Document Number |
Title |
Revision |
Publish Date |
Reviewed Date |
GL-87-16 |
Transmittal of NUREG-1262, "Answers to Questions on Implementation of 10 CFR 55 on Operators' Licenses" |
-- |
11/12/1987 |
-- |
GL-87-15 |
Policy Statement on Deferred Plants |
-- |
11/04/1987 |
-- |
GL-87-14 |
Operator Licensing Examinations |
|
81 FR 31969
05/20/2016 |
-- |
|
08/14/1987 |
GL-87-13 |
Integrity of Requalification Examinations at Non-Power Reactors |
-- |
07/10/1987 |
-- |
GL-87-12 |
Loss of Residual Heat Removal While the Reactor Coolant System is Partially Filled |
-- |
07/09/1987 |
-- |
GL-87-11 |
Relaxation in Arbitrary Intermediate Pipe Rupture Requirements |
-- |
06/19/1987 |
-- |
GL-87-10 |
Implementation of 10 CFR 73.57, Requirements for FBI Criminal History Checks |
-- |
06/12/1987 |
-- |
GL-87-09 |
Sections 3.0 and 4.0 of Standard Tech Specs on Limiting Conditions for Operation and Surveillance Requirements |
-- |
06/04/1987 |
-- |
GL-87-08 |
Implementation of 10 CFR 73.55 Miscellaneous Amendments and Search Requirements |
-- |
05/11/1987 |
-- |
GL-87-07 |
Information Transmittal of Final Rulemaking for Revisions to Operator Licensing - 10 CFR 55 and Confirming Amendments |
-- |
03/19/1987 |
-- |
GL-87-06 |
Periodic Verification of Leak Tight Integrity of Pressure Isolation Valves |
-- |
03/13/1987 |
-- |
GL-87-05 |
Request for Additional Information Assessment of Licensee Measures to Mitigate and/or Identify Potential Degradation of Mark I Drywells |
-- |
03/12/1987 |
-- |
GL-87-04 |
Temporary Exemption From Provisions of the FBI Criminal History Rule for Temporary Workers |
-- |
03/06/1987 |
-- |
GL-87-03 |
Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors (USI A-46) |
-- |
02/27/1987 |
-- |
GL-87-02 |
Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors (USI A-46) |
S1 |
02/14/1992 |
-- |
-- |
02/19/1987 |
-- |
GL-87-01 |
Public Availability of the NRC Operator Licensing Examination Question Bank |
-- |
01/08/1987 |
-- |