Generic Letters - 1985
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Document Number |
Title |
Revision |
Publish Date |
Reviewed Date |
GL-85-22 |
Potential for Loss of Post-LOCA Recirculation Capability Due to Insulation Debris Blockage |
-- |
12/03/1985 |
-- |
GL-85-21 |
|
-- |
Not Issued |
-- |
GL-85-20 |
Resolution of Generic Issue 69: High Pressure Injection/Make-up Nozzle Cracking in Babcock And Wilcox Plants |
-- |
11/08/1985 |
-- |
GL-85-19 |
Reporting Requirements on Primary Coolant Iodine Spikes |
-- |
09/27/1985 |
-- |
GL-85-18 |
Operator Licensing Examinations |
|
81 FR 31969
05/20/2016 |
-- |
|
09/27/1985 |
GL-85-17 |
Availability of Supplements 2 and 3 to NUREG-0933, "A Prioritization of Generic Safety Issues" |
-- |
08/23/1985 |
-- |
GL-85-16 |
High Boron Concentrations |
-- |
08/23/1985 |
-- |
GL-85-15 |
Information on Deadlines for 10CFR50.49, "Environmental Qualification of Electric Equipment Important to Safety at Nuclear Power Plants" |
-- |
08/06/1985 |
-- |
GL-85-14 |
Commercial Storage at Power Reactor Sites of Low Level Radioactive Waste Not Generated by The Utility |
-- |
08/01/1985 |
-- |
GL-85-13 |
Transmittal of NUREG-1154 Regarding The Davis-Besse Loss of Main And Auxiliary Feedwater Event |
-- |
08/05/1985 |
-- |
GL-85-12 |
Implementation of TMI Action Item II.K.3.5, "Automatic Trip of Reactor Coolant Pumps |
-- |
06/28/1985 |
-- |
GL-85-11 |
Completion of Phase II of "Control of Heavy Loads at Nuclear Power Plants" NUREG-0612 |
-- |
06/28/1985 |
-- |
GL-85-10 |
Technical Specification for Generic Letter 83-28, Items 4.3 and 4.4 |
-- |
05/23/1985 |
-- |
GL-85-09 |
Technical Specifications for Generic Letter 83-28, Item 4.3 |
-- |
05/23/1985 |
-- |
GL-85-08 |
10 CFR 20.408 Termination Reports - Format |
-- |
05/23/1985 |
-- |
GL-85-07 |
Implementation of Integrated Schedules for Plant Modifications |
-- |
05/02/1985 |
-- |
GL-85-06 |
Quality Assurance Guidance for ATWS Equipment That is Not Safety-Related |
-- |
01/16/1985 |
-- |
GL-85-05 |
Inadvertent Boron Dilution Events |
-- |
01/31/1985 |
-- |
GL-85-04 |
Operating Licensing Examinations |
|
81 FR 31969
05/20/2016 |
-- |
|
01/28/1985 |
GL-85-03 |
Clarification of Equivalent Control Capacity for Standby Liquid Control Systems |
-- |
01/28/1985 |
-- |
GL-85-02 |
Staff Recommended Actions ... Regarding Steam Generator Tube Integrity |
-- |
04/17/1985 |
-- |
GL-85-01 |
Fire Protection Policy Steering Committee Report |
-- |
01/09/1985 |
-- |