Document Number |
Title |
Revision |
Publish Date |
Reviewed Date |
GL-86-17 |
Availability of NUREG-1169, "Technical Findings Related to Generic Issue C-8, BWR MSIC Leakage and Treatment Methods" |
-- |
10/17/1986 |
-- |
GL-86-16 |
Westinghouse ECCS Evaluation Models |
-- |
10/22/1986 |
-- |
GL-86-15 |
Information Relating to Compliance with 10 CFR 50.49 "Environmental Qualification of Electric Equipment Important to Safety for Nuclear Power Plants" |
-- |
09/22/1986 |
-- |
GL-86-14 |
Operator Licensing Examinations |
|
81 FR 31969
05/20/2016 |
-- |
|
08/20/1986 |
GL-86-13 |
Potential Inconsistency Between Plant Safety Analyses and Technical Specifications |
-- |
07/23/1986 |
-- |
GL-86-12 |
Criteria for Unique Purpose Exemption From Conversion From the Use of HEU Fuel |
-- |
07/03/1986 |
-- |
GL-86-11 |
Distribution of Products Irradiated in Research Reactors |
-- |
06/25/1986 |
-- |
GL-86-10 |
Implementation of Fire Protection Requirements |
S1 |
03/25/1994 |
-- |
-- |
04/24/1986 |
-- |
GL-86-09 |
Technical Resolution of Generic Issue B-59, (N-1) Loop Operation in BWRs and PWRs |
-- |
03/31/1986 |
-- |
GL-86-08 |
Availability of Supplement 4 to NUREG-0933, "A Prioritization of Generic Safety Issues" |
-- |
03/25/1986 |
-- |
GL-86-07 |
Transmittal of NUREG-1190 Regarding the San Onofre Unit 1 Loss of Power and Water Hammer Event |
-- |
03/20/1986 |
-- |
GL-86-06 |
Implementation of TMI Action Item II.K.3.5, "Automatic Trip of Reactor Coolant Pumps" |
-- |
05/29/1986 |
-- |
GL-86-05 |
Implementation of TMI Action Item II.K.3.5, "Automatic Trip of Reactor Coolant Pumps" |
-- |
05/29/1986 |
-- |
GL-86-04 |
Policy Statement On Engineering Expertise on Shift |
-- |
02/13/1986 |
-- |
GL-86-03 |
Applications for License Amendments |
-- |
02/10/1986 |
-- |
GL-86-02 |
Technical Resolution of Generic Issue B-19 - Thermal Hydraulic Stability |
-- |
01/23/1986 |
-- |
GL-86-01 |
Safety Concerns Associated with Pipe Breaks in the BWR Scram System |
-- |
01/03/1986 |
-- |