ACRS 1960 Letter Reports

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Title
12/13/1960 Pool-Type Reactors
12/13/1960 Shippingport Pressurized Water Reactor
12/13/1960 Regulation and Safety Of Nuclear Reactors
12/13/1960 Report on N.S. Savannah
12/13/1960 Site Criteria For Nuclear Reactors
12/10/1960 Report on Radiation Effects Reactor (RER)
12/10/1960 Peach Bottom Atomic Power Station - Philadelphia Electric Company
12/09/1960 Letter To Honorable John A. McCone
11/14/1960 Letter To Leslie Silverman
11/07/1960 Report on NASA Plum Brook Facility
11/07/1960 Report on Fort Greely (SM-1A) Reactor Facility
11/07/1960 Report on Advanced Test Reactor
11/05/1960 Report on Big Rock Plant - Consumers Power Company
11/05/1960 Report on Northern States Power Company - (Pathfinder)
11/04/1960 Letter to Honorable John A. McCone
10/22/1960 Reactor Site Criteria
10/14/1960 Letter To A. R. Luedecke
09/26/1960 National Aeronautics and Space Administration - (NASA)
09/26/1960 Saxton Nuclear Experimental Corporation
09/26/1960 Brookhaven High Flux Beam Research Reactor
09/26/1960 Sodium Reactor Experiment (SRE)
09/26/1960 Criteria For Evaluation Of Reactor Sites
09/26/1960 Borax V
09/26/1960 DASA-TRIGA Reactor at National Naval Medical Center
09/24/1960 Dresden Atomic Power Station - Commonwealth Edison Company (1)
07/27/1960 Humboldt Bay Power Plant - Pacific Gas and Electric Company
07/25/1960 NASA Plum Brook Facility
07/25/1960 High Flux Isotope Reactor (HFIR)
07/25/1960 Dairyland Site Near Genoa, Wisconsin, For the Small Pressurized Water Reactor, (SPWR)
07/25/1960 High Flux Isotope Reactor (HFIR)
07/25/1960 NASA Plum Brook Facility
07/25/1960 Improved Cycle Boiling Water Reactor (1)
07/25/1960 N.S. Savannah (1)
07/25/1960 Dairyland Site Near Genoa, Wisconsin, for the Small Pressurized Water Reactor, (SPWR)
07/25/1960 Southern California Edison Company Power Reactor Sites (1)
06/30/1960 Small Size Pressurized Water Reactor, Jamestown, New York, Site
06/27/1960 Yankee Nuclear Power Station - Yankee Atomic Electric Company
06/27/1960 Improved Cycle Boiling Water Reactor (ICBWR) - Department of Water and Power of the City of Los Angeles
06/25/1960 Army Package Power Reactor, SM-1
06/13/1960 Special Meeting of the Advisory Committee on Reactor Safeguards Held in Boston, Massachusetts, on June 7, 1960
06/08/1960 Improved Cycle Boiling Water Reactor (ICBWR) - Department of Water and Power of the City of Los Angeles
05/09/1960 High Flux Isotope Reactor (HFIR)
05/09/1960 Yankee Nuclear Power Station - Yankee Atomic Electric Company
05/09/1960 Plutonium Recycle Test Reactor (PRTR)
05/06/1960 Commonwealth Edison Company - Dresden Nuclear Power Station
05/06/1960 Control Rods
03/14/1960 Peach Bottom Atomic Power Station - Philadelphia Electric Company
03/14/1960 Small Size Pressurized Water Reactor, Jamestown, New York, Site
03/14/1960 NASA Plum Brook Reactor Facility
03/14/1960 Big Rock Plant - Consumers Power Company
03/14/1960 Boiling Nuclear Superheater (BONUS) Power Station
03/14/1960 Humboldt Bay Power Plant - Pacific Gas and Electric Company
03/06/1960 Nuclear Power Plants in California
02/08/1960 Hallam Nuclear Power Facility (HNPF)
02/08/1960 General Electric Vallecitos Boiling Water Reactor (GEVBWR)
02/01/1960 Carolinas Virginia Tube Reactor (CVTR) - Exclusion Area
02/01/1960 Plutonium Recycle Test Reactor (PRTR)(2)
02/01/1960 Northern States Power Company - Pathfinder Atomic Power Plant
02/01/1960 Yankee Nuclear Power Station - Yankee Atomic Electric Company
02/01/1960 Nuclear Merchant Ship (N.S. Savannah)
02/01/1960 Plutonium Recycle Test Reactor (PRTR)
01/21/1960 Nuclear Merchant Ship (N.S. Savannah)
01/04/1960 The ACRS Subcommittee Procedures

Page Last Reviewed/Updated Wednesday, July 30, 2025