Document Number |
Title |
Revision |
Publish Date |
Reviewed Date |
GL-80-113 |
Control of Heavy Loads |
-- |
12/22/1980 |
-- |
GL-80-112 |
IEB 80-25 Operating Problems with Target Rock Safety Relief Valves |
-- |
Date Unknown |
-- |
GL-80-111 |
IEB 80-17 Supplement 4, Failure of Control Rods to Insert During a Scram at a BWR |
-- |
12/18/1980 |
-- |
GL-80-110 |
Periodic Updating of FSARS |
-- |
12/15/1980 |
-- |
GL-80-109 |
Guidelines for SEP Soil Structure Interaction Reviews |
-- |
12/15/1980 |
-- |
GL-80-108 |
Emergency Planning |
-- |
12/09/1980 |
-- |
GL-80-107 |
BWR Scram Discharge System |
-- |
12/09/1980 |
-- |
GL-80-106 |
Report on ECCS Cladding Models, NUREG-0630 |
-- |
11/28/1980 |
-- |
GL-80-105 |
Implementation of Guidance for USI A-12, Potential for Low Fracture Toughness and Lamellar Tearing on Component Supports |
-- |
11/25/1980 |
-- |
GL-80-104 |
Orders on Environmental Qualification of Safety Related Electrical Equipment |
-- |
11/26/1980 |
-- |
GL-80-103 |
Fire Protection - Revised Federal Register Notice |
-- |
11/25/1980 |
-- |
GL-80-102 |
Commission Memorandum and Order of May 23, 1980 (Referencing IEB 79-01b Supplement 2 - q.2 & 3 - Sept 30, 1980) |
-- |
11/25/1980 |
-- |
GL-80-101 |
Inservice Inspection Programs for Prestressed Concrete Containment Structures |
-- |
11/25/1980 |
-- |
GL-80-100 |
Appendix R to 10 CFR 50 Regarding Fire Protection-Federal Register Notice |
-- |
11/24/1980 |
-- |
GL-80-99 |
Technical Specification Revisions For Snubber Surveillance |
-- |
11/20/1980 |
-- |
GL-80-98 |
IEB 80-24 Prevention of Damage Due to Water Leakage Inside Containment |
-- |
11/21/1980 |
-- |
GL-80-97 |
IEB 80-23 Failures of Solenoid Valves Manufactured by Valcor Engineering Corporation |
-- |
11/14/1980 |
-- |
GL-80-96 |
Fire Protection |
-- |
11/14/1980 |
-- |
GL-80-95 |
Generic Activity A-10 |
-- |
11/13/1980 |
-- |
GL-80-94 |
Emergency Plan |
-- |
11/13/1980 |
-- |
GL-80-93 |
Emergency Preparedness |
-- |
11/06/1980 |
-- |
GL-80-92 |
IEB 80-21 Valve Yokes Supplied by Malcolm Foundry Company, Inc. |
-- |
11/06/1980 |
-- |
GL-80-91 |
Odyn Code Calculation |
-- |
11/04/1980 |
-- |
GL-80-90 |
Post TMI Requirements, NUREG-0737 |
-- |
10/31/1980 |
-- |
GL-80-89 |
IEB 79-01b Supplement 3 Environmental Qualification of Class 1E Equipment |
-- |
10/24/1980 |
-- |
GL-80-88 |
Seismic Qualification of Auxiliary Feedwater Systems |
-- |
10/21/1980 |
-- |
GL-80-87 |
Notice of Meeting to Discuss Status of EPRI-Proposed Resolution of the USI A-12 Fracture Toughness Issue |
-- |
10/17/1980 |
-- |
GL-80-86 |
Notice of Meeting to Discuss Final Resolution of USI A-12 |
-- |
10/17/1980 |
-- |
GL-80-85 |
Implementation of Guidance From Unresolved Safety Issue A-12, "Potential for Low Fracture Toughness and Lamellar Tearing on Component Supports" |
-- |
10/06/1980 |
-- |
GL-80-84 |
BWR Scram System |
-- |
10/01/1980 |
-- |
GL-80-83 |
