Secy No. |
Description |
SECY Paper |
SRM |
CVR |
Transcript |
SECY-97-304 |
Response to Staff Requirements Memorandum: SECY-97-144, "Potential Policy Issues Raised by Non-Owner Operators" |
|
|
|
|
SECY-97-303 |
"The Role of Industry (DSI-13)" and Use of Industry Initiatives |
|
|
|
|
SECY-97-302 |
Improving Access to Research Information |
|
|
|
|
SECY-97-301 |
Status Report of the Nuclear Regulatory Commission Task Force on Oversight of the Department of Energy, in Response to COMSECY- 96-053 - DSI 2 (Report No. 2) |
|
|
|
|
SECY-97-300 |
Proposed Strategy for Development of Regulations Governing Disposal of High-Level Radioactive Wastes in a Proposed Repository at Yucca Mountain, Nevada |
|
|
|
|
SECY-97-299 |
Laboratory Testing of Nuclear-Grade Activated Charcoal |
|
|
|
|
SECY-97-298 |
Revised Schedule for the Staff's Review of the AP600 Design Certification Application |
|
|
|
|
SECY-97-297 |
Weekly Information Report - Week Ending December 19, 1997 |
|
|
|
|
SECY-97-296 |
Status Report on Accident Sequence Precursor Program and Related Initiatives |
|
|
|
|
SECY-97-295 |
Two-Year Review of the Enforcement Policy, Proposed Revision to the Enforcement Policy, NUREG-1600, Rev.1 |
|
|
|
|
SECY-97-294 |
Response to Staff Requirements Memorandum of October 24, 1997, Regarding the Decision-Making Process at the Senior Management Meeting and the Benefits that the Process and the Watch List Provide in Terms of Public Health and Safety (M970919c) |
|
|
|
|
SECY-97-293 |
Walnut Creek Field Office (WCFO) Closure Plan |
|
|
|
|
SECY-97-292 |
Weekly Information Report - Week Ending December 12, 1997 |
|
|
|
|
SECY-97-291 |
Revising Rules on Generally Licensed and Exempt Products and the Manufacturers/distributors of These Products (10 CFR Parts 30, 31, and 32) |
|
|
|
|
SECY-97-290 |
Lessons Learned Concerning the Certification of the Gaseous Diffusion Plants |
|
|
|
|
|
SECY-97-289 |
Proposed NRC Generic Letter, "Degradation of Steam Generator Internals" |
|
|
|
|
SECY-97-288 |
Report to Congress on Abnormal Occurrences for Fiscal Year 1997 |
|
|
|
|
SECY-97-287 |
Final Regulatory Guidance on Risk-Informed Regulation:policy Issues |
|
|
|
|
SECY-97-286 |
Weekly Information Report - Week Ending December 5, 1997 |
|
|
|
|
SECY-97-285 |
Discussion of Resident Inspector Demographics and the Balance Between Expertise and Objectivity |
|
|
|
|
SECY-97-283 |
Recovery of Millstone Nuclear Power Station |
|
|
|
|
SECY-97-282 |
Results of the Staff's Evaluation of Ongoing Feedback from Licensees on the Impact of NRC's Activities on Licensees' Operations |
|
|
|
|
SECY-97-280 |
Proposed NRC Generic Letter, "Steam Generator Tube Inspection Techniques" |
|
|
|
|
SECY-97-279 |
Generic and Cumulative Environmental Impacts of Transportation of High-Level Waste (HLW) in the Vicinity of an HLW Repository (SRM M970612) |
|
|
|
|
SECY-97-277 |
Weekly Information Report - Week Ending November 28, 1997 |
|
|
|
|
SECY-97-274 |
Response to Request for Reconsideration or Delay of Implementation of the Portion of the Final Policy Statement on Restructuring and Economic Deregulation of the Electric Utility Industry Addressing Joint and Several Liability of Owners |
|
|
|
|
SECY-97-273 |
SECY-96-221 -- "Improving NRC's Control Over, and Licensees' Accountability for, Generally and Specifically Licensed Devices" |
|
|
|
|
SECY-97-272 |
Weekly Information Report - Week Ending November 21, 1997 |
|
|
|
|
SECY-97-271 |
Update on Status of Safety Evaluation Report on Proposed Reduction in Augmented Examination Requirements for Boiling Water Reactor Pressure Vessels Pursuant to 10 CFR 50.55A(g)(6)(Ii)(a) |
|
|
|
|
SECY-97-269 |
Weekly Information Report - Week Ending November 14, 1997 |
|
|
|
|
SECY-97-267 |
Weekly Information Report - Week Ending November 7, 1997 |
|
|
|
|
SECY-97-263 |
