Document Number | Title | Revision | Publish Date | Revision Date |
---|
BL-77-08 | Assurance of Safety and Safeguards During an Emergency – Locking Systems | -- | 12/28/1977 | -- |
BL-77-07 | Containment Electrical Penetration Assemblies at Nuclear Power Plants under Construction | -- | 12/19/1977 | -- |
BL-77-06 | Potential Problems with Containment Electrical Penetration Assemblies | -- | 11/22/1977 | -- |
BL-77-05 | Electrical Connector Assemblies | 1 | 11/14/1977 | -- |
-- | 11/08/1977 | -- |
BL-77-04 | Calculational Error Affecting ...Performance of a System for Controlling pH of Containment Sump Water Following a LOCA | -- | 11/04/1977 | -- |
BL-77-03 | On-Line Testing of the Westinghouse W Solid State Protection System (SSPS) | -- | 09/12/1977 | -- |
BL-77-02 | Potential Failure Mechanism in Certain Westinghouse (W) AR Relays with Latch Attachments | -- | 09/12/1977 | -- |
BL-77-01 | Pneumatic Time Delay Relay Setpoint Drift | -- | 04/29/1977 | -- |