Environmental Qualification of Safety-Related Equipment |
-- |
10/01/1980 |
-- |
GL-80-82 |
IEB 79-01b Supplement 2 Environmental Qualification of Class 1E Equipment |
-- |
09/30/1980 |
-- |
GL-80-81 |
Preliminary Clarification of TMI Action Plan Requirements - Addendum to 9/5/80 Letter |
-- |
09/19/1980 |
-- |
GL-80-80 |
Preliminary Clarification of TMI Action Plan Requirements |
-- |
09/05/1980 |
-- |
GL-80-79 |
IEB 80-17 Supplement 3 Failures Revealed by Testing Subsequent to Failure of Control Rods to Insert During a Scram at a BWR |
-- |
Date Unknown |
-- |
GL-80-78 |
Mark I Containment Long-Term Program |
-- |
08/20/1980 |
-- |
GL-80-77 |
Refueling Water Level |
-- |
08/15/1980 |
-- |
GL-80-76 |
Notice of Forthcoming Meeting with GE to Discussed Proposed BWR Feedwater Nozzle Leakage Detection System |
-- |
08/14/1980 |
-- |
GL-80-75 |
Lessons Learned Tech Specs |
-- |
08/01/1980 |
-- |
GL-80-74 |
Notice of Forthcoming Meeting with Representatives of EPRI to Discuss Program for Resolution of USI A-12, Fracture Tough |
-- |
08/01/1980 |
-- |
GL-80-73 |
Functional Criteria for Emergency Response Facilities, NUREG-0696 |
-- |
08/01/1980 |
-- |
GL-80-72 |
Interim Criteria for Shift Staffing |
-- |
07/31/1980 |
-- |
GL-80-71 |
IEB 80-20 Failures of Westinghouse Type W-2 Spring Return to Neutral Control Switches |
-- |
Date Unknown |
-- |
GL-80-70 |
IEB 80-19 Failures of Mercury-Wetted Matrix Relays in RPS of Operating Nuclear Power Plants Designed by GE |
-- |
Date Unknown |
-- |
GL-80-69 |
IEB 80-18 Maintenance of Adequate Minimum Flow Through Centrifugal Charging Pumps Following Secondary Side Helb |
-- |
Date Unknown |
-- |
GL-80-68 |
IEB 80-17 Supplement 2 Failures Revealed by Testing Subsequent to Failure of Control Rods to Insert During a Scram at a BWR |
-- |
Date Unknown |
-- |
GL-80-67 |
Scram Discharge Volume |
-- |
07/22/1980 |
-- |
GL-80-66 |
IEB 80-17 Supplement 1 Failure of Control Rods to Insert During a Scram at a BWR |
-- |
07/18/1980 |
-- |
GL-80-65 |
Request for Estimated Construction Completion and Fuel Load Schedules |
-- |
07/11/1980 |
-- |
GL-80-64 |
Scram Discharge Volume Designs |
-- |
07/07/1980 |
-- |
GL-80-63 |
IEB 80-17 Failure of Control Rods to Insert During a Scram at a BWR |
-- |
Date Unknown |
-- |
GL-80-62 |
TMI-2 Lessons Learned |
-- |
07/02/1980 |
-- |
GL-80-61 |
TMI-2 Lessons Learned |
-- |
07/02/1980 |
-- |
GL-80-60 |
Request for Information Regarding Evacuation Times |
-- |
07/02/1980 |
-- |
GL-80-59 |
Transmittal of Federal Register Notice RE Regional Meetings to Discuss Environmental Qualification of Elec. Equipment |
-- |
06/30/1980 |
-- |
GL-80-58 |
IEB 80-16 Potential Misapplication of Rosemount Inc. Models 1151/1152 Pressure Transmitters with "A" Or "D" Output Codes |
-- |
Date Unknown |
-- |
GL-80-57 |
Further Commission Guidance for Power Reactor Operating Licenses NUREG-0660 and NUREG-0694 |
-- |
06/26/1980 |
-- |
GL-80-56 |