Request by New Mexico to Relinquish Authority for Sealed Source and Device Evaluation and Approval |
|
|
|
|
SECY-97-262 |
Rulemaking Plan - Minor Revision of 10 CFR Part 72.106 to Conform Dose Limits to 10 CFR Part 20 Methodology |
|
|
|
|
SECY-97-261 |
Weekly Information Report - Week Ending October 31, 1997 |
|
|
|
|
SECY-97-260 |
Resolution of Public Comments in Response to Request for Public Comments in the Federal Register Notice, "Safety Conscious Work Environment" |
|
|
|
|
SECY-97-258 |
Proposed Supplement to Generic Letter 96-06, "Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions" |
|
|
|
|
SECY-97-255 |
Weekly Information Report - Week Ending October 24, 1997 |
|
|
|
|
SECY-97-254 |
Pilot Program with the State of Arizona |
|
|
|
|
SECY-97-253 |
Policy options for nuclear power reactor financial qualifications in response to restructuring of the electric utility industry |
|
|
|
|
SECY-97-252 |
Final Rule - Deliberate Misconduct by Unlicensed Persons |
|
|
|
|
SECY-97-251 |
Proposed Rule on Nuclear Power Reactor Decommissioning Costs |
|
|
|
|
SECY-97-248 |
Briefing on the Business Process Redesign Project on the Redesigned Materials Licensing Process (SECY-97-034) |
|
|
|
|
SECY-97-247 |
Weekly Information Report - Week Ending October 17, 1997 |
|
|
|
|
SECY-97-246 |
Information on Staff Actions to Address Electric Grid Reliability Issues--WITS NO. 9700205 |
|
|
|
|
SECY-97-245 |
Staff Options for Resolving a Petition for Rulemaking (PRM-50-63) Relating to a Re-Evaluation of the Policy Regarding Use of Potassium Iodide (KI) After a Severe Accident at a Nuclear Power Plant |
|
|
|
|
SECY-97-244 |
Waste Classification of the Trojan Reactor Vessel |
|
|
|
|
SECY-97-243 |
U.S. - Russia Joint Coordinating Committee for Radiation Effects Research Project 2.3: "Deterministic Effects of Occupational Exposure to Radiation" |
|
|
|
|
SECY-97-242 |
Update on the Site Decommissioning Management Plan |
|
|
|
|
SECY-97-241 |
Redelegation of Authority |
|
|
|
|
SECY-97-240 |
Proposed Rulemaking Activity Plan |
|
|
|
|
SECY-97-239 |
Plan for Increased Cooperative Research with Industry and Other Federal Agencies (DSI-22) |
|
|
|
|
SECY-97-238 |
Weekly Information Report - Week Ending October 10, 1997 |
|
|
|
|
SECY-97-237 |
Memorandum of Understanding with the Department of Energy |
|
|
|
|
SECY-97-236 |
Proposed Retransfer of High Enriched Uranium (HEU) Scrap From Canada to the UK and Back to Canada for Medical Isotope Production at the NRU Reactor |
|
|
|
|
SECY-97-235 |
Supplemental Information to SECY 97-218, "Special Provisions for Transport of Large Quantities of Plutonium" |
|
|
|
|
SECY-97-234 |
Quarterly Status for the Probabilistic Risk Assessment Implementation Plan |
|
|
|
|
SECY-97-233 |
Response to Staff Requirements Memorandum of May 20, 1997, Regarding Cyclical Declines in Licensee Performance and the Use of Corporate-Wide Performance Data (M970425). |
|
|
|
|
SECY-97-232 |
Final Rule on Exempt Distribution and Use of a Radioactive Drug Containing One Microcurie of Carbon 14 Urea (Parts 30 and 32) |
|
|
|
|
SECY-97-231 |
Performance-Based Inspection Guidance and the Distinction Between Inspecting for Performance and Inspecting Against a Performance-Based Rule - Staff Response to Staff Requirements Memorandum Dated March 17, 1997 (ref. M970213A, paragraph 4) |
|
|
|
|
SECY-97-230 |
Weekly Information Report - Week Ending October 3, 1997 |
|
|
|
|
SECY-97-229 |
Graded Quality Assurance/Probabilistic Risk Assessment Implementation Plan for the South Texas Project Electric Generating Station |
|
|
|
|
SECY-97-228 |
Final Amendments to 10 CFR Part 73, "Changes to Nuclear Power Plant Security Requirements" |
|
|
|
|
SECY-97-227 |
Status of Staff Actions on Standard Review Plans for Antitrust Reviews and Financial Qualifications and Decommissioning-Funding-Assurance Reviews |
