ACRS 1961 Letter Reports

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Title
12/13/1961 Reactor Site Criteria
12/13/1961 Report on PM-2A
11/01/1961 Review of Clean Critical Experiments
11/01/1961 Report on the Peach Bottom Atomic Power Station - Philadelphia Electric Company
11/01/1961 Report on Consolidated Edison Reactor
11/01/1961 Report on Heavy Water Components Test Reactor
10/28/1961 Report on Hallam Nuclear Power Facility - Dry Critical Experiments
09/11/1961 Report on Sites for Reactors for City of Los Angeles Department of Water and Power
09/11/1961 Report on Molten Salt Reactor Experiment
09/11/1961 Report on PM-3A
09/11/1961 Nuclear Reactor System Mechanical Design
09/11/1961 Report on Borax V 1961-Sep-11
09/11/1961 Report on National Bureau of Standards Reactor
09/09/1961 Report on Low Temperature Process Heat Reactor
08/03/1961 Report on Elk River Reactor - RCPA
07/08/1961 Report on Ordnance Corps Research Reactor at Picatinny Arsenal
07/08/1961 Radiation Damage to Pressure Vessel (SM-1 Reactor)
07/08/1961 Report on PM-1 Nuclear Power Plant
07/08/1961 Report on Saxton Nuclear Experimental Program
07/08/1961 Report on Brookhaven High Flux Beam Research Reactor
05/22/1961 Report on Yankee Atomic Electric Company, Rowe, Massachusetts
05/20/1961 Report on Piqua Nuclear Power Facility, Piqua, Ohio
05/20/1961 Report on Dairyland Power Cooperative Site for Improved Cycle Boiling Water Reactor
05/20/1961 Report on Vallecitos Experimental Superheat Reactor (VESR)
04/10/1961 Report on Sandia Pulsed Reactor Facility
04/10/1961 Report on Sites for a 200 MW Thermal Organic Cooled Prototype Reactor
04/08/1961 Report on Dresden Nuclear Power Station
04/08/1961 Joint Committee's Staff Study On Improving The AEC Regulatory Process
03/14/1961 Letter to Honorable Glenn T. Seaborg
03/04/1961 Report on Radiation Effects Reactor (RER)
03/04/1961 Report on Dresden Nuclear Power Station
03/04/1961 Report on Consolidated Edison Reactor Design
03/04/1961 Westinghouse Testing Reactor (WTR)
03/04/1961 Reactor Accidents
03/04/1961 Report on Elk River Reactor - RCPA
01/16/1961 Multiple Reactor Units (Camp Pendleton)
01/14/1961 Improved Cycle Boiling Water Reactor
01/14/1961 Advisory Committee on Reactor Safeguards Records Pertaining to Safety Review of ALPR (SL-1)

Page Last Reviewed/Updated Wednesday, July 30, 2025