Commission Memorandum and Order on Equipment Qualification |
-- |
06/25/1980 |
-- |
GL-80-55 |
IEB 80-15 Possible Loss of Hotline With Loss of Off-Site Power |
-- |
Date Unknown |
-- |
GL-80-54 |
IEB 80-14 Degradation of Scram Discharge Volume Capability |
-- |
Date Unknown |
-- |
GL-80-53 |
Decay Heat Removal Capability |
-- |
06/11/1980 |
-- |
GL-80-52 |
Five Additional TMI-2 Related Requirements - Erata Sheets to 5/7/80 Letter |
-- |
Date Unknown |
-- |
GL-80-51 |
On-Site Storage of Low-Level Waste |
-- |
06/09/1990 |
-- |
GL-80-50 |
Generic Activity A-10 BWR Cracks |
-- |
06/05/1980 |
-- |
GL-80-49 |
Nuclear Safeguards Problems |
-- |
06/03/1980 |
-- |
GL-80-48 |
Revision to 5/19/80 Letter on Fire Protection |
-- |
05/22/1980 |
-- |
GL-80-47 |
Additional Guidance on "Potential for Low Fracture Toughness and Lamellar Tearing on PWR Steam Generator and Reactor Coolant Pump Supports" |
-- |
05/20/1980 |
-- |
GL-80-46 |
Generic Technical Activity A-12 Fracture Toughness |
-- |
05/19/1980 |
-- |
GL-80-45 |
Fire Protection Rule |
-- |
05/19/1980 |
-- |
GL-80-44 |
Reorganization of Functions and Assignments Within ONRR/SSPB |
-- |
05/14/1980 |
-- |
GL-80-43 |
IEB 80-13 Cracking in Core Spray Spargers |
-- |
05/12/1980 |
-- |
GL-80-42 |
IEB 80-12 Decay Heat Removal System Operability |
-- |
05/09/1980 |
-- |
GL-80-41 |
Summary of Meetings Held on April 22 & 23, 1980 with Representatives of the Mark I Owners Group |
-- |
05/09/1980 |
-- |
GL-80-40 |
Transmittal of NUREG-0654 "Report of the B&O Task Force"And Appropriate NUREG-0626 "Generic Eval of FW Transient and Sbl |
-- |
05/08/1980 |
-- |
GL-80-39 |
IEB 80-11 Masonry Wall Design |
-- |
Date Unknown |
-- |
GL-80-38 |
Summary of Certain Non-Power Reactor Physical Protection Requirements |
-- |
05/07/1980 |
-- |
GL-80-37 |
Five Additional TMI-2 Related Requirements to Operating Reactors |
-- |
05/07/1980 |
-- |
GL-80-36 |
IEB 80-10 Contamination of Non-Radioactive System and Resulting Potential for Unmonitored, Uncontrolled Release to Environment |
-- |
Date Unknown |
-- |
GL-80-35 |
Effect of a DC Power Supply Failure on ECCS Performances |
-- |
04/25/1980 |
-- |
GL-80-34 |
Clarification of NRC Requirements For Emergency Response Facilities at Each Site |
-- |
04/25/1980 |
-- |
GL-80-33 |
Actions Req. From OL Applicants of B&W Designed NSSS Resulting From NRC B&O Task Force Review of TMI2 Accident |
-- |
04/24/1980 |
-- |
GL-80-32 |
Information Request on Category I Masonry Walls Employed by Plants Under CP and OL Review |
-- |
04/21/1980 |
-- |
GL-80-31 |
IEB 80-09 Hydramotor Actuator Deficiencies |
-- |
Date Unknown |
-- |
GL-80-30 |
Clarification of the Term "Operable" As It Applies to Single Failure Criterion For Safety Systems Required by TS |
-- |
04/10/1980 |
-- |
GL-80-29 |
Modifications to Boiling Water Reactor Control Rod Drive Systems |
-- |
04/07/1980 |
-- |
GL-80-28 |
IEB 80-08 Examination of Containment Liner Penetration Welds |