|
|
|
|
SECY-97-225 |
Enhancing NRC Effectiveness and Efficiency |
|
|
|
|
SECY-97-224 |
Creation of a Research Effectiveness Review Board |
|
|
|
|
SECY-97-222 |
Weekly Information Report - Week Ending September 26, 1997 |
|
|
|
|
SECY-97-221 |
Acceptance Guidelines and Consensus Standards for Use in Risk-Informed Regulation |
|
|
|
|
SECY-97-220 |
Implementation of DSI 22 Research |
|
|
|
|
SECY-97-219 |
Order Modifying License to Convert from High-Enriched to Low-Enriched Uranium Fuel (University of Massachusetts Lowell) |
|
|
|
|
SECY-97-218 |
Special Provisions for Transport Of Large Quantities of Plutonium (Response to Staff Requirements Memorandum - SECY-96-215) |
|
|
|
|
SECY-97-217 |
Proposed Generic Letter Entitled "Assurance of Sufficient Net Positive Suction Head for Emergency Core Cooling and Containment Heat Removal Pumps," as Revised to Reflect Public Comments |
|
|
|
|
SECY-97-216 |
Standard Review Plan for License Renewal |
|
|
|
|
SECY-97-215 |
Weekly Information Report - Week Ending September 19, 1997 |
|
|
|
|
SECY-97-214 |
Changes to 10 CFR Part 72, Expand Applicability to Include Certificate Holders and Applicants and Their Contractors and Subcontractors |
|
|
|
|
SECY-97-213 |
Year 2000 Computer Issue |
|
|
|
|
SECY-97-212 |
Agreement State Program Status Assessment |
|
|
|
|
SECY-97-211 |
Milestones for Revising 10 CFR Part 70 |
|
|
|
|
SECY-97-210 |
Weekly Information Report - Week Ending September 12, 1997 |
|
|
|
|
SECY-97-208 |
Elevation of the Core Damage Frequency Objective to a Fundamental Commission Safety Goal |
|
|
|
|
SECY-97-206 |
Status Report of the Nuclear Regulatory Commission Task Force on Oversight of the Department of Energy, in Response to COMSECY- 96-053 - DSI 2 |
|
|
|
|
SECY-97-205 |
Integration and Evaluation of Results From Recent Lessons-Learned Reviews |
|
|
|
|
SECY-97-202 |
Weekly Information Report - Week Ending September 5, 1997 |
|
|
|
|
SECY-97-201 |
Changes to Paragraph (h) of 10 CFR Part 50.55a, "Codes and Standards" |
|
|
|
|
SECY-97-200 |
Weekly Information Report - Week Ending August 29, 1997 |
|
|
|
|
SECY-97-197 |
Equal Employment Opportunity (EEO) Briefing |
|
|
|
|
SECY-97-196 |
Weekly Information Report - Week Ending August 22, 1997 |
|
|
|
|
SECY-97-195 |
Rulemaking Plan: 10 CFR Part 76, "Certification Amendment Process" |
|
|
|
|
SECY-97-194 |
Memorandum of Understanding Between the Nuclear Regulatory Commission and the Department of Energy on Cooperation Regarding the Gaseous Diffusion Plants |
|
|
|
|
SECY-97-193 |
Assistance to the U.S. Department of Energy's Fissile Materials Disposition Program |
|
|
|
|
SECY-97-192 |
Peer Review of the Arthur Andersen Methodology and Use 0f Trending Letters |
|
|
|
|
SECY-97-190 |
Draft Regulatory Guide and Standard Review Plan on Risk-Informed Inservice Inspection of Piping |
|
|
|
|
SECY-97-189 |
Weekly Information Report - Week Ending August 15, 1997 |
|
|
|
|
SECY-97-188 |
Formerly Licensed Sites Identified for Further Investigation in Agreement States |
|
|
|
|
SECY-97-187 |
NMSS Policy and Procedures Letter "Procedure for Preparing the Annual Report to Congress on the Gaseous Diffusion Plants" |
|
|
|
|
SECY-97-186 |
Changes to the Financial Protection Requirements for Permanently Shutdown Nuclear Power Reactors, 10 CFR 50.54(w) and 10 CFR 140.11 |
|
|
|
|
SECY-97-185 |
Weekly Information Report - Week Ending August 8, 1997 |
|
|
|
|
SECY-97-184 |
Proposed Reactor Export Licenses to Combustion Engineering, Inc. to Supply Major Components and Equipment for Four Nuclear Reactor Units in the Republic of Korea -- Applications XR162 and XR163 |
|
|
|
|
SECY-97-183 |
Criteria for Funding Agreement State Training, Travel and Technical Assistance |
|
|
|
|
|
SECY-97-181 |
Implementation of New IAEA Safeguards Measures in the United States |
|
|
|
|
SECY-97-180 |
