Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Bulletins: 1988 Index

Document Number Title Revision Publish Date Reviewed Date
BL-88-11 Pressurizer Surge Line Thermal Stratification -- 12/20/1988 --
BL-88-10 Nonconforming Molded-Case Circuit Breakers S1 08/03/1989 --
-- 11/22/1988 --
BL-88-09 Thimble Tube Thinning in Westinghouse Reactors -- 07/26/1988 --
BL-88-08 Thermal Stresses in Piping Connected to Reactor Coolant Systems S3 04/11/1989 --
S2 08/04/1988 --
S1 06/24/1988 --
-- 06/22/1988 --
BL-88-07 Power Oscillations in Boiling Water Reactors (BWRs) S1 12/30/1988 --
-- 06/15/1988 --
BL-88-06 Actions To Be Taken for the Transportation of Model No. SPEC 2-T Radiographic Exposure Device -- 06/14/1988 --
BL-88-05 Nonconforming Materials Supplied by Piping Supplies, Inc. ... and West Jersey Manufacturing Company ... S2 08/03/1988 --
S1 06/15/1988 --
-- 05/06/1988 --
BL-88-04 Potential Safety-Related Pump Loss -- 05/05/1988 --
BL-88-03 Inadequate Latch Engagement in HFA Type Latching Relays Manufactured by General Electric (GE) Company -- 03/10/1988 --
BL-88-02 Rapidly Propagating Fatigue Cracks in Steam Generator Tubes -- 02/05/1988 --
BL-88-01 Defects in Westinghouse Circuit Breakers -- 02/05/1988 --

Page Last Reviewed/Updated Tuesday, March 09, 2021

Page Last Reviewed/Updated Tuesday, March 09, 2021