Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

StandardReview Plan for the Review of Safety Analysis Reports for Nuclear Power Plants:LWR Edition — Initial Test Program and ITAAC-DesignCertification (NUREG-0800, Chapter 14)

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Section Title Rev. Date Updated
14.2 Initial Plant Test Program - Design Certification and New License Applicants Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 02/1979
Rev. 0 11/1975
14.2.1 Generic Guidelines for Extended Power Uprate Testing Programs Initial Issuance 08/2006
Draft Rev. 0 12/2002
14.3 Standard Plant Designs, Initial Test Program - Final Design Approval (FDA) [DELETED] Rev. 1 07/1981
Rev. 0 02/1979
14.3 Inspections, Tests, Analyses, and Acceptance Criteria Initial Issuance 03/2007
Draft Rev. 0 09/1996
14.3.1 [Reserved] [Reserved] 03/2007
Draft Rev. 0 06/1996
14.3.2 Structural and Systems Engineering - Inspections, Tests, Analyses, and Acceptance Criteria Initial Issuance 03/2007
Draft Rev. 0 06/1996
14.3.3 Piping Systems and Components - Inspections, Tests, Analyses, and Acceptance Criteria Rev. 1 09/2019
Draft Rev. 1 09/2018
Initial Issuance 03/2007
Draft Rev. 0 06/1996
14.3.4 Reactor Systems - Inspections, Tests, Analyses, and Acceptance Criteria Initial Issuance 03/2007
Draft Rev. 0 06/1996
14.3.5 Instrumentation and Controls - Inspections, Tests, Analyses, and Acceptance Criteria Initial Issuance 03/2007
Draft Rev. 0 06/1996
14.3.6 Electrical Systems - Inspections, Tests, Analyses, and Acceptance Criteria Initial Issuance 03/2007
Draft Rev. 0 06/1996
14.3.7 Plant Systems - Inspections, Tests, Analyses, and Acceptance Criteria Initial Issuance 03/2007
Draft Rev. 0 06/1996
14.3.8 Radiation Protection - Inspections, Tests, Analyses, and Acceptance Criteria Initial Issuance 03/2007
Draft Rev. 0 06/1996
14.3.9 Human Factors Engineering - Inspections, Tests, Analyses, and Acceptance Criteria Initial Issuance 03/2007
Draft Rev. 0 06/1996
14.3.10 Emergency Planning - Inspections, Tests, Analyses, and Acceptance Criteria Initial Issuance 03/2007
Draft Rev. 0 06/1996
14.3.11 Containment Systems - Inspections, Tests, Analyses, and Acceptance Criteria Initial Issuance 03/2007
Draft Rev. 0 06/1996
14.3.12 Physical Security Hardware - Inspections, Tests, Analyses, and Acceptance Criteria Draft Rev. 2 06/2016
Rev. 1
FRN
05/2010