Response to Staff Requirements Memorandum of May 28, 1997, Concerning Briefing on IPE Insight Report |
|
|
|
|
SECY-97-178 |
Weekly Information Report - Week Ending August 1, 1997 |
|
|
|
|
SECY-97-177 |
Final Rulemaking Plan: Revision of Dose Limit for Members of the Public Exposed to Hospitalized Patients (10 CFR Part 20 and 35) |
|
|
|
|
SECY-97-175 |
NRC Participation in the OECD/NEA Sponsored Rasplav-Phase Ii Project at the Russian Research Center (I.V. Kurchatov Institute) |
|
|
|
|
SECY-97-174 |
NRC Employee Ownership of Energy or Utility Sector Mutual Funds |
|
|
|
|
SECY-97-173 |
Potential Revision to 10 CFR 50.65(a)(3) of the Maintenance Rule to Require Licensees to Perform Safety Assessments |
|
|
|
|
SECY-97-172 |
The Maintenance Rule: Monitoring the Quality of 10 CFR 50.65(a)(3) and Methods for Monitoring its Efficacy |
|
|
|
|
SECY-97-171 |
Consideration of Severe Accident Risk in NRC Regulatory Decisions |
|
|
|
|
SECY-97-170 |
Weekly Information Report - Week Ending July 25, 1997 |
|
|
|
|
SECY-97-169 |
Proposed Change to the Independent Radiation Monitoring Program Under which the NRC Contracts with States to Monitor the Environment Around NRC-Licensed Facilities |
|
|
|
|
SECY-97-168 |
Issuance for Public Comment of Proposed Rulemaking Package for Shutdown and Fuel Storage Pool Operation |
|
|
|
|
SECY-97-167 |
DSI 22 Implementation (Role of the Office of Research) |
|
|
|
|
SECY-97-166 |
Recovery of Millstone Nuclear Power Station |
|
|
|
|
SECY-97-165 |
Ralph L. Tetrick, Atomic Safety and Licensing Board Initial Decision, Memorandum and Order Denying Reconsideration and Stay, and Order on Remand: LBP-97-2, LBP-97-6, LBP-97-11 |
|
|
|
|
SECY-97-164 |
Shipment of Decommissioned Reactor Vessel, Containing Irradiated Internals, from the Trojan Nuclear Plant to Hanford Nuclear Reservation, Richland, Washington |
|
|
|
|
SECY-97-161 |
Transportation of Radioactive Material: Program Status and Current and Future Issues |
|
|
|
|
SECY-97-160 |
Staff Review of Licensee Responses to the 10 CFR 50.54(f) Request Regarding the Adequacy and Availability of Design Bases Information |
|
|
|
|
SECY-97-159 |
Staff Requirements Memorandum (SRM) Dated February 21, 1997, Re: Briefing for Commission on Codes and Standards, January 22, 1997 |
|
|
|
|
SECY-97-158 |
Quarterly Status for the Probabilistic Risk Assessment Implementation Plan |
|
|
|
|
SECY-97-157 |
Weekly Information Report - Week Ending July 18, 1997 |
|
|
|
|
SECY-97-156 |
Application of Federal Government-Wide Conflict of Interest Requirements and NRC Enforcement Policy on Licensee Integrity Issues to Agreement State Programs |
|
|
|
|
SECY-97-155 |
Staff's Action Regarding Exemptions from 10 CFR 70.24 for Commercial Nuclear Power Plants |
|
|
|
|
SECY-97-154 |
Resolution of Licensing Support System (LSS) Issues and Draft Proposed Rule, 10 CFR Part 2, Subpart J |
|
|
|
|
SECY-97-152 |
Status of Safety Evaluation Report on Proposed Reduction in Augmented Examination Requirements for Boiling Water Reactor Pressure Vessels Pursuant to 10 CFR 50.55a(g)(6)(Ii)(A) (SRM M970512b) |
|
|
|
|
SECY-97-150 |
Weekly Information Report - Week Ending July 11, 1997 |
|
|
|
|
SECY-97-149 |
Nuclear Safety Research Review Committee (NSRRC) |
|
|
|
|
SECY-97-148 |
Recommendation on Need for Rule on Advanced Light Water Reactor Severe Accident Performance |
|
|
|
|
SECY-97-147 |
Re-Evaluation of SECY-96-199 Issues; Plan to Better Focus Resources on High Priority Discrimination Cases |
|
|
|
|
SECY-97-146 |
NRC'S Mandated and Non-Mandated Activities and Revisions to Agency Policy on Performing Reimbursable Work for Others |
|
|
|
|
SECY-97-145 |
The Evaluation of Current State Agreements |
|
|
|
|
SECY-97-144 |
Potential Policy Issues Raised by Non-Owner-Operators |
|
|
|
|
SECY-97-142 |
Weekly Information Report - Week Ending July 4, 1997 |
