The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.
StandardReview Plan for the Review of Safety Analysis Reports for Nuclear Power Plants:LWR Edition — Reactor Coolant System and Connected Systems (NUREG-0800,Chapter 5)
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
| Section | Title | Rev. | Date Updated |
|---|---|---|---|
| 5.2.1.1 | Compliance with the Codes and Standards Rule, 10 CFR 50.55a | Rev. 4 | 12/2016 |
| Draft Rev. 4 | 08/2015 | ||
| Rev. 3 | 03/2007 | ||
| Draft Rev. 3 | 06/1996 | ||
| Rev. 2 | 07/1981 | ||
| Rev. 1 | 01/1978 | ||
| Rev. 0 | 11/1975 | ||
| 5.2.1.2 | Applicable Code Cases | Rev. 4 | 12/2016 |
| Draft Rev. 4 | 08/2015 | ||
| Rev. 3 | 03/2007 | ||
| Draft Rev. 3 | 06/1996 | ||
| Rev. 2 | 07/1981 | ||
| Rev. 1 | 01/1978 | ||
| Rev. 0 | 11/1975 | ||
| 5.2.2 | Overpressure Protection | Rev. 3 | 03/2007 |
| Draft Rev. 3 | 06/1996 | ||
| Rev. 2 | 11/1988 | ||
| Rev. 1 | 07/1981 | ||
| Rev. 0 | 11/1975 | ||
| 5.2.3 | Reactor Coolant Pressure Boundary Materials | Rev. 3 | 03/2007 |
| Draft Rev. 3 | 06/1996 | ||
| Rev. 2 | 07/1981 | ||
| Rev. 1 | 04/1978 | ||
| Rev. 0 | 11/1975 | ||
| 5.2.4 | Reactor Coolant Pressure Boundary Inservice Inspection and Testing | Rev. 2 | 03/2007 |
| Draft Rev. 2 | 06/1996 | ||
| Rev. 1 | 07/1981 | ||
| Rev. 0 | 11/1975 | ||
| 5.2.5 | Reactor Coolant Pressure Boundary Leakage Detection | Rev. 2 | 03/2007 |
| Draft Rev. 2 | 06/1996 | ||
| Rev. 1 | 07/1981 | ||
| Rev. 0 | 11/1975 | ||
| 5.3.1 | Reactor Vessel Materials | Rev. 2 | 03/2007 |
| Draft Rev. 2 | 06/1996 | ||
| Rev. 1 | 07/1981 | ||
| Rev. 0 | 11/1975 | ||
| 5.3.2 | Pressure-Temperature Limits, Upper-Shelf Energy, and Pressurized Thermal Shock | Rev. 2 | 03/2007 |
| Draft Rev. 2 | 06/1996 | ||
| Rev. 1 | 07/1981 | ||
| Rev. 0 | 11/1975 | ||
| 5.3.3 | Reactor Vessel Integrity | Rev. 2 | 03/2007 |
| Draft Rev. 2 | 06/1996 | ||
| Rev. 1 | 07/1981 | ||
| Rev. 0 | 11/1975 | ||
| 5.4 | Reactor Coolant System Component and Subsystem Design | Rev. 2 | 03/2007 |
| Draft Rev. 2 | 06/1996 | ||
| Rev. 1 | 07/1981 | ||
| Rev. 0 | 11/1975 | ||
| 5.4.1.1 | Pump Flywheel Integrity (PWR) | Rev. 3 | 05/2010 |
| Rev. 2 | 03/2007 | ||
| Draft Rev. 2 | 06/1996 | ||
| Rev. 1 | 07/1981 | ||
| Rev. 0 | 11/1975 | ||
| 5.4.2.1 | Steam Generator Materials and Design | Rev. 4 | 07/2016 |
| Draft Rev. 4 | 04/2016 | ||
| Rev. 3 | 03/2007 | ||
| Draft Rev. 3 | 06/1996 | ||
| Rev. 2 | 07/1981 | ||
| Rev. 1 | 11/1978 | ||
| Rev. 0 | 11/1975 | ||
| 5.4.2.2 | Steam Generator Program | Rev. 2 | 03/2007 |
| Draft Rev. 2 | 06/1996 | ||
| Rev. 1 | 07/1981 | ||
| Rev. 0 | 11/1975 | ||
| 5.4.6 | Reactor Core Isolation Cooling System (BWR) | Rev. 4 | 03/2007 |
| Draft Rev. 4 | 06/1996 | ||
| Rev. 3 | 04/1984 | ||
| Rev. 2 | 07/1981 | ||
| Rev. 1 | 03/1978 | ||
| Rev. 0 | 11/1975 | ||
| 5.4.7 | Residual Heat Removal (RHR) System | Rev. 5 | 05/2010 |
| Rev. 4 | 03/2007 | ||
| Draft Rev. 4 | 06/1996 | ||
| Rev. 3 | 04/1984 | ||
| Rev. 2 | 07/1981 | ||
| Rev. 1 | 08/1978 | ||
| Rev. 0 | 11/1975 | ||
| 5.4.8 | Reactor Water Cleanup System (BWR) | Rev. 3 | 03/2007 |
| Draft Rev. 3 | 06/1996 | ||
| Rev. 2 | 07/1981 | ||
| Rev. 1 | 07/1978 | ||
| Rev. 0 | 11/1975 | ||
| 5.4.11 | Pressurizer Relief Tank | Rev. 4 | 05/2010 |
| Rev. 3 | 03/2007 | ||
| Draft Rev. 3 | 06/1996 | ||
| Rev. 2 | 07/1981 | ||
| Rev. 1 | 08/1978 | ||
| Rev. 0 | 11/1975 | ||
| 5.4.12 | Reactor Coolant System High Point Vents | Rev. 1 | 03/2007 |
| Draft Rev. 1 | 06/1996 | ||
| Rev. 0 | 07/1981 | ||
| 5.4.13 | Isolation Condenser System (BWR) | Initial Issuance | 03/2007 |
| Branch Technical Positions (BTPs) | |||
| BTP 5-1 | Monitoring of Secondary Side Water Chemistry in PWR Steam Generators (Former Section 5.4.2.1 BTP has been separated into an individual section.) | Rev. 3 | 03/2007 |
| BTP 5-2 | Overpressurization Protection of Pressurized-Water Reactors While Operating at Low Temperatures (Former Section 5.2.2 BTP has been separated into an individual section.) | Rev. 3 | 03/2007 |
| BTP 5-3 | Fracture Toughness Requirements | Rev. 3 | 07/2018 |
| Rev. 2 | 03/2007 | ||
| BTP 5-4 | Design Requirements of the Residual Heat Removal System | Rev. 4 | 03/2007 |
Page Last Reviewed/Updated Thursday, August 27, 2026
Page Last Reviewed/Updated Thursday, August 27, 2026