-- |
04/07/1980 |
-- |
GL-80-27 |
IEB 80-07 BWR Jet Pump Assembly Failure |
-- |
04/04/1980 |
-- |
GL-80-26 |
Qualifications of Reactor Operators |
-- |
03/28/1980 |
-- |
GL-80-25 |
IEB 80-06 Engineering Safety Feature (ESF) Reset Controls |
-- |
03/13/1980 |
-- |
GL-80-24 |
Transmittal of Information on NRC "Nuclear Data Link Specifications" |
-- |
03/12/1980 |
-- |
GL-80-23 |
Change of Submittal Date for Evaluation Time Estimates |
-- |
03/11/1980 |
-- |
GL-80-22 |
Transmittal of NUREG-0654 "Criteria For Preparation and Evaluation of Radiological Emergency Response Plans and Prepared |
-- |
03/10/1980 |
-- |
GL-80-21 |
IEB 80-05 Vacuum Condition Resulting in Damage to Chemical Volume Control System Holdup Tanks |
-- |
03/10/1980 |
-- |
GL-80-20 |
Actions Req. From OL Applicants of NSSS Designs by W and CE Resulting From NRC B&O Task Force Review of TMI2 Accident |
-- |
03/10/1980 |
-- |
GL-80-19 |
Resolution of Enhanced Fission Gas Release Concern |
-- |
03/10/1980 |
-- |
GL-80-18 |
Crystal River 3 Reactor Trip From Approximately 100% Full Power |
-- |
03/06/1980 |
-- |
GL-80-17 |
Modifications to Boiling Water Reactor Control Rod Drive Systems |
-- |
03/04/1980 |
-- |
GL-80-16 |
IEB 79-01b Environmental Qualification of Class 1E Equipment |
-- |
02/29/1980 |
-- |
GL-80-15 |
Request for Additional Management and Technical Resources Information |
-- |
02/28/1980 |
-- |
GL-80-14 |
LWR Primary Coolant System Pressure Isolation Valves |
-- |
02/23/1980 |
-- |
GL-80-13 |
Qualification of Safety Related Electrical Equipment |
-- |
02/21/1980 |
-- |
GL-80-12 |
IEB 80-04 Analysis of a PWR Main Steam Sine Break with Continued Feedwater Addition |
-- |
02/08/1980 |
-- |
GL-80-11 |
IEB 80-03 Loss of Charcoal From Standard Type II, 2 Inch, Tray Absorber Cells |
-- |
01/31/1980 |
-- |
GL-80-10 |
Issuance of NUREG-0588, "Interim Staff Position on Equipment Qualifications of Safety-Related Electrical Equipment" |
-- |
02/05/1980 |
-- |
GL-80-09 |
Low Level Radioactive Waste Disposal |
-- |
01/29/1980 |
-- |
GL-80-08 |
IEB 80-02 Inadequate Quality Assurance for Nuclear Supplied Equipment |
-- |
01/21/1980 |
-- |
GL-80-07 |
Information Regarding the Program For Environmental Qualification of Safety-Related Electrical Equipment |
-- |
Date Unknown |
-- |
GL-80-06 |
Issuance of NUREG-0313, Rev 1, "Technical Report on Material Selection and Processing Guidelines for BWR Coolant Pressure" |
-- |
01/18/1980 |
-- |
GL-80-05 |
IEB 79-01b Environmental Qualification of Class 1E Equipment |
-- |
01/14/1980 |
-- |
GL-80-04 |
IEB 80-01 Operability of ADS Valve Pneumatic Supply |
-- |
01/11/1980 |
-- |
GL-80-03 |
BWR Control Rod Failures |
-- |
01/10/1980 |
-- |
GL-80-02 |
Quality Assurance Requirements Regarding Diesel Generator Fuel Oil |
-- |
01/07/1980 |
-- |
GL-80-01 |
NUREG-0630 "Cladding, Swelling and Rupture - Models for LOCA Analysis" |
-- |
01/03/1980 |
-- |