Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

StandardReview Plan for the Review of Safety Analysis Reports for Nuclear Power Plants:LWR Edition — Reactor Coolant System and Connected Systems (NUREG-0800,Chapter 5)

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Section Title Rev. Date Updated
5.2.1.1 Compliance with the Codes and Standards Rule, 10 CFR 50.55a Rev. 4 12/2016
Draft Rev. 4 08/2015
Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 01/1978
Rev. 0 11/1975
5.2.1.2 Applicable Code Cases Rev. 4 12/2016
Draft Rev. 4 08/2015
Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 01/1978
Rev. 0 11/1975
5.2.2 Overpressure Protection Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 11/1988
Rev. 1 07/1981
Rev. 0 11/1975
5.2.3 Reactor Coolant Pressure Boundary Materials Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 04/1978
Rev. 0 11/1975
5.2.4 Reactor Coolant Pressure Boundary Inservice Inspection and Testing Rev. 2 03/2007
Draft Rev. 2 06/1996
Rev. 1 07/1981
Rev. 0 11/1975
5.2.5 Reactor Coolant Pressure Boundary Leakage Detection Rev. 2 03/2007
Draft Rev. 2 06/1996
Rev. 1 07/1981
Rev. 0 11/1975
5.3.1 Reactor Vessel Materials Rev. 2 03/2007
Draft Rev. 2 06/1996
Rev. 1 07/1981
Rev. 0 11/1975
5.3.2 Pressure-Temperature Limits, Upper-Shelf Energy, and Pressurized Thermal Shock Rev. 2 03/2007
Draft Rev. 2 06/1996
Rev. 1 07/1981
Rev. 0 11/1975
5.3.3 Reactor Vessel Integrity Rev. 2 03/2007
Draft Rev. 2 06/1996
Rev. 1 07/1981
Rev. 0 11/1975
5.4 Reactor Coolant System Component and Subsystem Design Rev. 2 03/2007
Draft Rev. 2 06/1996
Rev. 1 07/1981
Rev. 0 11/1975
5.4.1.1 Pump Flywheel Integrity (PWR) Rev. 3 05/2010
Rev. 2 03/2007
Draft Rev. 2 06/1996
Rev. 1 07/1981
Rev. 0 11/1975
5.4.2.1 Steam Generator Materials and Design Rev. 4 07/2016
Draft Rev. 4 04/2016
Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 11/1978
Rev. 0 11/1975
5.4.2.2 Steam Generator Program Rev. 2 03/2007
Draft Rev. 2 06/1996
Rev. 1 07/1981
Rev. 0 11/1975
5.4.6 Reactor Core Isolation Cooling System (BWR) Rev. 4 03/2007
Draft Rev. 4 06/1996
Rev. 3 04/1984
Rev. 2 07/1981
Rev. 1 03/1978
Rev. 0 11/1975
5.4.7 Residual Heat Removal (RHR) System Rev. 5 05/2010
Rev. 4 03/2007
Draft Rev. 4 06/1996
Rev. 3 04/1984
Rev. 2 07/1981
Rev. 1 08/1978
Rev. 0 11/1975
5.4.8 Reactor Water Cleanup System (BWR) Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 07/1978
Rev. 0 11/1975
5.4.11 Pressurizer Relief Tank Rev. 4 05/2010
Rev. 3 03/2007
Draft Rev. 3 06/1996
Rev. 2 07/1981
Rev. 1 08/1978
Rev. 0 11/1975
5.4.12 Reactor Coolant System High Point Vents Rev. 1 03/2007
Draft Rev. 1 06/1996
Rev. 0 07/1981
5.4.13 Isolation Condenser System (BWR) Initial Issuance 03/2007
  Branch Technical Positions (BTPs)    
BTP 5-1 Monitoring of Secondary Side Water Chemistry in PWR Steam Generators (Former Section 5.4.2.1 BTP has been separated into an individual section.) Rev. 3 03/2007
BTP 5-2 Overpressurization Protection of Pressurized-Water Reactors While Operating at Low Temperatures (Former Section 5.2.2 BTP has been separated into an individual section.) Rev. 3 03/2007
BTP 5-3 Fracture Toughness Requirements Rev. 3 07/2018
Rev. 2 03/2007
BTP 5-4 Design Requirements of the Residual Heat Removal System Rev. 4 03/2007

Page Last Reviewed/Updated Wednesday, March 24, 2021

Page Last Reviewed/Updated Wednesday, March 24, 2021