StandardReview Plan for the Review of Safety Analysis Reports for Nuclear Power Plants:LWR Edition — Initial Test Program and ITAAC-DesignCertification (NUREG-0800, Chapter 14)

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Section Title Rev. Date Updated
14.2 Initial Plant Test Program - Design Certification and New License Applicants Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 02/1979
Rev. 0 11/1975
14.2.1 Generic Guidelines for Extended Power Uprate Testing Programs Initial Issuance 08/2006
Draft Rev. 0 12/2002
14.3 Standard Plant Designs, Initial Test Program - Final Design Approval (FDA) [DELETED] Rev. 1 07/1981
Rev. 0 02/1979
14.3 Inspections, Tests, Analyses, and Acceptance Criteria Initial Issuance 03/2007
Draft Rev. 0 09/1996
14.3.1 [Reserved] [Reserved] 03/2007
Draft Rev. 0 06/1996
14.3.2 Structural and Systems Engineering - Inspections, Tests, Analyses, and Acceptance Criteria Initial Issuance 03/2007
Draft Rev. 0 06/1996
14.3.3 Piping Systems and Components - Inspections, Tests, Analyses, and Acceptance Criteria Rev. 1 09/2019
Draft Rev. 1 09/2018
Initial Issuance 03/2007
Draft Rev. 0 06/1996
14.3.4 Reactor Systems - Inspections, Tests, Analyses, and Acceptance Criteria Initial Issuance 03/2007
Draft Rev. 0 06/1996
14.3.5 Instrumentation and Controls - Inspections, Tests, Analyses, and Acceptance Criteria Initial Issuance 03/2007
Draft Rev. 0 06/1996
14.3.6 Electrical Systems - Inspections, Tests, Analyses, and Acceptance Criteria Initial Issuance 03/2007
Draft Rev. 0 06/1996
14.3.7 Plant Systems - Inspections, Tests, Analyses, and Acceptance Criteria Initial Issuance 03/2007
Draft Rev. 0 06/1996
14.3.8 Radiation Protection - Inspections, Tests, Analyses, and Acceptance Criteria Initial Issuance 03/2007
Draft Rev. 0 06/1996
14.3.9 Human Factors Engineering - Inspections, Tests, Analyses, and Acceptance Criteria Initial Issuance 03/2007
Draft Rev. 0 06/1996
14.3.10 Emergency Planning - Inspections, Tests, Analyses, and Acceptance Criteria Initial Issuance 03/2007
Draft Rev. 0 06/1996
14.3.11 Containment Systems - Inspections, Tests, Analyses, and Acceptance Criteria Initial Issuance 03/2007
Draft Rev. 0 06/1996
14.3.12 Physical Security Hardware - Inspections, Tests, Analyses, and Acceptance Criteria Draft Rev. 2 06/2016
Rev. 1
FRN
05/2010

Page Last Reviewed/Updated Thursday, March 25, 2021