The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Bulletins: 1980 Index

Document Number Title Revision Publish Date Reviewed Date
BL-80-25 Operating Problems with Target Rock Safety-Relief Valves at BWRs -- 12/19/1980 --
BL-80-24 Prevention of Damage Due to Water Leakage Inside Containment (October 17, 1980 Indian Point 2 Event) -- 11/21/1980 --
BL-80-23 Failures of Solenoid Valves Manufactured by Valcor Engineering Corporation -- 11/14/1980 --
BL-80-22 Automation Industries, Model 200-520-008 Sealed-Source Connectors -- 09/11/1980 --
BL-80-21 Valve Yokes Supplied by Malcolm Foundry Company, Inc. -- 11/06/1980 --
BL-80-20 Failures of Westinghouse Type W-2 Spring Return to Neutral Control Switches -- 07/31/1980 --
BL-80-19 Failures of Mercury-Wetted Matrix Relays in Reactor Protective Systems of...Plants Designed by Combustion Engineering 1 08/13/1980 --
-- 07/31/1980 --
BL-80-18 Maintenance of Adequate Minimum Flow Thru Centrifugal Charging Pumps Following Secondary Side High Energy Line Rupture -- 07/24/1980 --
BL-80-17 Failure of 76 of 185 Control Rods to Fully Insert During a Scram at a BWR S5 02/13/1981 --
S4 12/18/1980 --
S3 08/22/1980 --
S2 07/22/1980 --
S1 07/18/1980 --
-- 07/03/1980 --
BL-80-16 Potential Misapplication of Rosemount...Models 1151 and 1152 Pressure Transmitters with Either "A" or "D" Output Codes -- 06/27/1980 --
BL-80-15 Possible Loss of Emergency Notification System (ENS) with Loss of Offsite Power -- 06/18/1980 --
BL-80-14 Degradation of Scram Discharge Volume Capability -- 06/12/1980 --
BL-80-13 Cracking in Core Spray Spargers -- 05/12/1980 --
BL-80-12 Decay Heat Removal System Operability -- 05/09/1980 --
BL-80-11 Masonry Wall Design – -- 05/08/1980 --
BL-80-10 Contamination of Nonradioactive System and Resulting Potential for Unmonitored, Uncontrolled Release to Environment -- 05/06/1980 --
BL-80-09 Hydramotor Actuator Deficiencies -- 04/17/1980 --
BL-80-08 Examination of Containment Liner Penetration Welds -- 04/07/1980 --
BL-80-07 BWR Jet Pump Assembly Failure – S1 05/13/1980 --
-- 04/04/1980 --
BL-80-06 Engineered Safety Feature (ESF) Reset Controls -- 03/13/1980 --
BL-80-05 Vacuum Condition Resulting in Damage to Chemical Volume Control System (CVCS) Holdup Tanks -- 03/10/1980 --
BL-80-04 Analysis of a PWR Main Steam Line Break with Continued Feedwater Addition -- 02/08/1980 --
BL-80-03 Loss of Charcoal from Standard Type II, 2 Inch, Tray Absorber Cells -- 02/06/1980 --
BL-80-02 Inadequate Quality Assurance for Nuclear Supplied Equipment -- 01/21/1980 --
BL-80-01 Operability of ADS Valve Pneumatic Supply -- 01/11/1980 --