|
|
|
|
SECY-97-141 |
Atlas Corporation; Docket No. 40-3453-MLA; LBP-97-9, Memorandum and Order |
|
|
|
|
SECY-97-140 |
Memorandum of Understanding and Interagency Agreement, Between the U.S. Department of Energy and the U.S. Nuclear Regulatory Commission, on Aluminum-Based Research Reactor Spent Nuclear Fuel |
|
|
|
|
SECY-97-139 |
Proposed Rule: License Applications for Certain Items Containing Byproduct Material (10 CFR PART 32) |
|
|
|
|
SECY-97-138 |
Termination of Fort St. Vrain Nuclear Generating Station Operating License |
|
|
|
|
SECY-97-137 |
Proposed Resolution to Petition for Rulemaking Filed by the Nuclear Energy Institute |
|
|
|
|
SECY-97-136 |
Removal of the Anne Arundel County/Curtis Bay Depot Site from the Site Decommissioning Management Plan |
|
|
|
|
SECY-97-135 |
Weekly Information Report - Week Ending June 27, 1997 |
|
|
|
|
SECY-97-134 |
Commercial Use of NRC-Developed Thermal-Hydraulic Codes by Non-U.S. Organizations |
|
|
|
|
SECY-97-133 |
Weekly Information Report - Week Ending June 20, 1997 |
|
|
|
|
SECY-97-132 |
Status of the Integration Plan for Closure of Severe Accident Issues and the Status of Severe Accident Research |
|
|
|
|
SECY-97-131 |
Supplemental Information on SECY-97-115, "Program for Revision of 10 CFR Part 35, 'Medical Uses of Byproduct Material,' and Associated Federal Register Notice" |
|
|
|
|
SECY-97-128 |
Removal of the Army Research Laboratory Portion of the Watertown Arsenal/Mall Site from the Site Decommissioning Management Plan |
|
|
|
|
SECY-97-127 |
Development of a Risk-Informed, Performance-Based Regulation for Fire Protection at Nuclear Power Plants |
|
|
|
|
SECY-97-126 |
Weekly Information Report - Week Ending June 13, 1997 |
|
|
|
|
|
SECY-97-125 |
Comments on the Draft Branch Technical Position on Low-Level Radioactive Waste Performance Assessment (NUREG-1573) |
|
|
|
|
SECY-97-124A |
Additional Information Regarding the Federal Policy on Potassium Iodide |
|
|
|
|
SECY-97-124 |
Proposed Federal Policy Regarding Use of Potassium Iodide after a Severe Accident at a Nuclear Power Plant |
|
|
|
|
SECY-97-123 |
Improving Opportunities for Universities to Participate in the NRC Research Program |
|
|
|
|
SECY-97-122 |
Integrated Review of the NRC Assessment Process for Operating Commercial Nuclear Reactors |
|
|
|
|
SECY-97-121 |
Weekly Information Report - Week Ending June 6, 1997 |
|
|
|
|
SECY-97-120 |
Rulemaking Plan for Emergency Planning Requirements for Permanently Shutdown Nuclear Power Plant Sites 10 CFR Part 50.54(q) and (T); 10 CFR 50.47; and Appendix E to 10 CFR Part 50 |
|
|
|
|
SECY-97-119 |
Status of the NRC Recycle and Reuse Staff Action Plan |
|
|
|
|
SECY-97-118 |
Activities Associated with Implementation of 10 CFR Part 54 |
|
|
|
|
SECY-97-117 |
Final Policy Statement on Restructuring and Economic Deregulation of the Electric Utility Industry |
|
|
|
|
SECY-97-116 |
Weekly Information Report - Week Ending May 30, 1997 |
|
|
|
|
SECY-97-115 |
Program for Revision of 10 CFR Part 35, "Medical Uses of Byproduct Material" and Associated Federal Register Notice |
|
|
|
|
SECY-97-114 |
Litigation Report - 1997 - 2 |
|
|
|
|
SECY-97-113 |
Annual Report on the Status of Prematurely Shut down Plants |
|
|
|
|
SECY-97-112 |
COMSECY-96-027 - Strategic Assessment Issue Paper: Staffing and Core Capabilities (DSI-18) |
|
|
|
|
SECY-97-111 |
Rulemaking Plan: Energy Compensation Sources for Well Logging and Clarifications - Changes to 10 CFR Part 39 |
|
|
|
|
SECY-97-110 |
Status Report on Implementation of Dam Safety Program |
|
|
|
|
SECY-97-109 |
Technical Assistance Request from the University of Missouri-Columbia License Amendment Regarding Uranium-238 Use |
|
|
|
|
SECY-97-108 |
Weekly Information Report - Week Ending May 23, 1997 |
|
|
|
|
SECY-97-107 |
Weekly Information Report - Week Ending May 16, 1997 |
