The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Generic Letters - 1980

Document Number Title Revision Publish Date Reviewed Date
GL-80-113 Control of Heavy Loads -- 12/22/1980 --
GL-80-112 IEB 80-25 Operating Problems with Target Rock Safety Relief Valves -- Date Unknown --
GL-80-111 IEB 80-17 Supplement 4, Failure of Control Rods to Insert During a Scram at a BWR -- 12/18/1980 --
GL-80-110 Periodic Updating of FSARS -- 12/15/1980 --
GL-80-109 Guidelines for SEP Soil Structure Interaction Reviews -- 12/15/1980 --
GL-80-108 Emergency Planning -- 12/09/1980 --
GL-80-107 BWR Scram Discharge System -- 12/09/1980 --
GL-80-106 Report on ECCS Cladding Models, NUREG-0630 -- 11/28/1980 --
GL-80-105 Implementation of Guidance for USI A-12, Potential for Low Fracture Toughness and Lamellar Tearing on Component Supports -- 11/25/1980 --
GL-80-104 Orders on Environmental Qualification of Safety Related Electrical Equipment -- 11/26/1980 --
GL-80-103 Fire Protection - Revised Federal Register Notice -- 11/25/1980 --
GL-80-102 Commission Memorandum and Order of May 23, 1980 (Referencing IEB 79-01b Supplement 2 - q.2 & 3 - Sept 30, 1980) -- 11/25/1980 --
GL-80-101 Inservice Inspection Programs for Prestressed Concrete Containment Structures -- 11/25/1980 --
GL-80-100 Appendix R to 10 CFR 50 Regarding Fire Protection-Federal Register Notice -- 11/24/1980 --
GL-80-99 Technical Specification Revisions For Snubber Surveillance -- 11/20/1980 --
GL-80-98 IEB 80-24 Prevention of Damage Due to Water Leakage Inside Containment -- 11/21/1980 --
GL-80-97 IEB 80-23 Failures of Solenoid Valves Manufactured by Valcor Engineering Corporation -- 11/14/1980 --
GL-80-96 Fire Protection -- 11/14/1980 --
GL-80-95 Generic Activity A-10 -- 11/13/1980 --
GL-80-94 Emergency Plan -- 11/13/1980 --
GL-80-93 Emergency Preparedness -- 11/06/1980 --
GL-80-92 IEB 80-21 Valve Yokes Supplied by Malcolm Foundry Company, Inc. -- 11/06/1980 --
GL-80-91 Odyn Code Calculation -- 11/04/1980 --
GL-80-90 Post TMI Requirements, NUREG-0737 -- 10/31/1980 --
GL-80-89 IEB 79-01b Supplement 3 Environmental Qualification of Class 1E Equipment -- 10/24/1980 --
GL-80-88 Seismic Qualification of Auxiliary Feedwater Systems -- 10/21/1980 --
GL-80-87 Notice of Meeting to Discuss Status of EPRI-Proposed Resolution of the USI A-12 Fracture Toughness Issue -- 10/17/1980 --
GL-80-86 Notice of Meeting to Discuss Final Resolution of USI A-12 -- 10/17/1980 --
GL-80-85 Implementation of Guidance From Unresolved Safety Issue A-12, "Potential for Low Fracture Toughness and Lamellar Tearing on Component Supports" -- 10/06/1980 --
GL-80-84 BWR Scram System -- 10/01/1980 --
GL-80-83 Environmental Qualification of Safety-Related Equipment -- 10/01/1980 --
GL-80-82 IEB 79-01b Supplement 2 Environmental Qualification of Class 1E Equipment -- 09/30/1980 --
GL-80-81 Preliminary Clarification of TMI Action Plan Requirements - Addendum to 9/5/80 Letter -- 09/19/1980 --
GL-80-80 Preliminary Clarification of TMI Action Plan Requirements -- 09/05/1980 --
GL-80-79 IEB 80-17 Supplement 3 Failures Revealed by Testing Subsequent to Failure of Control Rods to Insert During a Scram at a BWR -- Date Unknown --
GL-80-78 Mark I Containment Long-Term Program -- 08/20/1980 --
GL-80-77 Refueling Water Level -- 08/15/1980 --
GL-80-76 Notice of Forthcoming Meeting with GE to Discussed Proposed BWR Feedwater Nozzle Leakage Detection System -- 08/14/1980 --
GL-80-75 Lessons Learned Tech Specs -- 08/01/1980 --
