StandardReview Plan for the Review of Safety Analysis Reports for Nuclear Power Plants:LWR Edition — Auxiliary Systems (NUREG-0800,Chapter 9)
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Section |
Title |
Rev. |
Date Updated |
9.1.1 |
Criticality Safety of Fresh and Spent Fuel Storage and Handling |
Rev. 3 |
03/2007 |
Draft Rev. 3 |
06/1996 |
Rev. 2 |
07/1981 |
Rev. 1 |
02/1978 |
Rev. 0 |
11/1975 |
9.1.2 |
New and Spent Fuel Storage |
Rev. 4 |
03/2007 |
Draft Rev. 4 |
06/1996 |
Rev. 3 |
07/1981 |
Rev. 2 |
03/1979 |
Rev. 1 |
03/1978 |
Rev. 0 |
11/1975 |
9.1.3 |
Spent Fuel Pool Cooling and Cleanup System |
Rev. 2 |
03/2007 |
Draft Rev. 2 |
06/1996 |
Rev. 1 |
07/1981 |
Rev. 0 |
11/1975 |
9.1.4 |
Light Load Handling System and Related Refueling Operations |
Rev. 4 |
07/2014 |
Draft Rev. 4 |
06/2013 |
Rev. 3 |
03/2007 |
Draft Rev. 3 |
06/1996 |
Rev. 2 |
07/1981 |
Rev. 1 |
04/1978 |
Rev. 0 |
11/1975 |
9.1.5 |
Overhead Heavy Load Handling Systems |
Rev. 1 |
03/2007 |
Draft Rev. 1 |
06/1996 |
Rev. 0 |
07/1981 |
9.2.1 |
Station Service Water System |
Rev. 5 |
03/2007 |
Draft Rev. 5 |
06/1996 |
Rev. 4 |
06/1986 |
Rev. 3 |
04/1984 |
Rev. 2 |
07/1981 |
Rev. 1 |
03/1978 |
Rev. 0 |
11/1975 |
9.2.2 |
Reactor Auxiliary Cooling Water Systems |
Rev. 4 |
03/2007 |
Draft Rev. 4 |
06/1996 |
Rev. 3 |
06/1986 |
Rev. 2 |
04/1984 |
Rev. 1 |
07/1981 |
Rev. 0 |
11/1975 |
9.2.3 |
Demineralized Water Makeup System |
Withdrawn |
12/1996 |
Draft Rev. 3 |
06/1996 |
Rev. 2 |
07/1981 |
Rev. 1 |
03/1978 |
Rev. 0 |
11/1975 |
9.2.4 |
Potable and Sanitary Water Systems |
Rev. 3 |
03/2007 |
Draft Rev. 3 |
06/1996 |
Rev. 2 |
07/1981 |
Rev. 1 |
03/1978 |
Rev. 0 |
11/1975 |
9.2.5 |
Ultimate Heat Sink |
Rev. 3 |
03/2007 |
Draft Rev. 3 |
06/1996 |
Rev. 2 |
07/1981 |
Rev. 1 |
03/1978 |
Rev. 0 |
11/1975 |
9.2.6 |
Condensate Storage Facilities |
Rev. 3 |
03/2007 |
Draft Rev. 3 |
06/1996 |
Rev. 2 |
07/1981 |
Rev. 1 |
03/1978 |
Rev. 0 |
11/1975 |
9.2.7 |
Chilled Water |
Rev. 0 |
09/2015 |
Draft Rev. 0 |
07/2014 |
9.3.1 |
Compressed Air System |
Rev. 2 |
03/2007 |
Draft Rev. 2 |
06/1996 |
Rev. 1 |
07/1981 |
Rev. 0 |
11/1975 |
9.3.2 |
Process and Post-accident Sampling Systems |
Rev. 3 |
03/2007 |
Draft Rev. 3 |
06/1996 |
Rev. 2 |
07/1981 |
Rev. 1 |
07/1978 |
Rev. 0 |
11/1975 |
9.3.3 |
Equipment and Floor Drainage System |
Rev. 3 |
03/2007 |
Draft Rev. 3 |
06/1996 |
Rev. 2 |
07/1981 |
Rev. 1 |
03/1978 |
Rev. 0 |
11/1975 |
9.3.4 |
Chemical and Volume Control System (PWR) (Including Boron Recovery System) |
Rev. 3 |
03/2007 |