|
|
|
|
SECY-97-106 |
Progress of Resolution of Generic Safety Issues |
|
|
|
|
SECY-97-105 |
Weekly Information Report - Week Ending May 9, 1997 |
|
|
|
|
SECY-97-102 |
Proposed Rule on Financial Assurance Requirements for Decommissioning Nuclear Power Reactors |
|
|
|
|
SECY-97-101 |
Proposed Rule, 10 CFR Section 50.76, "Reporting Reliability and Availability Information for Risk-Significant Systems and Equipment" |
|
|
|
|
SECY-97-100 |
Weekly Information Report - Week Ending May 2, 1997 |
|
|
|
|
SECY-97-099 |
Transmittal of the Staff's Safety Evaluation of DOE'S Report on Tritium-Producing Burnable Absorber Rod Lead Test Assemblies |
|
|
|
|
SECY-97-097 |
Additional Alternative for Regulating the Safety of Fuel Cycle Facilities: Nuclear Energy Institute Petition for Rulemaking |
|
|
|
|
SECY-97-096 |
Memorandum of Understanding and Interagency Agreement Between the U.S. Department of Energy and the U.S. Nuclear Regulatory Commission on the Closure of High-Level Waste Storage Tanks at the Savannah River Site |
|
|
|
|
SECY-97-095 |
Probabilistic Risk Assessment Implementation Plan Pilot Application for Risk-Informed Technical Specifications |
|
|
|
|
SECY-97-093 |
Weekly Information Report - Week Ending April 25, 1997 |
|
|
|
|
SECY-97-092 |
Proposed NRC Generic Letter Titled "Revised Contents of the Monthly Operating Report" |
|
|
|
|
SECY-97-091 |
Draft Rulemaking Plan: Revision of Dose Limit for Members of the Public Exposed to Hospitalized Patients (10 CFR PART 20) (PRM-20-24) |
|
|
|
|
SECY-97-090 |
Proposed Rule: Exempt Distribution and Use of a Radioactive Drug Containing One Microcurie of Carbon 14 Urea (Parts 30 and 32) |
|
|
|
|
SECY-97-089 |
Weekly Information Report - Week Ending April 18, 1997 |
|
|
|
|
SECY-97-088 |
NRC Staff's Position on Augmented Examination Requirements for Boiling Water Reactor Pressure Vessels Pursuant to 10 CFR 50.55a(g)(6)(ii)(A) |
|
|
|
|
SECY-97-087 |
Oklahoma Agreement State Negotiations: State Requests That Major Facilities Undergoing Site Decommissioning Not be Relinquished to State |
|
|
|
|
SECY-97-085 |
Proposed Agreement for Cooperation Between the U.S. and Switzerland |
|
|
|
|
SECY-97-084 |
Weekly Information Report - Week Ending April 11, 1997 |
|
|
|
|
SECY-97-083 |
Classification of Hanford Low-Activity Tank Waste Fraction as Incidental |
|
|
|
|
SECY-97-082 |
Performance Issues Related to Ownership Structure |
|
|
|
|
SECY-97-079 |
Proposed Rule - Initial Licensed Operator Examination Requirements |
|
|
|
|
SECY-97-078 |
Weekly Information Report - Week Ending April 4, 1997 |
|
|
|
|
SECY-97-077 |
Draft Regulatory Guides, Standard Review Plans and NUREG Document in Support of Risk Informed Regulation for Power Reactors |
|
|
|
|
SECY-97-076 |
Quarterly Status Update for the Probabilistic Risk Assessment (PRA) Implementation Plan |
|
|
|
|
SECY-97-075 |
Methodology and Criteria for Evaluating Core Research Capabilities |
|
|
|
|
SECY-97-073 |
Comments on the U.S. Environmental Protection Agency's Advance Notice of Proposed Rulemaking for the Decision on Whether the Waste Isolation Pilot Plant Complies with the 40 CFR Part 191 Disposal Regulations and the 40 CFR Part 194 Compliance Criteria |
|
|
|
|
SECY-97-072 |
Staff Action Plan to Improve the Senior Management Meeting Process |
|
|
|
|
SECY-97-071 |
Information Paper: Procedures to Ensure That Certification of Privatized U.S. Enrichment Corporation Meets Requirements of the USEC Privatization Act |
|
|
|
|
SECY-97-070 |
Weekly Information Report - Week Ending March 28, 1997 |
|
|
|
|
SECY-97-069 |
Rulemaking Plan: Miscellaneous Changes to 10 CFR Part 72 and Amendment to 10 CFR Part 40 to Remove Natural or Depleted Uranium Used in Storage Cask Shielding from Part 40 Licensing Requirements |
|
|
|
|
SECY-97-068 |