GL-80-74 Notice of Forthcoming Meeting with Representatives of EPRI to Discuss Program for Resolution of USI A-12, Fracture Tough -- 08/01/1980 --
GL-80-73 Functional Criteria for Emergency Response Facilities, NUREG-0696 -- 08/01/1980 --
GL-80-72 Interim Criteria for Shift Staffing -- 07/31/1980 --
GL-80-71 IEB 80-20 Failures of Westinghouse Type W-2 Spring Return to Neutral Control Switches -- Date Unknown --
GL-80-70 IEB 80-19 Failures of Mercury-Wetted Matrix Relays in RPS of Operating Nuclear Power Plants Designed by GE -- Date Unknown --
GL-80-69 IEB 80-18 Maintenance of Adequate Minimum Flow Through Centrifugal Charging Pumps Following Secondary Side Helb -- Date Unknown --
GL-80-68 IEB 80-17 Supplement 2 Failures Revealed by Testing Subsequent to Failure of Control Rods to Insert During a Scram at a BWR -- Date Unknown --
GL-80-67 Scram Discharge Volume -- 07/22/1980 --
GL-80-66 IEB 80-17 Supplement 1 Failure of Control Rods to Insert During a Scram at a BWR -- 07/18/1980 --
GL-80-65 Request for Estimated Construction Completion and Fuel Load Schedules -- 07/11/1980 --
GL-80-64 Scram Discharge Volume Designs -- 07/07/1980 --
GL-80-63 IEB 80-17 Failure of Control Rods to Insert During a Scram at a BWR -- Date Unknown --
GL-80-62 TMI-2 Lessons Learned -- 07/02/1980 --
GL-80-61 TMI-2 Lessons Learned -- 07/02/1980 --
GL-80-60 Request for Information Regarding Evacuation Times -- 07/02/1980 --
GL-80-59 Transmittal of Federal Register Notice RE Regional Meetings to Discuss Environmental Qualification of Elec. Equipment -- 06/30/1980 --
GL-80-58 IEB 80-16 Potential Misapplication of Rosemount Inc. Models 1151/1152 Pressure Transmitters with "A" Or "D" Output Codes -- Date Unknown --
GL-80-57 Further Commission Guidance for Power Reactor Operating Licenses NUREG-0660 and NUREG-0694 -- 06/26/1980 --
GL-80-56 Commission Memorandum and Order on Equipment Qualification -- 06/25/1980 --
GL-80-55 IEB 80-15 Possible Loss of Hotline With Loss of Off-Site Power -- Date Unknown --
GL-80-54 IEB 80-14 Degradation of Scram Discharge Volume Capability -- Date Unknown --
GL-80-53 Decay Heat Removal Capability -- 06/11/1980 --
GL-80-52 Five Additional TMI-2 Related Requirements - Erata Sheets to 5/7/80 Letter -- Date Unknown --
GL-80-51 On-Site Storage of Low-Level Waste -- 06/09/1990 --
GL-80-50 Generic Activity A-10 BWR Cracks -- 06/05/1980 --
GL-80-49 Nuclear Safeguards Problems -- 06/03/1980 --
GL-80-48 Revision to 5/19/80 Letter on Fire Protection -- 05/22/1980 --
GL-80-47 Additional Guidance on "Potential for Low Fracture Toughness and Lamellar Tearing on PWR Steam Generator and Reactor Coolant Pump Supports" -- 05/20/1980 --
GL-80-46 Generic Technical Activity A-12 Fracture Toughness -- 05/19/1980 --
GL-80-45 Fire Protection Rule -- 05/19/1980 --
GL-80-44 Reorganization of Functions and Assignments Within ONRR/SSPB -- 05/14/1980 --
GL-80-43 IEB 80-13 Cracking in Core Spray Spargers -- 05/12/1980 --
GL-80-42 IEB 80-12 Decay Heat Removal System Operability -- 05/09/1980 --
GL-80-41 Summary of Meetings Held on April 22 & 23, 1980 with Representatives of the Mark I Owners Group -- 05/09/1980 --
GL-80-40 Transmittal of NUREG-0654 "Report of the B&O Task Force"And Appropriate NUREG-0626 "Generic Eval of FW Transient and Sbl -- 05/08/1980 --
GL-80-39 IEB 80-11 Masonry Wall Design -- Date Unknown --
GL-80-38 Summary of Certain Non-Power Reactor Physical Protection Requirements -- 05/07/1980 --
GL-80-37 Five Additional TMI-2 Related Requirements to Operating Reactors -- 05/07/1980 --
GL-80-36 IEB 80-10 Contamination of Non-Radioactive System and Resulting Potential for Unmonitored, Uncontrolled Release to Environment -- Date Unknown --
