
-- |
05/02/1991 |
-- |
GL-91-06 |
Resolution of Generic Issue A-30, "Adequacy of Safety-Related DC Power Supplies," Pursuant to 10 CFR 50.54(f) |
-- |
|
-- |
GL-91-05 |
Licensee Commercial-Grade Procurement and Dedication Programs |
-- |
04/09/1991 |
-- |
GL-91-04 |
Changes in Technical Specification Surveillance Intervals to Accommodate a 24-Month Fuel Cycle |
-- |
04/02/1991 |
-- |
GL-91-03 |
Reporting of Safeguards Events |
-- |
03/06/1991 |
-- |
GL-91-02 |
Reporting Mishaps Involving LLW Forms Prepared for Disposal |
-- |
|
-- |
GL-91-01 |
Removal of the Schedule for the Withdrawal of Reactor Vessel Material Specimens from Technical Specifications |
-- |
01/04/1991 |
-- |