Removal of the Department of the Army Aberdeen Proving Ground, Maryland Site from the Site Decommissioning Management Plan |
|
|
|
|
SECY-97-067 |
Weekly Information Report - Week Ending March 21, 1997 |
|
|
|
|
SECY-97-065 |
Weekly Information Report - Week Ending March 14, 1997 |
|
|
|
|
SECY-97-064 |
Request for Funds So as to Make Available Nuclear Regulatory Commission Documents Related to Human Radiation Experiments |
|
|
|
|
SECY-97-063 |
Proposed NRC Generic Letter: "Degradation of Control Rod Drive Mechanism and Other Vessel Closure Head Penetrations" |
|
|
|
|
SECY-97-062 |
Proposed Rulemaking Activity Plan |
|
|
|
|
SECY-97-061 |
Removal of Texas Instruments, Inc. from Site Decommissioning Management Plan |
|
|
|
|
SECY-97-060 |
Weekly Information Report - Week Ending March 7, 1997 |
|
|
|
|
SECY-97-058 |
U.S. Department of Energy's Revised General Guidelines for the Recommendation of Sites for Nuclear Waste Repositories (10 CFR Part 960) |
|
|
|
|
SECY-97-057 |
Weekly Information Report - Week Ending February 28, 1997 |
|
|
|
|
SECY-97-056 |
Interim Storage for Greater than Class C Waste, Changes to 10 CFR Part 72 |
|
|
|
|
SECY-97-055 |
Maintenance Rule Status, Results, and Lessons Learned |
|
|
|
|
SECY-97-054 |
Final Recommendations on Policy Statements and Implementing Procedures For: "Statement of Principles and Policy for the Agreement State Program" and "Policy Statement on Adequacy and Compatibility of Agreement State Programs" |
|
|
|
|
SECY-97-052 |
Committee to Review Generic Requirements (CRGR) - Scope of Review and Periodic Review of Activities |
|
|
|
|
SECY-97-051 |
Schedule for the Staff's Review of the AP600 Design Certification Application |
|
|
|
|
SECY-97-050 |
Status of NRC Research Conducted by the Russian Research Center (I.V. Kurchatov Institute) and the Institute of Nuclear Safety of the Russian Academy of Sciences |
|
|
|
|
SECY-97-049 |
Proposed License to Export Graphite and Depleted Uranium to Canada for AVLIS Feed Conversion Process Development (XMAT0393) |
|
|
|
|
SECY-97-048 |
Weekly Information Report - Week Ending February 21, 1997 |
|
|
|
|
SECY-97-047 |
Changes to 10 CFR 71.63, Requirements for Shipping Packages Used to Transport Vitrified High-Level Waste |
|
|
|
|
SECY-97-046A |
Final Rule on Radiological Criteria for License Termination |
|
|
|
|
SECY-97-045 |
Final Rule - Reporting Requirements for Unauthorized Use of Licensed Radioactive Material and Revision to the NRC Enforcement Policy |
|
|
|
|
SECY-97-044 |
Policy and Key Technical Issues Pertaining to the Westinghouse AP600 Standardized Passive Reactor Design |
|
|
|
|
SECY-97-043 |
Weekly Information Report - Week Ending February 14, 1997 |
|
|
|
|
SECY-97-042 |
Response to OIG Event Inquiry 96-04S Regarding Maine Yankee |
|
|
|
|
SECY-97-041 |
Proposed Amendments to 10 CFR Parts 30, 40, 50, 70, and 72-Self-Guarantee of Decommissioning Funding by Non-Profit and Non-Bond Issuing Licensees |
|
|
|
|
SECY-97-040 |
Litigation Report - 1997 - 1 |
|
|
|
|
SECY-97-039 |
Weekly Information Report - Week Ending February 7, 1997 |
|
|
|
|
SECY-97-038 |
Renewal of Licenses for Nuclear Metals, Inc. |
|
|
|
|
SECY-97-037 |
Assessment of the Quality Management Program and Misadministrations Rule |
|
|
|
|
SECY-97-036 |
Millstone Lessons Learned Report, Part 2: Policy Issues |
|
|
|
|
SECY-97-035 |
Proposed Regulatory Guidance Related to Implementation of 10 CFR 50.59 (Changes, Tests and Experiments) |
|
|
|
|
SECY-97-034 |
Briefing on Progress of Materials Licensing Business Project Redesign Pilot Program |
|
|
|
|
SECY-97-033 |
Annual Status Report on the Administration of NRC's Requalification Program and Initial Operator Licensing Examinations (WITS 8800098) |
|
|
|
|
SECY-97-032 |
Agreement Between the Commonwealth of Massachusetts and the Commission Pursuant to Section 274 of the Atomic Energy Act of 1954, as Amended |