GL-80-35 Effect of a DC Power Supply Failure on ECCS Performances -- 04/25/1980 --
GL-80-34 Clarification of NRC Requirements For Emergency Response Facilities at Each Site -- 04/25/1980 --
GL-80-33 Actions Req. From OL Applicants of B&W Designed NSSS Resulting From NRC B&O Task Force Review of TMI2 Accident -- 04/24/1980 --
GL-80-32 Information Request on Category I Masonry Walls Employed by Plants Under CP and OL Review -- 04/21/1980 --
GL-80-31 IEB 80-09 Hydramotor Actuator Deficiencies -- Date Unknown --
GL-80-30 Clarification of the Term "Operable" As It Applies to Single Failure Criterion For Safety Systems Required by TS -- 04/10/1980 --
GL-80-29 Modifications to Boiling Water Reactor Control Rod Drive Systems -- 04/07/1980 --
GL-80-28 IEB 80-08 Examination of Containment Liner Penetration Welds -- 04/07/1980 --
GL-80-27 IEB 80-07 BWR Jet Pump Assembly Failure -- 04/04/1980 --
GL-80-26 Qualifications of Reactor Operators -- 03/28/1980 --
GL-80-25 IEB 80-06 Engineering Safety Feature (ESF) Reset Controls -- 03/13/1980 --
GL-80-24 Transmittal of Information on NRC "Nuclear Data Link Specifications" -- 03/12/1980 --
GL-80-23 Change of Submittal Date for Evaluation Time Estimates -- 03/11/1980 --
GL-80-22 Transmittal of NUREG-0654 "Criteria For Preparation and Evaluation of Radiological Emergency Response Plans and Prepared -- 03/10/1980 --
GL-80-21 IEB 80-05 Vacuum Condition Resulting in Damage to Chemical Volume Control System Holdup Tanks -- 03/10/1980 --
GL-80-20 Actions Req. From OL Applicants of NSSS Designs by W and CE Resulting From NRC B&O Task Force Review of TMI2 Accident -- 03/10/1980 --
GL-80-19 Resolution of Enhanced Fission Gas Release Concern -- 03/10/1980 --
GL-80-18 Crystal River 3 Reactor Trip From Approximately 100% Full Power -- 03/06/1980 --
GL-80-17 Modifications to Boiling Water Reactor Control Rod Drive Systems -- 03/04/1980 --
GL-80-16 IEB 79-01b Environmental Qualification of Class 1E Equipment -- 02/29/1980 --
GL-80-15 Request for Additional Management and Technical Resources Information -- 02/28/1980 --
GL-80-14 LWR Primary Coolant System Pressure Isolation Valves -- 02/23/1980 --
GL-80-13 Qualification of Safety Related Electrical Equipment -- 02/21/1980 --
GL-80-12 IEB 80-04 Analysis of a PWR Main Steam Sine Break with Continued Feedwater Addition -- 02/08/1980 --
GL-80-11 IEB 80-03 Loss of Charcoal From Standard Type II, 2 Inch, Tray Absorber Cells -- 01/31/1980 --
GL-80-10 Issuance of NUREG-0588, "Interim Staff Position on Equipment Qualifications of Safety-Related Electrical Equipment" -- 02/05/1980 --
GL-80-09 Low Level Radioactive Waste Disposal -- 01/29/1980 --
GL-80-08 IEB 80-02 Inadequate Quality Assurance for Nuclear Supplied Equipment -- 01/21/1980 --
GL-80-07 Information Regarding the Program For Environmental Qualification of Safety-Related Electrical Equipment -- Date Unknown --
GL-80-06 Issuance of NUREG-0313, Rev 1, "Technical Report on Material Selection and Processing Guidelines for BWR Coolant Pressure" -- 01/18/1980 --
GL-80-05 IEB 79-01b Environmental Qualification of Class 1E Equipment -- 01/14/1980 --
GL-80-04 IEB 80-01 Operability of ADS Valve Pneumatic Supply -- 01/11/1980 --
GL-80-03 BWR Control Rod Failures -- 01/10/1980 --
GL-80-02 Quality Assurance Requirements Regarding Diesel Generator Fuel Oil -- 01/07/1980 --
GL-80-01 NUREG-0630 "Cladding, Swelling and Rupture - Models for LOCA Analysis" -- 01/03/1980 --

Page Last Reviewed/Updated Tuesday, March 9, 2021