Draft Rev. 3 |
06/1996 |
Rev. 2 |
07/1981 |
Rev. 1 |
03/1978 |
Rev. 0 |
11/1975 |
9.3.5 |
Standby Liquid Control System (BWR) |
Rev. 3 |
03/2007 |
Draft Rev. 3 |
06/1996 |
Rev. 2 |
07/1981 |
Rev. 1 |
03/1978 |
Rev. 0 |
11/1975 |
9.4.1 |
Control Room Area Ventilation System |
Rev. 3 |
03/2007 |
Draft Rev. 3 |
06/1996 |
Rev. 2 |
07/1981 |
Rev. 1 |
03/1978 |
Rev. 0 |
11/1975 |
9.4.2 |
Spent Fuel Pool Area Ventilation System |
Rev. 3 |
03/2007 |
Draft Rev. 3 |
06/1996 |
Rev. 2 |
07/1981 |
Rev. 1 |
03/1978 |
Rev. 0 |
11/1975 |
9.4.3 |
Auxiliary and Radwaste Area Ventilation System |
Rev. 3 |
03/2007 |
Draft Rev. 3 |
06/1996 |
Rev. 2 |
07/1981 |
Rev. 1 |
03/1978 |
Rev. 0 |
11/1975 |
9.4.4 |
Turbine Area Ventilation System |
Rev. 3 |
03/2007 |
Draft Rev. 3 |
06/1996 |
Rev. 2 |
07/1981 |
Rev. 1 |
03/1978 |
Rev. 0 |
11/1975 |
9.4.5 |
Engineered Safety Feature Ventilation System |
Rev. 3 |
03/2007 |
Draft Rev. 3 |
06/1996 |
Rev. 2 |
07/1981 |
Rev. 1 |
03/1978 |
Rev. 0 |
11/1975 |
9.5.1.1 |
Fire Protection Program
* The section was formerly 9.5.1, Rev.5 and is being issued as 9.5.1.1 to reflect re-numbering as result of issuance of the new SRP Section 9.5.1.2. |
Rev. 0 |
03/2009 |
Rev. 5* |
03/2007 |
Rev. 4 |
10/2003 |
Draft Rev. 4 |
06/1996 |
Rev. 3 |
07/1981 |
Rev. 2 |
03/1978 |
Rev. 1 |
05/1976 |
Rev. 0 |
11/1975 |
9.5.1.2 |
Risk-Informed (RI), Performance-Based (PB) Fire Protection Program (FPP) |
Rev. 0 Issued Final, see FRN |
12/2009 |
9.5.2 |
Communications Systems |
Rev. 3 |
03/2007 |
Draft Rev. 3 |
06/1996 |
Rev. 2 |
07/1981 |
Rev. 1 |
04/1978 |
Rev. 0 |
11/1975 |
9.5.3 |
Lighting Systems |
Rev. 3 |
03/2007 |
Draft Rev. 3 |
06/1996 |
Rev. 2 |
07/1981 |
Rev. 1 |
04/1978 |
Rev. 0 |
11/1975 |
9.5.4 |
Emergency Diesel Engine Fuel Oil Storage and Transfer System |
Rev. 3 |
03/2007 |
Draft Rev. 3 |
06/1996 |
Rev. 2 |
07/1981 |
Rev. 1 |
04/1978 |
Rev. 0 |
11/1975 |
9.5.5 |
Emergency Diesel Engine Cooling Water System |
Rev. 3 |
03/2007 |
Draft Rev. 3 |
06/1996 |
Rev. 2 |
07/1981 |
Rev. 1 |
04/1978 |
Rev. 0 |
11/1975 |
9.5.6 |
Emergency Diesel Engine Starting System |
Rev. 3 |
03/2007 |
Draft Rev. 3 |
06/1996 |
Rev. 2 |
07/1981 |
Rev. 1 |
04/1978 |
Rev. 0 |
11/1975 |
9.5.7 |
Emergency Diesel Engine Lubrication System |
Rev. 3 |
03/2007 |
Draft Rev. 3 |
06/1996 |
Rev. 2 |
07/1981 |
Rev. 1 |
04/1978 |
Rev. 0 |
11/1975 |
9.5.8 |
Emergency Diesel Engine Combustion Air Intake and Exhaust System |
Rev. 3 |
03/2007 |
Draft Rev. 3 |
06/1996 |
Rev. 2 |
07/1981 |
Rev. 1 |
04/1978 |
Rev. 0 |
11/1975 |