|
|
|
|
SECY-97-031 |
Final Rulemaking Plan: Exempt Distribution and Use of a Radioactive Drug Containing One Microcurie of Carbon 14 Urea (Parts 30 and 32) |
|
|
|
|
SECY-97-030 |
Weekly Information Report - Week Ending January 31, 1997 |
|
|
|
|
SECY-97-029 |
Abnormal Occurrence Reports: Implementation of Section 208 Energy Reorganization Act of 1974; Revision to Policy Statement |
|
|
|
|
SECY-97-028 |
Rulemaking Plan for Revision of Prototype Testing Requirements for Hands, Dials, and Pointers Using Tritium: Response to PRM-32-4 to Put Timepieces with Gaseous Tritium Light Sources on the Same Regulatory Basis as Timepieces with Luminous Tritium Paint |
|
|
|
|
SECY-97-027 |
NRC Participation in the OECD/NEA Sponsored Rasplav-phase II Project at the Russian Research Center (I.V. Kurchatov Institute) |
|
|
|
|
SECY-97-026 |
Annual Report on Commission Adjudication |
|
|
|
|
SECY-97-023 |
Report to Congress on Abnormal Occurrences for Fiscal Year 1996 |
|
|
|
|
SECY-97-022 |
Weekly Information Report - Week Ending January 24, 1997 |
|
|
|
|
SECY-97-021 |
Equal Employment Opportunity (EEO) Briefing |
|
|
|
|
SECY-97-020 |
Results of Evaluation of Emergency Planning for Evolutionary and Advanced Reactors |
|
|
|
|
SECY-97-019 |
Removal of RTI, Inc., from Site Decommissioning Management Plan |
|
|
|
|
SECY-97-018 |
Weekly Information Report - Week Ending January 17, 1997 |
|
|
|
|
SECY-97-017 |
U.S. Nuclear Regulatory Commission High-Level Radioactive Waste Program, Annual Progress Report, Fiscal Year 1996 |
|
|
|
|
SECY-97-016 |
Litigation Report as of January 17, 1997 |
|
|
|
|
SECY-97-015 |
Removal of the Babcock & Wilcox Apollo Site from the Site Decommissioning Management Plan |
|
|
|
|
SECY-97-011 |
Weekly Information Report - Week Ending January 10, 1997 |
|
|
|
|
SECY-97-010 |
Appointment of New Member to Licensing Support System Advisory Review Panel |
|
|
|
|
SECY-97-009 |
Quarterly Status Update for the Probabilistic Risk Assessment (PRA) Implementation Plan |
|
|
|
|
SECY-97-007 |
Weekly Information Report - Week Ending January 3, 1997 |
|
|
|
|
SECY-97-006 |
Followup to the Annual Report on Allegations and Responses to Recommendations of the Millstone Independent Review Group |
|
|
|
|
SECY-97-003 |
Millstone Restart Review Process |
|
|
|
|
SECY-97-002 |
Memorandum of Understanding Between the Nuclear Regulatory Commission and the Department of Energy for Cooperation and Support of the Department of Energy Hanford Tank Waste Remediation System Privatization Activities |
|
|
|
|
SECY-97-001 |
Weekly Information Report - Week Ending December 27, 1996 |
|
|
|
|
COMSECY-97-033 |
Draft Press Release and Federal Register Notice to Solicit Qualified Candidates for the Advisory Committee on Reactor Safeguards |
|
|
|
|
COMSECY-97-030 |
S.981, the Regulatory Improvement Act of 1997 |
|
|
|
|
COMSECY-97-028 |
SECY-97-245 and SECY-98-061 - Staff Options for Resolving a Petition for Rulemaking (PRM-50-63 AND 50-63A) Relating to a Re-Evaluation of the Policy Regarding the Use of Potassium Iodide (KI) by the General Public after a Severe Accident at a Nuclear Power Plant and COMSECY-97-028 - Federal Register Notice on Potassium Iodide |
|
|
|
|
COMSECY-97-013 |
COMSECY-97-013 - Steam Generator Rulemaking |
|
|
|
|
COMNJD-97-007
COMEXM-97-004 |
Streamlining NRC Adjudications |
|
|
|
|
|
COMSAJ-97-008 |
COMSAJ-97-008 - Discussion on Safety and Compliance |
|
|
|
|
COMNJD-97-006 |
Commission Procedures: Further Issues |
|
|
|
|
COMNJD-97-003 |
Reevaluation of the Role of the Advisory Committee on Reactor Safeguards (ACRS) |
|
|
|
|
COMNJD-97-001 |
Clarity of Public Communications |
|
|
|
|
Commissioner McGaffigan's Vote |
|
|
|
|
COMEXM-97-002 |
COMEXM-97-002 - NRC Action with Regard to Ward Valley Low Level Waste (LLW) Disposal Site |
|
|
|
|